599
Views
44
CrossRef citations to date
0
Altmetric
Original Articles

Effects of Countdown Timers on Driver Behavior After the Yellow Onset at Chinese Intersections

, &
Pages 538-544 | Received 06 Apr 2011, Accepted 25 May 2011, Published online: 05 Oct 2011
 

Abstract

Objectives: Few studies have focused on the effect of countdown timers at signalized intersections in China, where such timers are widely deployed for their perceived benefits of increased safety and capacity. This study examines the effect of countdown timers on driver behavior during the yellow interval.

Method: Signal phasing and traffic operations were videotaped at 4 comparable signalized intersections under normal conditions. Microscopic details were extracted manually at 25 Hz to yield 24 h of data on onset time of the yellow, onset time of the red, driver location and actions after the onset of the yellow, red light–running violations, etc. For comparable intersections with and without countdown timers, driver behavior measured by driver decision (stop or go) and vehicle entry time (when the vehicle crosses the stop line) were analyzed using binary logistical regression (BLR) and a nonparametric test, respectively.

Results: The results suggest that countdown timers can indeed influence driver behaviors, in terms of decisions to stop or cross the intersection as well as the distribution of vehicle entry times. There was a strong correlation between the presence of countdown timers and an increase in red light violations.

Conclusion: Countdown timers may lead to increased entrance into the intersection during the later portions of the yellow and even the red. This alarming finding calls for further research as well as for serious consideration before the field deployment of countdown timers.

ACKNOWLEDGMENTS

This study was jointly sponsored by China's Key Projects in the National Science & Technology Pillar Program in the Eleventh Five-Year Plan Period (No. 2009BAG13A02); the Scientific & Technology Program of Hunan Province, China (No. 2010WK4001); and the Scientific Project of Department of Transportation of Guangdong, China (No. 2010-02-038). The authors are grateful for the assistance of Xue-xue Gong, Sai-zheng Wang, and Linru He for collecting data in the field.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.