280
Views
42
CrossRef citations to date
0
Altmetric
General Paper

Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand

&
Pages 185-197 | Received 01 Aug 2010, Accepted 01 Feb 2012, Published online: 21 Dec 2017

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (11)

Snehamoy Chatterjee & Roussos Dimitrakopoulos. (2020) Production scheduling under uncertainty of an open-pit mine using Lagrangian relaxation and branch-and-cut algorithm. International Journal of Mining, Reclamation and Environment 34:5, pages 343-361.
Read now
João Marcelo Leal Gomes Leite, Edilson F. Arruda, Laura Bahiense & Lino G. Marujo. (2020) Modeling the integrated mine-to-client supply chain: a survey. International Journal of Mining, Reclamation and Environment 34:4, pages 247-293.
Read now
Ziad Saliba & Roussos Dimitrakopoulos. (2019) Simultaneous stochastic optimization of an open pit gold mining complex with supply and market uncertainty. Mining Technology 128:4, pages 216-229.
Read now
Iain Farmer & Roussos Dimitrakopoulos. (2018) Schedule-based pushback design within the stochastic optimisation framework. International Journal of Mining, Reclamation and Environment 32:5, pages 327-340.
Read now
Erhan Kozan & Shi Qiang Liu. (2017) An operational-level multi-stage mine production timetabling model for optimally synchronising drilling, blasting and excavating operations. International Journal of Mining, Reclamation and Environment 31:7, pages 457-474.
Read now
L. Montiel, R. Dimitrakopoulos & K. Kawahata. (2016) Globally optimising open-pit and underground mining operations under geological uncertainty. Mining Technology 125:1, pages 2-14.
Read now
Fernanda Del Castillo & Roussos Dimitrakopoulos. (2014) Joint effect of commodity price and geological uncertainty over the life of mine and ultimate pit limit. Mining Technology 123:4, pages 207-219.
Read now
Amina Lamghari, Roussos Dimitrakopoulos & Jacques A Ferland. (2014) A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty. Journal of the Operational Research Society 65:9, pages 1305-1314.
Read now
Mohammad Waqar Ali Asad, Roussos Dimitrakopoulos & Jeroen van Eldert. (2014) Stochastic production phase design for an open pit mining complex with multiple processing streams. Engineering Optimization 46:8, pages 1139-1152.
Read now

Articles from other publishers (31)

Saratha Sathasivam, Salaudeen Abdulwaheed Adebayo, Muraly Velavan, Noor Jannatul Alma Binti Zarul Fuad & Nurul Jannah Binti Ahmad Munawir. Developing optimization and prediction model for gold price forecasting in Malaysia. Developing optimization and prediction model for gold price forecasting in Malaysia.
Enrique Jelvez, Julian Ortiz, Nelson Morales Varela, Hooman Askari-Nasab & Gonzalo Nelis. (2023) A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty. Mathematics 11:18, pages 3907.
Crossref
Lawrence Madziwa, Mallikarjun Pillalamarry & Snehamoy Chatterjee. (2023) Integrating stochastic mine planning model with ARDL commodity price forecasting. Resources Policy 85, pages 104014.
Crossref
Lawrence Madziwa, Mallikarjun Pillalamarry & Snehamoy Chatterjee. (2023) Integrating flexibility in open pit mine planning to survive commodity price decline. Resources Policy 81, pages 103428.
Crossref
Elias Munapo, Trust Tawanda, Philimon Nyamugure & Santosh Kumar. 2023. Intelligent Computing & Optimization. Intelligent Computing & Optimization 926 935 .
Zhi-Ming Chen, Cheng-Hsiung Lee & Hung-Lin Lai. (2022) Speedup the optimization of maximal closure of a node-weighted directed acyclic graph. OPSEARCH 59:4, pages 1413-1437.
Crossref
Aparna Pramanik, Chiranjit Changdar, Abhinandan Khan, Snehamoy Chatterjee, Rajat Kumar Pal & Sudip Kumar Sahana. (2022) A 0–1 knapsack problem-based approach for solving open-pit mining problem with type-2 fuzzy parameters. Innovations in Systems and Software Engineering.
Crossref
Devendra Joshi, Premkumar Chithaluru, Aman Singh, Arvind Yadav, Dalia H. Elkamchouchi, Cristina Mazas Pérez-Oleaga & Divya Anand. (2022) A Novel Large-Scale Stochastic Pushback Design Merged with a Minimum Cut Algorithm for Open Pit Mine Production Scheduling. Systems 10:5, pages 159.
Crossref
Devendra Joshi, Hamed Gholami, Hitesh Mohapatra, Anis Ali, Dalia Streimikiene, Susanta Kumar Satpathy & Arvind Yadav. (2022) The Application of Stochastic Mine Production Scheduling in the Presence of Geological Uncertainty. Sustainability 14:16, pages 9819.
Crossref
César Flores-Fonseca, Rodrigo Linfati & John Willmer Escobar. (2021) Exact algorithms for production planning in mining considering the use of stockpiles and sequencing of power shovels in open-pit mines. Operational Research 22:3, pages 2529-2553.
Crossref
Lawrence Madziwa, Mallikarjun Pillalamarry & Snehamoy Chatterjee. (2022) Gold price forecasting using multivariate stochastic model. Resources Policy 76, pages 102544.
Crossref
Jorge Luiz Valença Mariz & Ali Soofastaei. 2022. Advanced Analytics in Mining Engineering. Advanced Analytics in Mining Engineering 205 306 .
Xiaowei Gu, Qing Wang, Xiaochuan Xu & Xiaoqian Ma. (2021) Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming. Mathematical Problems in Engineering 2021, pages 1-8.
Crossref
Hassan Qudrat-Ullah & Pramela Nair PanthallorHassan Qudrat-Ullah & Pramela Nair Panthallor. 2021. Operational Sustainability in the Mining Industry. Operational Sustainability in the Mining Industry 1 30 .
Amol Paithankar, Snehamoy Chatterjee, Ryan Goodfellow & Mohammad Waqar Ali Asad. (2020) Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation. Resources Policy 66, pages 101634.
Crossref
Adrien Rimélé, Roussos Dimitrakopoulos & Michel Gamache. (2020) A dynamic stochastic programming approach for open-pit mine planning with geological and commodity price uncertainty. Resources Policy 65, pages 101570.
Crossref
Amina Lamghari & Roussos Dimitrakopoulos. (2020) Hyper-heuristic approaches for strategic mine planning under uncertainty. Computers & Operations Research 115, pages 104590.
Crossref
Dejan StevanovićR.R., Mirjana BankovićV.V., Milica Pešić-GeorgiadisD.D. & Lazar StojanovićB.B.. (2020) Hybrid model for uncertainty assessment in open pit optimization. Tehnika 75:2, pages 161-171.
Crossref
Shuwei Huang, Guoqing Li, Eugene Ben-Awuah, Bright Oppong Afum & Nailian Hu. (2020) A Stochastic Mixed Integer Programming Framework for Underground Mining Production Scheduling Optimization Considering Grade Uncertainty. IEEE Access 8, pages 24495-24505.
Crossref
Amol Paithankar & Snehamoy Chatterjee. (2019) Open pit mine production schedule optimization using a hybrid of maximum-flow and genetic algorithms. Applied Soft Computing 81, pages 105507.
Crossref
Ming-fei Chen, Yan-qiu Liu, Yang Song, Qi Sun & Chuang-chuang Cong. (2019) Multimodal Transport Network Optimization Considering Safety Stock under Real-Time Information. Discrete Dynamics in Nature and Society 2019, pages 1-12.
Crossref
Amir Bijan Yasrebi, Ardeshir Hezarkhani & Peyman Afzal. (2017) Application of Present Value-Volume (PV-V) and NPV-Cumulative Total Ore (NPV-CTO) fractal modelling for mining strategy selection. Resources Policy 53, pages 384-393.
Crossref
Amina Lamghari. (2017) Mine Planning and Oil Field Development: A Survey and Research Potentials. Mathematical Geosciences 49:3, pages 395-437.
Crossref
Jyrki Savolainen. (2016) Real options in metal mining project valuation: Review of literature. Resources Policy 50, pages 49-65.
Crossref
Amina Lamghari & Roussos Dimitrakopoulos. (2016) Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty. European Journal of Operational Research 253:3, pages 843-855.
Crossref
Jieun Baek, Yosoon Choi & Han-su Park. (2016) Uncertainty Representation Method for Open Pit Optimization Results Due to Variation in Mineral Prices. Minerals 6:1, pages 17.
Crossref
Snehamoy Chatterjee, Manas Ranjan Sethi & Mohammad Waqar Ali Asad. (2016) Production phase and ultimate pit limit design under commodity price uncertainty. European Journal of Operational Research 248:2, pages 658-667.
Crossref
Amina Lamghari, Roussos Dimitrakopoulos & Jacques A. Ferland. (2014) A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines. Journal of Global Optimization 63:3, pages 555-582.
Crossref
Fenemedre Qaeze, Romain Guillaume & Caroline Thierry. 2015. Risks and Resilience of Collaborative Networks. Risks and Resilience of Collaborative Networks 557 565 .
Arman C. Kizilkale & Roussos Dimitrakopoulos. (2014) Optimizing mining rates under financial uncertainty in global mining complexes. International Journal of Production Economics 158, pages 359-365.
Crossref
Mohammad Waqar Ali Asad & Roussos Dimitrakopoulos. (2013) A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams. Resources Policy 38:4, pages 591-597.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.