Publication Cover
LEUKOS
The Journal of the Illuminating Engineering Society
Volume 18, 2022 - Issue 4
201
Views
2
CrossRef citations to date
0
Altmetric
Articles

Road Marking Contrast Threshold Revisited

ORCID Icon, ORCID Icon, & ORCID Icon
Pages 493-512 | Received 18 Nov 2020, Accepted 12 Oct 2021, Published online: 16 Dec 2021
 

ABSTRACT

Sufficient contrast between road surface and road markings is key for a safe and comfortable driving experience. This calls for a comprehensive and well established contrast (threshold) model, which ideally results in a single contrast threshold value independent of object angular size or road luminance. The contrast threshold model introduced by Adrian is still commonly used in road lighting. More recently, new contrast metrics that also predict supra-threshold contrast visibility have been proposed, but the corresponding visibility thresholds are not yet known. In the present study, participants are presented a rendering of a highway, including road marking arrows of various size and luminance and were asked to indicate the direction of the arrow. The luminance of the road surface, acting as background for the markings, was varied too. Due to the very low luminance values and the very small differences in luminance, measurement accuracy and calibration issues require special attention. The results show good agreement with Adrian’s visibility model (R2 = 0.75) in terms of luminance contrast, background luminance and size. In addition, we used our experimental data to define contrast thresholds for several other existing image based contrast models. Unfortunately, it seems to be impossible to state one unique threshold contrast value independent of object angular size and road luminance.

Acknowledgments

The authors would like to thank Willem Zandvliet and Duco Schreuder for their valuable feedback and comments.

Disclosure statement

No potential conflict of interest was reported by the author(s).

Supplementary material

Supplemental data for this article can be accessed on the publisher’s website.

Notes

1 R2 throughout the paper refers to the Coefficient of Determination.

Additional information

Funding

This research was financed and supported by the Directorate-General for Public Works and Water Management Rijkswaterstaat (The Netherlands). The first author was supported by the grant.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.