390
Views
29
CrossRef citations to date
0
Altmetric
General Paper

An integrated approach to worker assignment, workforce flexibility acquisition, and task rotation

&
Pages 260-275 | Received 01 Sep 2010, Accepted 01 Jun 2011, Published online: 21 Dec 2017

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Pavinee Rerkjirattikal & Sun Olapiriyakul. (2021) Noise-safe job rotation in multi-workday scheduling considering skill and demand requirements. Journal of Industrial and Production Engineering 38:8, pages 618-627.
Read now
Cristina Sancha, Frank Wiengarten, Annachiara Longoni & Mark Pagell. (2020) The moderating role of temporary work on the performance of lean manufacturing systems. International Journal of Production Research 58:14, pages 4285-4305.
Read now

Articles from other publishers (27)

Maria A. Gartner, Wolfgang Grenzfurtner, Barbara Zauner & Manfred Gronalt. (2024) Job and product rotation for maximising the production output on multi mixed-model assembly lines for element prefabrication in industrialised housebuilding. Computers & Industrial Engineering 190, pages 110041.
Crossref
César Augusto Henao, Yessica Andrea Mercado, Virginia I. González & Armin Lüer-Villagra. (2023) Multiskilled personnel assignment with k-chaining considering the learning-forgetting phenomena. International Journal of Production Economics 265, pages 109018.
Crossref
Jonas Ast & Peter Nyhuis. (2023) A theoretical approach for considering practice effects when determining deployment schedules. Manufacturing Letters 36, pages 26-29.
Crossref
Rakan K. Albalawi, Paul M. Goodrum & Timothy R. B. Taylor. (2023) Applying the Tier II Construction Management Strategy to Measure the Competency Level among Single and Multiskilled Craft Professionals. Buildings 13:5, pages 1175.
Crossref
Carlos Miguel, Steven Hoedt, Pieter Leyman, El-Houssaine Aghezzaf & Johannes Cottyn. 2023. Production Processes and Product Evolution in the Age of Disruption. Production Processes and Product Evolution in the Age of Disruption 552 561 .
Min Wang, Guoshan Liu & Xinyu Lin. (2022) Dynamic Optimization of the Multi-Skilled Resource-Constrained Project Scheduling Problem with Uncertainty in Resource Availability. Mathematics 10:17, pages 3070.
Crossref
Marco Trost, Thorsten Claus & Frank Herrmann. (2022) Social Sustainability in Production Planning: A Systematic Literature Review. Sustainability 14:13, pages 8198.
Crossref
Araz NasirianBabak AbbasiT. C. E. Cheng & Mehrdad Arashpour. (2022) Multiskilled Workforce Planning: A Case from the Construction Industry. Journal of Construction Engineering and Management 148:5.
Crossref
Jonas Ast & Peter Nyhuis. (2022) Approach for determining functional flexibility of the workforce based on training losses and employee specific risks. Procedia CIRP 107, pages 839-844.
Crossref
Venkata Krishna Rao Pabolu, Divya Shrivastava & Makarand S. Kulkarni. (2022) A Dynamic System to Predict an Assembly Line Worker’s Comfortable Work-Duration Time by Using the Machine Learning Technique. Procedia CIRP 106, pages 270-275.
Crossref
Maria Luiza Caires Comper, Patrícia Rodrigues da Silva, Alexandher Weslley de Negreiros, Cristiana Caroline Villas Bôas & Rosimeire Simprini Padula. (2021) Influence of adherence to autonomous job rotation on musculoskeletal symptoms, occupational exposure, and work ability. International Journal of Industrial Ergonomics 84, pages 103165.
Crossref
Silvana Vergara, Jairo Del Villar, James Masson, Natalia Pérez, César Augusto Henao & Virginia I. González. 2021. Production Research. Production Research 223 237 .
Fabrizio Salvador, Frank T. Piller & Shivom Aggarwal. (2020) Surviving on the long tail: An empirical investigation of business model elements for mass customization. Long Range Planning 53:4, pages 101886.
Crossref
Omkar Salunkhe & Asa Fast-Berglund. (2020) Increasing operational flexibility using Industry 4.0 enabling technologies in final assembly. Increasing operational flexibility using Industry 4.0 enabling technologies in final assembly.
Araz NasirianMehrdad ArashpourBabak AbbasiAli Akbarnezhad. (2019) Optimal Work Assignment to Multiskilled Resources in Prefabricated Construction. Journal of Construction Engineering and Management 145:4.
Crossref
Rohana ABDULLAH, Md. Nizam ABDUL RAHMAN & Mohd. Rizal SALLEH. (2019) A systematic approach to model human system in cellular manufacturing. Journal of Advanced Mechanical Design, Systems, and Manufacturing 13:1, pages JAMDSM0001-JAMDSM0001.
Crossref
Mehrdad Arashpour, Vineet Kamat, Yu Bai, Ron Wakefield & Babak Abbasi. (2018) Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction. Automation in Construction 95, pages 1-9.
Crossref
Jie Lian, ChenGuang Liu, WenJuan Li & Yong Yin. (2018) A multi-skilled worker assignment problem in seru production systems considering the worker heterogeneity. Computers & Industrial Engineering 118, pages 366-382.
Crossref
Matjaz Roblek, Maja Zajec & Benjamin Urh. 2017. Knowledge Management Strategies and Applications. Knowledge Management Strategies and Applications.
Rosimeire Simprini Padula, Maria Luiza Caires Comper, Emily H. Sparer & Jack T. Dennerlein. (2017) Job rotation designed to prevent musculoskeletal disorders and control risk in manufacturing industries: A systematic review. Applied Ergonomics 58, pages 386-397.
Crossref
Mehrdad Arashpour, Ron Wakefield, Babak Abbasi, E.W.M. Lee & James Minas. (2016) Off-site construction optimization: Sequencing multiple job classes with time constraints. Automation in Construction 71, pages 262-270.
Crossref
Jordi Olivella & David Nembhard. (2016) Calibrating cross-training to meet demand mix variation and employee absence. European Journal of Operational Research 248:2, pages 462-472.
Crossref
Marta Pinzone, Paola Fantini, Maurizio Fiasché & Marco Taisch. 2016. Advances in Neural Networks. Advances in Neural Networks 517 526 .
Richard Conniss. (2015) A Survey on Constructing Rosters for Air Traffic Controllers. A Survey on Constructing Rosters for Air Traffic Controllers.
Z.S. Givi, M.Y. Jaber & W.P. Neumann. (2015) Production planning in DRC systems considering worker performance. Computers & Industrial Engineering 87, pages 317-327.
Crossref
Ruwen Qin, David A. Nembhard & Walter L. Barnes II. (2015) Workforce flexibility in operations management. Surveys in Operations Research and Management Science 20:1, pages 19-33.
Crossref
Chandra Sekhar, Manoj Patwardhan & Rohit Kr. Singh. (2013) A literature review on motivation. Global Business Perspectives 1:4, pages 471-487.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.