1
Views
15
CrossRef citations to date
0
Altmetric
Technical Note

A New Approach to the Activity-time Distribution in PERT

Pages 389-393 | Published online: 20 Dec 2017

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

H. M. Barakat, Y. H. Abdelkader & T. S. Taher. (2021) Evaluating the Project Completion Time When Non-Identical Beta Distributions Govern the Activity Networks. American Journal of Mathematical and Management Sciences 40:1, pages 32-43.
Read now

Articles from other publishers (14)

Saurabh Gupta, Riya Catherine George, Deepu Philip & Syam Nair. 2023. Proceedings of the 2nd International Civil Engineering and Architecture Conference. Proceedings of the 2nd International Civil Engineering and Architecture Conference 674 680 .
Y. H. Abdelkader, H. M. Barakat & T. S. Taher. (2020) Evaluating the project completion time when activity networks follow beta distribution. Asian-European Journal of Mathematics 14:07, pages 2150110.
Crossref
Barbara Gładysz. (2016) Fuzzy-probabilistic PERT. Annals of Operations Research 258:2, pages 437-452.
Crossref
Il Kyu Kim, Woo-Joo Lee, Jin Hee Yoon & Seung Hoe Choi. (2016) Fuzzy Regression Model Using Trapezoidal Fuzzy Numbers for Re-auction Data. The International Journal of Fuzzy Logic and Intelligent Systems 16:1, pages 72-80.
Crossref
Barbara Gładysz, Dariusz Skorupka, Dorota Kuchta & Artur Duchaczek. (2015) Project Risk time Management – A Proposed Model and a Case Study in the Construction Industry. Procedia Computer Science 64, pages 24-31.
Crossref
Dong-Eun Lee, David Arditi & Chang-Baek Son. (2013) The probability distribution of project completion times in simulation-based scheduling. KSCE Journal of Civil Engineering 17:4, pages 638-645.
Crossref
Yousry H. Abdelkader. 2013. Production and Manufacturing System Management. Production and Manufacturing System Management 231 241 .
Yousry H. Abdelkader. (2010) Adjustment of the moments of the project completion times when activity times are exponentially distributed. Annals of Operations Research 181:1, pages 503-514.
Crossref
Meysam Rahimi & Abbas Seifi. (2009) An embedded simulation approach for optimal activity crashing in stochastic networks. An embedded simulation approach for optimal activity crashing in stochastic networks.
Wolfram Pohlers. (2014) 2004 Summer Meeting of the Association for Symbolic Logic. Bulletin of Symbolic Logic 11:2, pages 249-312.
Crossref
Yousry H. Abdelkader. (2004) Evaluating project completion times when activity times are Weibull distributed. European Journal of Operational Research 157:3, pages 704-715.
Crossref
Kishan Mehrotra, John Chai & Sharma Pillutla. (1999) A study of approximating the moments of the job completion time in PERT networks. Journal of Operations Management 14:3, pages 277-289.
Crossref
Terry Williams. (1995) A classified bibliography of recent research relating to project risk management. European Journal of Operational Research 85:1, pages 18-38.
Crossref
T.G. Pham & N. Turkkan. (1994) Reliability of a standby system with beta-distributed component lives. IEEE Transactions on Reliability 43:1, pages 71-75.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.