A review of methods and algorithms for optimizing construction scheduling

, , , &
Pages 1091-1105 | Received 01 Mar 2012, Accepted 01 Nov 2012, Published online: 21 Dec 2017

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (6)

Aaditya Pratap Sanyal & Shankha Pratim Bhattacharya. (2024) A comparative analysis between CBR based prediction models and MRA models for high-rise construction delay prediction. International Journal of Construction Management 24:2, pages 124-136.
Read now
Shen Zhang & Xuechun Li. (2023) A comparative study of machine learning regression models for predicting construction duration. Journal of Asian Architecture and Building Engineering 0:0, pages 1-17.
Read now
Kamal Sharma & Manoj Kumar Trivedi. (2022) Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects. International Journal of Construction Management 22:16, pages 3158-3168.
Read now
Robert Pellerin & Nathalie Perrier. (2019) A review of methods, techniques and tools for project planning and control. International Journal of Production Research 57:7, pages 2160-2178.
Read now
Weiwei Chen, Lei Lei, Zhengwei Wang, Mingfei Teng & Junming Liu. (2018) Coordinating supplier selection and project scheduling in resource-constrained construction supply chains. International Journal of Production Research 56:19, pages 6512-6526.
Read now
Qais Amarkhil & Emad Elwakil. Enhanced planning and scheduling in building construction projects: an innovative approach to overcome scheduling challenges. International Journal of Construction Management 0:0, pages 1-11.
Read now

Articles from other publishers (82)

Ali Shehadeh, Odey Alshboul, Khaled F. Al-Shboul & Omer Tatari. (2024) An expert system for highway construction: Multi-objective optimization using enhanced particle swarm for optimal equipment management. Expert Systems with Applications 249, pages 123621.
Crossref
Anna Burduk, Grzegorz Bocewicz, Łukasz Łampika, Dagmara Łapczyńska & Kamil Musiał. (2024) Tabu search and genetic algorithm in rims production process assignment. Logic Journal of the IGPL.
Crossref
Theogan Logan Pillay & Akshay Kumar Saha. (2024) A Review of Metaheuristic Optimization Techniques for Effective Energy Conservation in Buildings. Energies 17:7, pages 1547.
Crossref
Bei Tian, Gang Xiao & Yu Shen. (2024) A predictive-reactive strategy for flight test task scheduling with aircraft grounding. Complex & Intelligent Systems.
Crossref
Subin Bae, Heesung Cha & Shaohua Jiang. (2024) Building an Information Modeling-Based System for Automatically Generating the Assembly Sequence of Precast Concrete Components Using a Genetic Algorithm. Applied Sciences 14:4, pages 1358.
Crossref
Zhaofang Mao, Yida Xu, Kan Fang, Chengbo Wang & Dian Huang. (2024) An adaptive large neighborhood search algorithm for parallel assembly lines scheduling problem with complex fixture constraints. Computers & Industrial Engineering 188, pages 109900.
Crossref
Shrutika Sharma, Vishal Gupta, Deepa Mudgal & Vishal Srivastava. (2023) Optimization of polydopamine coating process for poly lactic acid‐based 3D printed bone plates using machine learning approaches . Polymer Engineering & Science 64:1, pages 279-295.
Crossref
Ayesha SiddikaMing Lu. (2023) Project Schedule Acceleration Optimization Integrated with Energy Source–Based Assessment of Occupational Health and Safety Risks. Journal of Construction Engineering and Management 149:12.
Crossref
K. R. Srimathi, A. Padmarekha & K. S. Anandh. (2023) Automated construction schedule optimisation using genetic algorithm. Asian Journal of Civil Engineering 24:8, pages 3521-3528.
Crossref
Mayank Chauhan & Ranjan Kumar. (2023) Integrating the multi-objective particle swarm optimization-based time–cost trade-off model with earned value management. Asian Journal of Civil Engineering 24:8, pages 3293-3303.
Crossref
Kamal Sharma & Manoj Kumar Trivedi. (2023) Discrete OBNSGA III method-based robust multi-objective scheduling model for civil construction projects. Asian Journal of Civil Engineering 24:7, pages 2247-2264.
Crossref
Mohammad Azim Eirgash & Vedat Toğan. (2023) A novel oppositional teaching learning strategy based on the golden ratio to solve the Time-Cost-Environmental impact Trade-Off optimization problems. Expert Systems with Applications 224, pages 119995.
Crossref
Jantanee Dumrak & Seyed Ashkan Zarghami. (2023) The role of artificial intelligence in lean construction management. Engineering, Construction and Architectural Management.
Crossref
Mohammad Azim Eirgash, Vedat Toğan, Tayfun Dede & Hasan Basri Başağa. (2023) Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects. Structures 53, pages 806-821.
Crossref
Noha Essam, Laila Khodeir & Fatma Fathy. (2023) Approaches for BIM-based multi-objective optimization in construction scheduling. Ain Shams Engineering Journal 14:6, pages 102114.
Crossref
Rakesh Gupta & Manoj Kumar Trivedi. (2022) Integrating the multi-objective elephant herding optimization based time–cost trade-off model with earned value management. Asian Journal of Civil Engineering 24:4, pages 1027-1039.
Crossref
Sanghyeok Kang, Youngcheol Kang & Seok Kim. (2023) Long-term Trends in Construction Engineering and Management Research in Korea. KSCE Journal of Civil Engineering 27:5, pages 1883-1897.
Crossref
Qasim Zaheer, Mir Majaid Manzoor & Muhammad Jawad Ahamad. (2023) A review on developing optimization techniques in civil engineering. Engineering Computations 40:2, pages 348-377.
Crossref
Jeffery L. Ottesen & Giovanni Migliaccio. (2023) Use of Predictive Models for Labor-Productivity Loss in Settling Disputes. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 15:1.
Crossref
Michał Podolski, Jerzy Rosłon & Bartłomiej Sroka. (2022) The Impact of the Learning and Forgetting Effect on the Cost of a Multi-Unit Construction Project with the Use of the Simulated Annealing Algorithm. Applied Sciences 12:24, pages 12667.
Crossref
Theogan Logan Pillay & Akshay Kumar Saha. (2022) Passive, Low-Energy Design and Green Star Strategy for Green Star-Rated Buildings in South Africa. Energies 15:23, pages 9128.
Crossref
Tao Zhou, Qiang Long, Kris M.Y. Law & Changzhi Wu. (2022) Multi-objective stochastic project scheduling with alternative execution methods: An improved quantum-behaved particle swarm optimization approach. Expert Systems with Applications 203, pages 117029.
Crossref
Nebiyu Siraj Kedir, Sahand Somi, Aminah Robinson Fayek & Phuong H.D. Nguyen. (2022) Hybridization of reinforcement learning and agent-based modeling to optimize construction planning and scheduling. Automation in Construction 142, pages 104498.
Crossref
Justyna Borucka, Piotr Czyż, Giorgio Gasco, Weronika Mazurkiewicz, Dorota Nałęcz & Marcin Szczepański. (2022) Market Regeneration in Line with Sustainable Urban Development. Sustainability 14:18, pages 11690.
Crossref
Yishuo Jiang, Ming Li, Mingxing Li, Xinlai Liu, Ray Y. Zhong, Wei Pan & George Q. Huang. (2022) Digital twin-enabled real-time synchronization for planning, scheduling, and execution in precast on-site assembly. Automation in Construction 141, pages 104397.
Crossref
Ran RenJiansong Zhang. (2022) Construction Procedural Information Extraction from Textual Sources to Support Scheduling. Construction Procedural Information Extraction from Textual Sources to Support Scheduling.
Jerzy Rosłon. (2022) Materials and Technology Selection for Construction Projects Supported with the Use of Artificial Intelligence. Materials 15:4, pages 1282.
Crossref
Yannis Merlet, Simon Rouchier, Arnaud Jay, Nicolas Cellier & Monika Woloszyn. (2022) Integration of phasing on multi-objective optimization of building stock energy retrofit. Energy and Buildings 257, pages 111776.
Crossref
Amit Dhawan, Kamal Sharma & Manoj Kumar Trivedi. 2022. Artificial Intelligence and Sustainable Computing. Artificial Intelligence and Sustainable Computing 33 43 .
Önder Ökmen, Marian Bosch-Rekveldt & Hans Bakker. 2022. Research on Project, Programme and Portfolio Management. Research on Project, Programme and Portfolio Management 267 285 .
Pamela C. Nolz. (2020) Optimizing construction schedules and material deliveries in city logistics: a case study from the building industry. Flexible Services and Manufacturing Journal 33:3, pages 846-878.
Crossref
Han‐Seong Gwak & Dong‐Eun Lee. (2021) Stochastic resource leveling optimization method for trading off float consumption and project completion probability. Computer-Aided Civil and Infrastructure Engineering 36:8, pages 1013-1033.
Crossref
Fouad Amer, Hui Yi KohMani Golparvar-Fard. (2021) Automated Methods and Systems for Construction Planning and Scheduling: Critical Review of Three Decades of Research. Journal of Construction Engineering and Management 147:7.
Crossref
Chris Rausch, Benjamin Sanchez & Carl Haas. (2021) Topology Optimization of Architectural Panels to Minimize Waste during Fabrication: Algorithms for Panel Unfolding and Nesting . Journal of Construction Engineering and Management 147:7.
Crossref
Xavier Schelling, Jose Fernández, Patrick Ward, Javier Fernández & Sam Robertson. (2021) Decision Support System Applications for Scheduling in Professional Team Sport. The Team's Perspective. Frontiers in Sports and Active Living 3.
Crossref
Pornpote Nusen, Wanarut Boonyung, Sunita Nusen, Kriengsak Panuwatwanich, Paskorn Champrasert & Manop Kaewmoracharoen. (2021) Construction Planning and Scheduling of a Renovation Project Using BIM-Based Multi-Objective Genetic Algorithm. Applied Sciences 11:11, pages 4716.
Crossref
Bartłomiej Sroka, Jerzy Rosłon, Michał Podolski, Wojciech Bożejko, Anna Burduk & Mieczysław Wodecki. (2021) Profit optimization for multi-mode repetitive construction project with cash flows using metaheuristics. Archives of Civil and Mechanical Engineering 21:2.
Crossref
Rani Purbaningtyas. (2021) A Simulation Study of Duration-Budget Trade-Off in Home Renovation Project Management. Journal of Physics: Conference Series 1817:1, pages 012018.
Crossref
Roy Dong Wang, Tarek Zayed, Wei Pan, Saina Zheng & Salman Tariq. (2021) A system boundary-based critical review on crane selection in building construction. Automation in Construction 123, pages 103520.
Crossref
Tianqi Wang, Moatassem Abdallah, Caroline Clevenger & Shahryar Monghasemi. (2019) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management 28:1, pages 82-100.
Crossref
Abhilash Pandey, Praveen Kumar Chaudhary & Bibhuti Bhusan Das. 2021. Recent Trends in Civil Engineering. Recent Trends in Civil Engineering 461 471 .
Sameh Al‐Shihabi & Mohammad M. AlDurgam. (2020) The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights. International Transactions in Operational Research 27:6, pages 2841-2877.
Crossref
Jerzy Rosłon, Mariola Książek-Nowak & Paweł Nowak. (2020) Schedules Optimization with the Use of Value Engineering and NPV Maximization. Sustainability 12:18, pages 7454.
Crossref
Marcin Szczepański & Beata Grzyl. (2020) Technical and Economic Analysis of the Implementation of Selected Variants of Road Investment. Buildings 10:6, pages 97.
Crossref
Duc Hoc Tran. (2020) Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management 27:9, pages 2287-2313.
Crossref
Gebrehana Derbe, Yashuai Li, Di Wu & Qiuhong Zhao. (2020) SCIENTOMETRIC REVIEW OF CONSTRUCTION PROJECT SCHEDULE STUDIES: TRENDS, GAPS AND POTENTIAL RESEARCH AREAS. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 26:4, pages 343-363.
Crossref
Kareem ZahranA. Samer Ezeldin. (2020) Finance-based scheduling: optimization of results-based funded multiple projects. Canadian Journal of Civil Engineering 47:4, pages 428-437.
Crossref
Arie Taal, Junchao Wang, Cees de Laat & Zhiming Zhao. (2019) Profiling the scheduling decisions for handling critical paths in deadline-constrained cloud workflows. Future Generation Computer Systems 100, pages 237-249.
Crossref
Abhilasha Panwar, Kamalendra Kumar Tripathi & Kumar Neeraj Jha. (2019) A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects. Engineering, Construction and Architectural Management 26:9, pages 1924-1945.
Crossref
Humyun Fuad Rahman, Ripon K Chakrabortty & Michael J Ryan. (2019) An Optimised Supplier Selection Plan for Supply Chain Integrated Project Scheduling Problem. An Optimised Supplier Selection Plan for Supply Chain Integrated Project Scheduling Problem.
Xingyu Tao, Heng Li, Chao Mao, Chen Wang, Jeffrey Boon Hui Yap, Samad Sepasgozar, Sara Shirowzhan & Timothy Rose. (2019) Developing Shuffled Frog-Leaping Algorithm (SFLA) Method to Solve Power Load-Constrained TCRTO Problems in Civil Engineering. Advances in Civil Engineering 2019, pages 1-16.
Crossref
Dian Liu, Hong-wei Wang, Heng Li, Johnny Wang & Mohamed Khallaf. (2019) HIERARCHICAL TASK NETWORK APPROACH FOR TIME AND BUDGET CONSTRAINED CONSTRUCTION PROJECT PLANNING. Technological and Economic Development of Economy 25:3, pages 472-495.
Crossref
Mohamed Abdel-Basset, Asmaa Atef & Abdel-Nasser Hussein. (2018) Some appraisal criteria for multi-mode scheduling problem. Journal of Ambient Intelligence and Humanized Computing 10:4, pages 1641-1654.
Crossref
Jing LiuMing Lu. (2019) Robust Dual-Level Optimization Framework for Resource-Constrained Multiproject Scheduling for a Prefabrication Facility in Construction. Journal of Computing in Civil Engineering 33:2.
Crossref
Mohammad M. AlDurgam. (2019) Optimal Project Completion Time, a Multi-Objective Model and Monte Carlo Simulation-Optimization Solution. Optimal Project Completion Time, a Multi-Objective Model and Monte Carlo Simulation-Optimization Solution.
Pelin Akyil Kurt & Baris Kececi. 2019. Advances in Manufacturing, Production Management and Process Control. Advances in Manufacturing, Production Management and Process Control 549 557 .
Jung In Kim, Martin Fischer & Calvin Kam. (2018) Generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. Automation in Construction 96, pages 378-397.
Crossref
Jung In Kim, Martin Fischer & Min Jae Suh. (2018) Formal representation of cost and duration estimates for hard rock tunnel excavation. Automation in Construction 96, pages 337-349.
Crossref
Y. Cengiz Toklu. (2018) Application of Big Bang - Big Crunch Optimization to Resource Constrained Scheduling Problems. KSCE Journal of Civil Engineering 22:12, pages 4760-4770.
Crossref
F. Jordan Srour, Daoud KiomjianIssam M. Srour. (2018) Automating the Use of Learning Curve Models in Construction Task Duration Estimates. Journal of Construction Engineering and Management 144:7.
Crossref
Duc-Hoc Tran, Long Luong-Duc, Minh-Tin Duong, Trong-Nhan Le & Anh-Duc Pham. (2018) Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects. Journal of Computational Design and Engineering 5:2, pages 160-172.
Crossref
Dirk Briskorn & Michael Dienstknecht. (2018) Survey of quantitative methods in construction. Computers & Operations Research 92, pages 194-207.
Crossref
Fei HanSusan M. Bogus. (2018) Evaluating Construction Work Disruptions Using Resilient Short-Interval Scheduling: A Case Study. Evaluating Construction Work Disruptions Using Resilient Short-Interval Scheduling: A Case Study.
Amparo Soler-Dominguez, Angel A. Juan & Renatas Kizys. (2017) A Survey on Financial Applications of Metaheuristics. ACM Computing Surveys 50:1, pages 1-23.
Crossref
Laura Florez. (2017) Crew Allocation System for the Masonry Industry. Computer-Aided Civil and Infrastructure Engineering 32:10, pages 874-889.
Crossref
Ripon K. Chakrabortty, Ruhul A. Sarker & Daryl L. Essam. (2017) Resource constrained project scheduling with uncertain activity durations. Computers & Industrial Engineering 112, pages 537-550.
Crossref
David A. Wood. (2017) Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm. Journal of Natural Gas Science and Engineering 45, pages 143-164.
Crossref
Shabtai IsaacYi SuGunnar LuckoDavid Dagan. (2017) Work-Path Modeling and Spatial Scheduling with Singularity Functions. Journal of Computing in Civil Engineering 31:4.
Crossref
Mümine KAYA KELEŞ & Abdullah Emre KELEŞ. (2017) Veri Madenciliği Uygulamalarının ve Sezgisel Optimizasyon Algoritmalarının Yapım Yönetimindeki Yeri. Çukurova Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi 32:1, pages 235-242.
Crossref
Shahryar Monghasemi, Mohammad Reza Nikoo, Mohammad Ali Khaksar Fasaee & Jan Adamowski. (2017) A Hybrid of Genetic Algorithm and Evidential Reasoning for Optimal Design of Project Scheduling: A Systematic Negotiation Framework for Multiple Decision-Makers. International Journal of Information Technology & Decision Making 16:02, pages 389-420.
Crossref
Mehrdad Arashpour, Ron Wakefield, Babak Abbasi, E.W.M. Lee & James Minas. (2016) Off-site construction optimization: Sequencing multiple job classes with time constraints. Automation in Construction 71, pages 262-270.
Crossref
Hammad Abdullah Al Nasseri, Kristian Widen & Radhlinah Aulin. (2016) A taxonomy of planning and scheduling methods to support their more efficient use in construction project management. Journal of Engineering, Design and Technology 14:3, pages 580-601.
Crossref
Shang-Kuan Chen, Yen-Wu Ti & Kuo-Yu Tsai. (2016) Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach. Science and Technology of Nuclear Installations 2016, pages 1-9.
Crossref
Ilias Naskoudakis & Kleopatra Petroutsatou. (2016) A Thematic Review of Main Researches on Construction Equipment Over the Recent Years. Procedia Engineering 164, pages 206-213.
Crossref
Jerzy Rosłon & Jacek Zawistowski. (2016) Construction Projects’ Indicators Improvement Using Selected Metaheuristic Algorithms. Procedia Engineering 153, pages 595-598.
Crossref
David A. Winkler. (2015) Chemistry space–time. Perspectives in Science 6, pages 2-14.
Crossref
Reza Dehghan, Kamran Hazini & Janaka Ruwanpura. (2015) Optimization of overlapping activities in the design phase of construction projects. Automation in Construction 59, pages 81-95.
Crossref
Magdalena Hajdasz. (2015) Managing repetitive construction in a dynamically changing project environment: Conceptualizing the system–model–simulator nexus. Automation in Construction 57, pages 132-145.
Crossref
Peter E.D. Love, Jingyang Zhou, Jane Matthews, Chun-Pong Sing & Brad Carey. (2015) A systems information model for managing electrical, control, and instrumentation assets. Built Environment Project and Asset Management 5:3, pages 278-289.
Crossref
Shahryar Monghasemi, Mohammad Reza Nikoo, Mohammad Ali Khaksar Fasaee & Jan Adamowski. (2015) A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects. Expert Systems with Applications 42:6, pages 3089-3104.
Crossref
Michael A. Chilton. 2015. Modern Techniques for Successful IT Project Management. Modern Techniques for Successful IT Project Management 1 20 .
Aspridis Georgios, Kazantzi Vasiliki, Sdrolias Labros & Mplanas Nikolaos. (2014) Productivity Enhancement Options in the Years of the Economic Crisis. Procedia - Social and Behavioral Sciences 148, pages 516-523.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.