12
Views
6
CrossRef citations to date
0
Altmetric
Original Articles

Air Monitoring at the Drum Bulking Process of a Hazardous Waste Remedial Action Site

, , &
Pages 192-196 | Published online: 04 Jun 2010
 

Abstract

Air monitoring was performed at a hazardous waste remedial action site to measure inhalation exposure at the drum bulking unit processes and ambient emissions downwind from that process. Contaminant concentrations were all well below permissible exposure limits. This study suggests that when workers remain in fixed job locations at hazardous waste sites, occupational inhalation exposure monitoring must consider contaminants generated upwind of the job location as well as contaminants generated at the specific job site. Air sampling must also consider both the particulate and vapor phases of the site contaminants.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.