Publication Cover
Transportation Letters
The International Journal of Transportation Research
Volume 15, 2023 - Issue 6
318
Views
1
CrossRef citations to date
0
Altmetric
Research Article

Charging infrastructure planning for ride-sourcing electric vehicles considering drivers’ value of time

& ORCID Icon
 

ABSTRACT

A reliable-charging network is urgently demanded to support electrified ride-sourcing services due to their shorter dwell time, longer daily vehicle miles traveled, and concerns of sacrificing revenue for charging activities. We developed an integer programming (IP) model for the optimal allocation of charging stations and charging plugs to minimize the total investment costs and spatio-temporal varying drivers’ value of time (VOT) for charging activities. The trip chain data of the RideAustin ride-sourcing services have been used as a test case, based on which we estimated the charging needs of ride-sourcing EVs and identified candidate charging locations to fulfill the daily travel needs of ride-sourcing drivers. Through numerical study and sensitivity analyses, we analyze the impacts of different charger types, fleet sizes, government incentives, and VOT considerations on the optimal investment plans and system costs, and show the importance of considering ride-sourcing drivers’ VOT into charging infrastructure planning.

Acknowledgments

The efforts of Md Rakibul Alam were partially supported by the University of Central Florida ORC fellowship. We thank Tadeas Lobreis for his efforts on processing the input data from RideAustin for the purpose of this study.

Disclosure statement

No potential conflict of interest was reported by the author(s).

Notes

1. We assume 20% SOC as a threshold to avoid excessive discharge, which may cause permanent battery capacity loss (BatteryUniversity Citation2021). In addition, ride-sourcing vehicles may need to maintain an energy buffer in case of emergency.

2. According to https://www.linkedin.com/pulse/what-you-need-know-ev-charging-station-maintenance-nolan-rutschilling/, Level 1/2 chargers have an expected lifespan of 10 years. However, DCFC requires more maintenance compared with Level 1/2 chargers. Therefore, we allocate initial capital costs to a 5-year planning horizon for a more conservative estimation.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.