5
Views
1
CrossRef citations to date
0
Altmetric
Original Article

Work Under Compression and in Noisy Environments:An oto-rhino-laryngologic investigation of construction workers building the Stockholm underground railway from 1953 to 1957

Pages 165-174 | Received 09 Jun 1959, Published online: 08 Jul 2009
 

Abstract

During the period from 1953 to 1957 the section connecting the western and southern underground railway systems of the City of Stockholm was completed. Ground conditions at the Central Railway Station, in the immediate vicinity of Stockholm's Ström (the body of water connecting Lake Malar and the Baltic), were such that it was elected to cast sections of the tube above ground in the form of caissons, which were subsequently sunk by means of special excavating devices to the desired depth. Three caissons were constructed, each about 35 metres in length and 19.5 metres in width. These were subsequently sunk to bed rock, about 14 metres below the surface of the ground. To prevent the entrance of sub-soil water, the work was carried out under excess pressure at a maximum of 1.3 to 1.4 atmospheres (atmos).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.