Minimal global regret analysis for electricity generation expansion

, &
 

ABSTRACT

A comparative assessment of alternative expansion plans for the Mexican electricity generation system was made by applying the Position Vector of Minimum Regret Analysis as a decision tool. The expansion plans were ranked according to seven decision criteria which consider: internal cost, risk, diversity, external cost, foreign capital fraction, carbon-free fraction, and severe accidents. Electricity expansions were optimized by using the WASP-IV model; internal costs and externalities over a long-term planning horizon were simultaneously minimized when the external cost was added into the variable component of the operation and maintenance cost. Special attention was paid to studying the convenience of including nuclear power in the electricity expansion. The new decision analysis tool ranked the plans in terms of the minimum global regret, and results showed that the plans which added nuclear power plants were in general relatively more attractive than the plans that did not.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.