203
Views
3
CrossRef citations to date
0
Altmetric
Articles

A novel hybrid SA/GA algorithm for solving an integrated cell formation–job scheduling problem with sequence-dependent set-up times

, , &
Pages 134-142 | Received 16 Jan 2014, Accepted 21 Dec 2014, Published online: 03 Mar 2015
 

Abstract

Cell formation problems attempt to assign machines and products to manufacturing cells so as to minimize inter-cell moves, in which some other aspects of the manufacturing system, such as time of order delivery, have been mostly neglected. To fill the gap, this paper addresses the cell formation problem and job scheduling simultaneously. To this end, a mixed integer nonlinear program is proposed to address issues related to both cell formation and job scheduling in a job shop layout. The proposed model minimizes the costs of operations and transportation in a single-period setting, since the problem considered is a strategic problem. Moreover, a hybrid simulated-annealing/genetic (SA/GA) algorithm is developed to cope with the complexity of the proposed model. Finally, numerical experiments are reported that validate the performance of the hybrid algorithm developed.

Keywords::

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.