176
Views
11
CrossRef citations to date
0
Altmetric
Articles

The role of SWRO Barcelona-Llobregat Plant in the water supply system of Barcelona Area

&
Pages 111-123 | Received 14 Mar 2012, Accepted 29 May 2012, Published online: 27 Jun 2012
 

Abstract

Barcelona-Llobregat Desalination Plant is actually the largest seawater desalination plant in Europe producing potable water from the seawater of the Mediterranean Sea. The plant is able to supply approximately the 20% of tap water of Barcelona Metropolitan area having a maximum capacity of 200,000 cubic meters per day. This project was developed by Aigües Ter-Llobregat, public company of the Catalonian Government (Generalitat of Catalonian) to face the lack of water resources and to improve the water quality in Barcelona’s south area. A Joint Venture of Degrémont, Aigües de Barcelona and Dragados-Drace built the plant during a severe drought period in a extremely tight delivery time of 24 months. The plant was inaugurated on July 2009 and from this date the same JV is operating it. Barcelona-Llobregat SWRO plant won the Global Water Awards 2010 as the Desalination Plant of the year. A pilot plant was operating for two years to help in design and for getting experience with Mediterranean seawater. The facilities are located in El Prat, an industrial area between Barcelona Harbour and Llobregat mouth, just close to one of the waste water treatment plants of Barcelona, DepurBaix. A deep intake located 2 km offshore feed the plant avoiding the Llobregat river impact, especially for heavy rain period, and the harbour leaks. Sea water is pumped for more than three and a half km, crossing the river through an underground pipe. A very strong pre-treatment protect reverse osmosis (RO) membranes: a set of 10 SeaDAF®, high speed floatators, is the first step followed by 20 Mediazur® gravity filters and 20 SeaClean® pressurized dual media filters. The polishing is guaranteed by 18 cartridge filters of 5 microns. The silt density index15 of pretreated seawater is always below 3.0%/min, with an average of less than 2.5. Ten RO trains with a unitary production over 20,000 m3/day are fed by individual HP pumps and the energy recovery is assured by a set of 23 PX220 per train. A partial second pass guarantees a boron concentration in treated water below 1.0 mg/l (two trains of 16,500 m3/day). Remineralization is made with CO2 and upflow limestone filters with an innovative design. Potable water is pumped over 12 km to Fontsanta reservoirs to be blended with waters coming from two potable water plants, one with electrodialysis reversal treatment. Brine have an innovative treatment: it is blended with treated water from DepurBaix waste water treatment plant in a ratio lower than 1:1 and discharged through diffusers at 50 m depth to more than 3 km from intake. All effluents are treated before discharge and the plant has sludge treatment. The plant has increased the “green label” adding a wind generator and photovoltaic panels in the building roofs to minimize the electric internal consumption. The operational criteria and managing water production is another important chapter, because it takes into account all available resources. The paper will describe:

several innovative details of the plant and the construction;

the construction and operation feedback;

the criteria to decide the production of the plant;

the follow-up of main parameters of seawater and plant;

the real energy consumption in the different stages;

results of pre-treatment, RO trains and post-treatment from the first two years of operation;

and the integration of the plant in the regional water supply system, considering the principal factors:

Volume storage in the dams.

The operation of the drinking water plants.

The pluviometry and the climate predictions.

The regional water supply planning.

The rest of the available resources (ground water, etc.).

Notes

Presented at the International Conference on Desalination for the Environment, Clean Water and Energy, European Desalination Society, 23–26 April 2012, Barcelona, Spain

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.