44
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

Innovation in Construction – Experiences from a Hypocaust System in Australia

Pages 63-74 | Published online: 10 Feb 2014
 

Abstract

Introducing new technologies poses a particular challenge to the players involved in a project. For a successful low energy building, a new design process is required and players must assume new and additional responsibilities. Hypocaust systems, where conditioned or non-conditioned air is passed through ducts within the concrete floor or ceiling of a building prior to its delivery to the rooms, are starting to appear in new buildings in Australia. This paper describes the lessons learned from the early experiences with a hypocaust system, installed in a new building in Melbourne. It concludes that a more cooperative process among all those involved in introducing and using a new ‘technology’ is essential if the problems described are to be avoided or at least minimized.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.