6
Views
1
CrossRef citations to date
0
Altmetric
Technical Paper

Refurbishment of the Tritium Laboratories at SCK•CEN

, &
Pages 153-156 | Published online: 07 Apr 2017
 

Abstract

The SCK•CEN tritium laboratories were commissioned in 1975 for a maximum tritium inventory of 37 TBq. With an aim to improve the infrastructure, the capabilities and safety, SCK•CEN’s general management decided to refurbish the laboratories. A new ventilation system, including a stack and gloveboxes equipped with a detritiation installation, will allow a higher tritium inventory limit of 0.37 PBq. This paper discusses the ongoing refurbishment of the two neighboring tritium laboratories. Currently one laboratory has been denuclearized whilst the other is still in operation. Nevertheless a number of conclusions can already be drawn. We succeeded in denuclearizing most of the equipment and infrastructure without personnel receiving measurable tritium doses. If the free released metals had been disposed off at a nuclear melting facility, 22% of the costs could have been saved, however free release is more socially acceptable.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.