Abstract
The EPR (European Pressurised Water Reactor) developed by AREVA is a new nuclear reactor designed to achieve greater output (1600 MW) and longer plant life (60 years) than conventional nuclear reactors. The first one is currently under construction in Finland at Olkiluoto. For this new design, an integrated forging was applied for the nozzle shell, including an integral flange (Fig. 1). A 500 t ingot is necessary to manufacture this part, which was the first large part manufactured on a new 14 kt press installed at JSW in 2003. The part was completed 11 months after pouring. The technologies of each manufacturing step and the properties of the part are described.