Decommissioning of Large Nuclear Power Plants with LWRs in the Federal Republic of Germany

&
Pages 90-101 | Published online: 12 May 2017
 

Abstract

A short review of the essential results of a German decommissioning study is given, which treats the total dismantling of the reference plants Biblis A, a 1204-MW pressurized water reactor, and Brunsbüttel, an 805-MW boiling water reactor. The necessary decommissioning techniques are available today and the resulting costs and structures can be determined. A detailed evaluation of the working procedures and sequences is carried out and the given boundary conditions and assumptions (licensing requirements, activity release criteria, repository concepts, etc.) are explained. Data on activity inventory, masses, and wastes are given.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.