5
Views
25
CrossRef citations to date
0
Altmetric
Theoretical Paper

An Integrated Model for Master Scheduling, Lot Sizing and Capacity Requirements Planning

&
Pages 389-399 | Published online: 20 Dec 2017

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Hakan F. Karagul, Donald P. Warsing$suffix/text()$suffix/text(), Thom J. Hodgson, Maaz S. Kapadia & Reha Uzsoy. (2018) A comparison of mixed integer programming formulations of the capacitated lot-sizing problem. International Journal of Production Research 56:23, pages 7064-7084.
Read now
Shuang Chen, Joseph Geunes & Ajay Mishra. (2012) Algorithms for multi-item procurement planning with case packs. IIE Transactions 44:3, pages 181-198.
Read now
H. S. LEWIS, J. R. SWEIGART & R. E. MARKLAND. (1996) An interactive decision framework for multiple objective production planning. International Journal of Production Research 34:11, pages 3145-3164.
Read now
B. ADENSO-DÍAZ & M. LAGUNA. (1996) Modelling the load levelling problem in master production scheduling for MRP systems. International Journal of Production Research 34:2, pages 483-493.
Read now
HARISHC. BAHL, SHARAM TAJ & WAYNE CORCORAN. (1991) A linear-programming model formulation for optimal product-mix decisions in material-requirements-planning environments. International Journal of Production Research 29:5, pages 1025-1034.
Read now

Articles from other publishers (20)

Shokraneh K. Moghaddam & Kazuhiro Saitou. (2022) A novel predictive-reactive rescheduling method for products assembly lines with optimal dynamic pegging. Computers & Industrial Engineering 171, pages 108496.
Crossref
Hendro Wicaksono & Tianran Ni. (2020) An Automated Information System for Medium to Short-Term Manpower Capacity Planning in Make-To-Order Manufacturing. Procedia Manufacturing 52, pages 319-324.
Crossref
Hubert Missbauer. (2020) Order release planning by iterative simulation and linear programming: Theoretical foundation and analysis of its shortcomings. European Journal of Operational Research 280:2, pages 495-507.
Crossref
Shokraneh K. Moghaddam & Kazuhiro Saitou. (2019) On optimal dynamic pegging in rescheduling for new order arrival. Computers & Industrial Engineering 136, pages 46-56.
Crossref
Carlos Alberto Rojas Trejos, Luis Felipe Saavedra Arango & Juan Pablo Orejuela Cabrera. (2017) Scheduling of internal materials supply operations in a pre-milling type concentrate food plant. Producción + Limpia 12:2, pages 147-158.
Crossref
Edwards A. Silver, David F. Pyke & Douglas J. Thomas. 2016. Inventory and Production Management in Supply Chains. Inventory and Production Management in Supply Chains 435 486 .
Jonathan J. Lowe & Scott J. Mason. (2016) Integrated Semiconductor Supply Chain Production Planning. IEEE Transactions on Semiconductor Manufacturing 29:2, pages 116-126.
Crossref
Uche Okongwu, Matthieu Lauras, Julien François & Jean-Christophe Deschamps. (2016) Impact of the integration of tactical supply chain planning determinants on performance. Journal of Manufacturing Systems 38, pages 181-194.
Crossref
Ruedee Masuchun, Wiboon Masuchun & Teerawat Thepmanee. (2009) Integrating m-Machine Scheduling into MRP. Integrating m-Machine Scheduling into MRP.
H. J. Shin. (2007) A Hybrid Search Heuristic for Supply Chain Planning with a Multi-Level Multi Item Capacitated Lot Sizing Model. A Hybrid Search Heuristic for Supply Chain Planning with a Multi-Level Multi Item Capacitated Lot Sizing Model.
Kejia Chen & Ping Ji. (2007) A mixed integer programming model for advanced planning and scheduling (APS). European Journal of Operational Research 181:1, pages 515-522.
Crossref
E. Kozan & P. Preston. 2002. Operations Research/Management Science at Work. Operations Research/Management Science at Work 243 259 .
Alf Kimms & Andreas Drexl. 1998. Beyond Manufacturing Resource Planning (MRP II). Beyond Manufacturing Resource Planning (MRP II) 184 216 .
Holly S. Lewis, James R. Sweigart & Robert E. Markland. (2007) Master Scheduling in Assemble‐To‐Order Environments: A Capacitated Multiobjective Lot‐Sizing Model. Decision Sciences 23:1, pages 21-43.
Crossref
Horst TempelmeierHorst Tempelmeier. 1992. Material-Logistik. Material-Logistik 107 331 .
John S. Oakland, Amrik S. Sohal & Andrew Wirth. (1991) A decision network application to batch size determination for single-stage systems. Engineering Costs and Production Economics 21:2, pages 143-153.
Crossref
Yaakov Roll & Reuven Karni. (1991) Multi-item, multi-level lot sizing with an aggregate capacity constraint. European Journal of Operational Research 51:1, pages 73-87.
Crossref
S. Selcuk Erenguc & H. Murat Mercan. (1990) A multifamily dynamic lot-sizing model with coordinated replenishments. Naval Research Logistics 37:4, pages 539-558.
Crossref
Linda G. Sprague, Larry P. Ritzman & Lee Krajewski. (2006) Production planning, inventory management and scheduling: Spanning the boundaries. Managerial and Decision Economics 11:5, pages 297-315.
Crossref
Bernhard Fleischmann. 1987. DGOR. DGOR 278 285 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.