Bioenergy feasibility study of a raw corn and peas processing facility in Lethbridge, Alberta

, , &
Pages 263-272 | Received 24 Feb 2016, Accepted 19 Jul 2016, Published online: 15 Sep 2017
 

ABSTRACT

A bioenergy feasibility study was conducted for Canada Safeway on their Lucerne vegetable processing plant located in Lethbridge, Alberta. An energy load profile for the plant was estimated using utility records from the years 2005 to 2007, inclusive. Organic load was calculated from the wastewater utility records for the same period. The study used a common energy unit (the kilowatt, kW) to compare plant energy load with a theoretical biogas yield, and proposes a bioenergy system. Based on two existing cogeneration plants of similar size located in Alberta, a system size of 800 to 1000 kW is proposed. The proposed system assumes wastewater ‘peak shaving’ and the establishment of ‘feedstock co-digestion’. An estimated cost for the facility is CCanadian Dollar (AD) 7M to CAD 8M (2002 dollars), with an assumed return on investment of 8 to 9 years.

Acknowledgements

University of Calgary, Canada, and collaborating organizations are acknowledged for providing necessary infrastructure.

Disclosure statement

No potential conflict of interest was reported by the authors.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.