Case Study of Twin Cable-Stayed Bridges for High-Speed Railway in China: Design, Analysis and Construction

(Prof., Dr, Civil Eng.) , (Graduate Student) & (Dr)
 

Abstract

The construction of twin cable-stayed railway bridges was undertaken near Changsha station of the Shanghai–Kunming high-speed railway (HSR) in China. Because of the inevitability of crossing the existing Wuhan–Guangzhou HSR line, the swing method was chosen so that the construction process does not interrupt the operation of the existing line. The objective of this study is to highlight the features of two cable-stayed bridges. Key structural components along with structural dimensions are discussed. Key issues associated with the structural design are analyzed, including the pylon–girder joint behavior, solar radiation temperature mode of through girder, track–bridge behavior, and the aerodynamic effects induced by high-speed trains. Finally, a brief account of the construction is given. The use of the swing method proved to be an effective solution to span existing HSR lines.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.