278
Views
2
CrossRef citations to date
0
Altmetric
Research Article

Renewable energy based charging station with power quality features for multi EV spots using maximum correntropy sub-band adaptive technique

& ORCID Icon
Pages 1710-1730 | Received 29 Nov 2021, Accepted 04 Mar 2022, Published online: 24 Mar 2022
 

ABSTRACT

Here, a photovoltaic (PV)-based multi-spots electric vehicles (EVs) charging station (CS) is presented by using maximum correntropy criteria with affine projection sub-band adaptive filter (MCC-APSAF). The presented CS also includes the features of power quality at nonlinear loads connected at the point of common coupling (PCC). This CS comprises a battery bank, multi-EV batteries, and ultra-capacitor (UC) charging spots. However, a dramatic increase of EVs and charging stations in the existing grid has raised the issues related to the harmonics, voltage fluctuations, reactive power, and burden on the grid. These issues are addressed in the presented charging station. Moreover, the ultra-capacitor can provide fast charging, which minimizes the high inrush current of the CS. Therefore, the batteries during the high EVs load at the CS are protected by the ultra-capacitor spots. To stabilize the DC bus voltage, separate cascaded controllers for ultra-capacitor and battery spots are used. The CS shows the multifunctional capabilities, which include PV array to grid (PV2G), PV array to the EV battery (S2EVB), EV battery to grid (EVB2G), and PV array to home (PV2H) when PV source is present. The various EVB2G, G2EVB, battery to home (EVB2H), and grid to home (G2H) behaviors are also presented. This CS shows good dynamic efficacy under insolation variation, EVB2G, G2EVB modes, load throw, and load reconnection operations. The grid current THD using the proposed current control is 1.44%, which is in accordance with the IEEE-519 standard. Moreover, the maximum power obtained from the PV generation is 63 kW, which is successfully distributed in the battery bank and six EV batteries (30 kW), in nonlinear load (14 kW), and the rest of the power is injected to the grid (29 kW). This CS is simulated in the MATLAB/Simulink library and test results are obtained using the experimental workbench with OPAL-RT (OP5600) in the laboratory.

Nomenclature

Acknowledgments

The authors thank the Science and Engineering Research Board, India for supporting this work under the (SRG/2020/001742) grant.

Disclosure statement

No potential conflict of interest was reported by the author(s).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.