943
Views
2
CrossRef citations to date
0
Altmetric
Article

The politicization of public–private partnerships following a mega-project disaster: the case of the Morandi Bridge Collapse

, ORCID Icon &
Pages 173-189 | Received 11 Feb 2019, Accepted 21 Apr 2020, Published online: 13 May 2020
 

ABSTRACT

Drawing on the collapse of Morandi bridge (Genoa, Italy) exemplar and unique case and by applying a content analysis to the declarations made by politicians in the subsequent months after the tragedy, the paper highlights how longstanding debates about the relative merits of concessions vis a vis direct public operations can become the terrain of intense political contestation in the wake of a public tragedy. In particular, it shows how PPPs predicated on transferring risks to the partner best able to manage them create opportunities for blame shifting by politicians, bureaucracies and firms when failures occur.

Supplementary material

Supplemental data for this article can be accessed here

Notes

1. Mont Blanc Tunnel is jointly run by two companies French ATMB and Italian SITMB. The latter is part of Società Autostrade (ASPI) and was privatized together with its parent company.

2. At the time of writing, two private groups, Atlantia (which controls Autostrade SpA, in the meantime transformed in Autostrade per l’Italia – ASPI) and SIAS, manage 70% of the Italian road network (Vecchi and Cusumano Citation2019).

3. The new contract became fully operational only in 2008, thanks to a special law, so-called “salva Benetton” (help Benetton). The law was meant to overcome issues raised by two technical bodies in charge of providing recommendations on concession contracts. The revised contract actually introduced a derogatory tariff-adjusting mechanism for ASPI concession compared to the standard formula. Whereas the standard mechanism is based on a price cap model, in ASPI concession the productivity dimension is dropped and basically, the tariff is indexed at 70% of actual inflation rate, plus a residual component to reward specific investments.

4. Calculations based on ASECAT (2018) data.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.