361
Views
9
CrossRef citations to date
0
Altmetric
Original Articles

Dynamic simulation of the sudden settlement of a mine waste dump under earthquake loading

, &
Pages 425-443 | Received 31 Jul 2017, Accepted 30 May 2018, Published online: 18 Jun 2018
 

Abstract

The stability of waste dumps of former open-pit mines must be guaranteed for its use on construction and other activities. In this work, a sandy waste dump subjected to a seismic event is carefully analysed. Its sudden settlement is simulated with a Boundary Value Problem (BVP) under dynamic conditions. The Intergranular Strain Anisotropy (ISA) constitutive model, able to simulate the behaviour of sands under monotonic and cyclic loading, is used for this purpose. The model revealed some unloaded zones due to the mining process, and showed that compacted dumps may experience significant settlement after a seismic event.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.