189
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

Impact of the ‘5.12’ Wenchuan earthquake on Zipingpu concrete face rock-fill dam and its analysis

&
Pages 299-306 | Received 26 Sep 2008, Accepted 11 Jun 2009, Published online: 30 Nov 2009
 

Abstract

The ‘5.12’ Wenchuan Earthquake hit Zipingpu concrete rock-fill dam hard and rendered a maximum permanent settlement of 100 cm and a horizontal displacement of 60 cm to the dam. Such a large permanent deformation due to earthquake has brought about a large area of separation between the concrete face and the cushion layer plane, resulting in an obvious dislocation of the construction joints of the concrete face above the reservoir water level and a crushed damage of the vertical joints of the concrete face. The damage mechanism has been analysed according to the field investigation. Proposals are also put forward for the future analytical computation of the earthquake impact on the concrete face rock-fill dam, anti-seism design and the principle of rehabilitation of the Zipingpu concrete rock-fill dam after the quake as well.

Acknowledgement

This work was funded by Major Research Plan of National Nature Science Foundation of China under Contract No.90815024, and by National Basic Research Development Program (973) of China under Contract No.2007CB714100.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.