302
Views
1
CrossRef citations to date
0
Altmetric
Articles

Dynamic group job shop scheduling

Pages 41-49 | Received 11 Feb 2014, Accepted 31 Jul 2014, Published online: 09 Sep 2014
 

Abstract

This paper presents a dynamic Pareto-optimal method for flexible job shop scheduling based on two criteria simultaneously: the relative manufacturing cost criterion and the average orders utility criterion. Group scheduling for a given set of jobs with due dates that are typical for a ‘make-to-order’ strategy is considered. In this method the concept of production intensity as a dynamic production process parameter is used. A software package allows scheduling for a medium quantity of jobs. The result of software application is the set of non-dominant versions proposed to a user for making a final choice.

JEL Classification::

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.