53
Views
15
CrossRef citations to date
0
Altmetric
Articles

A single machine EPQ inventory model for a multi-product imperfect production system with rework process and auction

&
 

Abstract

In this paper, a multi-product Economic Production Quantity (EPQ) inventory model for a defective production system by a single machine is considered. The faulty produced products are reworked or are put on auction as they are. The aim of this research is to determine the optimal cycle length and the percentage of reworking every fault product such that the total inventory cost, including setup, production, holding, reworking, and lost profit, is minimized. We have proved that this problem is a convex non-linear programming method. Therefore, we came up with the exact algorithm based on differentiation to solve it. Finally, a sensitivity analysis is performed to evaluate the effect of changes in different parameters of the problem.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.