10
Views
0
CrossRef citations to date
0
Altmetric
Articles

Spent fuel transport using cask loaded outside pool

Pages 135-141 | Published online: 19 Jul 2013
 

Abstract

During the last year, Sogin (the Italian company in charge for decommissioning of Italian nuclear power plants) had to implement an accelerated decommissioning plan of a EUREX spent fuel pool due to finding a water leakage into the environment from the pool. EUREX is no longer operating a pilot reprocessing plant, which some years ago became the responsibility of Sogin. There were 52 spent fuel assemblies from the Trino Vercellese PWR nuclear power plant, 48 irradiated pins from a Garigliano BWR fuel assembly, and 10 plates from an irradiated MTR fuel assembly stored in the EUREX pool, so the first step of the accelerated decommissioning plan consisted in the evacuation of this spent fuel. Considering the necessity to start the evacuation as soon as possible, Sogin decided to use an already existing cask (AGN-1) used in the past for the transport of Trino and Garigliano fuel assemblies. This cask was requalified in order to obtain a transport licence for the fuel assemblies stored in the EUREX pool according to ADR 2005 regulation. The transport license for the AGN-1 cask loaded with EUREX fuel assemblies was released by APAT (the Italian Safety Authority) in the spring of 2007. Owing to the limited capacity of the EUREX pool crane (27 t for nuclear loads) and limited dimensions of pool operational area, it was not possible to transfer the AGN-1 cask (50 t) into the pool for fuel assemblies charging. The solution implemented to overcome this problem was the loading of the cask outside the pool. A special shielding shuttle was developed and used to allow safe spent fuel transfer between the pool and the cask. This procedure avoided also the problem of excessive contamination of cask surfaces that could have occurred due to very high level of contamination of EUREX pool water if the cask had been immersed in the pool. Additional shielding devices were developed and used to reduce dose rate during cask loading operations. Although the evacuation of spent fuel assemblies from the EUREX pool was a very challenging activity due to the short time available, unfavourable space conditions inside the pool building and handling tool limitations; all loading and transport operations were performed successfully and without particular problems. Ten transports were carried out to evacuate all of the spent fuel stored in the EUREX pool. Spent fuel was transferred to the Avogadro Deposit pool. The first loading sequence started on 2 May 2007 and the first transport was performed on 6 May 2007. The tenth and last transport was performed on 21 July 2007. A dose less than 50 μSv (neutron + gamma) was measured for the most exposed operator during a complete cask loading sequence.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.