70
Views
0
CrossRef citations to date
0
Altmetric
Technical Notes

Operational Maintenance Philosophy for Tritium Processing Systems

Pages 422-425 | Received 17 Apr 2016, Accepted 27 Sep 2016, Published online: 05 Apr 2017
 

Abstract

The high contamination potential of the release of radioactive tritium facilitates the demand for and development of a stringent and comprehensive approach to operational maintenance of tritium systems. Prompt and efficient maintenance is necessary to ensure the accepted operational safety basis is adhered to and a continued safe state of operation is achieved. This will help to mitigate and avoid potential hazards that result from a tritium release to the public and facility personnel. Because of the hazards associated with a release of tritium contamination the process systems are in large kept within a series of inerted glovebox environments that must be maintained to keep structural integrity. The nature of a tritium release from a glovebox could have significant consequences for the general public as well as for personnel. As such, the maintenance philosophy is developed to help facilitate operations in the adherence to the facility’s safety code of conduct.

To effectively facilitate the safe operation goals mentioned a well-defined maintenance philosophy has been developed that encompasses routine and non-routine maintenance activities. Examples of routine activities include preventative maintenance such as line-break inspections, helium leak tests to ensure components are leak tight, weld inspections and overall surveillance testing of essential components and infrastructure. Predictive maintenance also falls into this category. Predictive maintenance activities are developed over time in response to non-routine maintenance work. Non-routine maintenance or corrective maintenance activities are performed in response to a specific failure or to resolve a particular inadequacy in performance of tritium systems. When corrective maintenance is performed trends are often studied and more predictive maintenance can be scheduled to compensate for more routine failures.

This technical note will identify key operational maintenance considerations which when applied, will ensure that tritium handling systems are operated safely.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.