39
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

Total annual profits estimation for new construction of an SWRO desalination plant in Korea

, , &
Pages 108-113 | Received 12 Nov 2009, Accepted 24 Dec 2009, Published online: 03 Aug 2012
 

Abstract

A seawater reverse osmosis (SWRO) desalination process has become an alternative technology to solve water shortage problem in the world. Although SWRO is an advanced and useful technology for humanity, there is still unsettled cost effective issue. Therefore, the estimation of operation and maintenance (O&M) costs should be significantly considered before a new construction of SWRO desalination plant. The objective of this feasibility study is to estimate total annual profits (TAP) according to O&M for a new construction of SWRO desalination plant at 9 candidate sites along the shoreline in Korea. The cost estimation model was developed and validated with Fujairah SWRO plant operation data in 2005. As a result, TAPs for the 9 candidate sites were estimated and compared with that of Fujairah SWRO plant. The result reflects that the cost estimation model in this study is able to propose a reasonable range of TAP for a new construction project of SWRO desalination plant in Korea.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.