An Economic Model for the Revamping of a Pulverized Coal-fired Boiler

Pages 307-313 | Received 10 Dec 2010, Accepted 31 Dec 2010, Published online: 16 Oct 2013
 

Abstract

Equipping existing thermal power plants (TPPs) with newer technologies, such as fluidized bed combustion (FBC), is vital for many countries due to concerns about the economy, the environment, and energy policy. First, this study presents a general model for economic analysis of the revamping of a pulverized coal-fired boiler with FBC. Second, the developed model is applied to a 140 MW pulverized coal-fired TPP. Third, the payback period (PBP) is calculated by using the net present value (NPV) method. Finally, the effects of almost all technical and economic parameters, such as power loss, electricity price, and escalation rate are investigated on PBP and NPV. As a result, the outcomes of this study show that power loss has a significant effect on PBP and NPV.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.