Abstract
The issues of environmental impact on building processes constitute a permanent aspect of the building industry, irrespective of various preventive actions (prefabrication, robotics etc.). The proposed method was developed in the course of tracking problems that arise during performance of building processes exposed to weather impact (as an example of interruptions) on construction sites of airports, highways, logistic centres, or installation of tall building facades. The proposed approach is based on creating multiple variants for process realization options, thus enabling adaptation to current realization conditions at particular stages. The studies that have been carried out confirm the advantage of this method over the traditional planning based on a single realization variant.
Santrauka
Aplinkos poveikis statybos procesui yra būdingas statybos pramonei nepaisant prevenciniu veiksmu (surenkamuju elementu gamyba, robotizacija). Pasiūlytas metodas buvo sukurtas stebint problemas, atsirandančias vykdant oro salygu veikiamus statybos procesus (pavyzdžiui, trikdžius) oro uostu, magistraliniu keliu, logistikos centru, aukštu pastatu fasado irengimo darbu, statybos aikštelese. Sukurtojo metodo esme ‐ pasiūlyti daug variantu konkrečiam procesui ivykdyti. Tai leidžia parinkti tam tikras konkrečiu darbu etapu ivykdymo salygas. Tyrimas patvirtino, kad šis metodas pranašesnis už tradicini planavima, teturinti vieninteli darbu ivykdymo varianta.
Reikšminiai žodžiai: