125
Views
19
CrossRef citations to date
0
Altmetric
General Paper

A hybrid genetic algorithm for an identical parallel-machine problem with maintenance activity

, &
Pages 1906-1918 | Received 16 Jun 2014, Accepted 06 Mar 2015, Published online: 21 Dec 2017

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Ya-Yong Chen, Pei-Yu Huang, Cheng-Jun Huang, Shen-Quan Huang & Fuh-Der Chou. (2021) Makespan minimization for scheduling on two identical parallel machiens with flexible maintenance and nonresumable jobs. Journal of Industrial and Production Engineering 38:4, pages 271-284.
Read now
Jen-Ya Wang. (2020) Minimizing the total weighted tardiness of overlapping jobs on parallel machines with a learning effect. Journal of the Operational Research Society 71:6, pages 910-927.
Read now
Feifeng Zheng, Ying Li, Feng Chu, Ming Liu & Yinfeng Xu. (2019) Integrated berth allocation and quay crane assignment with maintenance activities. International Journal of Production Research 57:11, pages 3478-3503.
Read now
Kangzhou Wang, Shulin Lan & Yingxue Zhao. (2017) A genetic-algorithm-based approach to the two-echelon capacitated vehicle routing problem with stochastic demands in logistics service. Journal of the Operational Research Society 68:11, pages 1409-1421.
Read now
Sandeep Kumar & Bhupesh Kumar Lad. (2017) Integrated production and maintenance planning for parallel machine system considering cost of rejection. Journal of the Operational Research Society 68:7, pages 834-846.
Read now

Articles from other publishers (14)

Meriem Touat & Belaid Benhamou. (2023) Bi-objective Resolution of the Single-machine Scheduling Problem with Availability and Human Operators. Bi-objective Resolution of the Single-machine Scheduling Problem with Availability and Human Operators.
Michael Geurtsen, Jelle Adan & Alp Akçay. (2023) Integrated maintenance and production scheduling for unrelated parallel machines with setup times. Flexible Services and Manufacturing Journal.
Crossref
Oğuzhan Ahmet Arık. (2022) Memetic algorithm for unrelated parallel machine scheduling problem with grey processing times. Journal of Modelling in Management 18:5, pages 1584-1602.
Crossref
M. Geurtsen, Jeroen B.H.C. Didden, J. Adan, Z. Atan & I. Adan. (2023) Production, maintenance and resource scheduling: A review. European Journal of Operational Research 305:2, pages 501-529.
Crossref
Chung-Ho Su & Jen-Ya Wang. (2022) A makespan minimization problem for versatile developers in the game industry. RAIRO - Operations Research 56:6, pages 3895-3913.
Crossref
Chung-Ho Su & Jen-Ya Wang. (2022) A Branch-and-Bound Algorithm for Minimizing the Total Tardiness of Multiple Developers. Mathematics 10:7, pages 1200.
Crossref
Huadong Mo, Giovanni Sansavini & Min Xie. 2021. Cyber‐Physical Distributed Systems. Cyber‐Physical Distributed Systems 177 201 .
Damla Rana DÜNDAR, İnci SARIÇİÇEK & Ahmet YAZİCİ. (2021) 737 BAKIM FAALİYETLERİNİ DİKKATE ALAN MAKİNE ÇİZELGELEME: LİTERATÜR ARAŞTIRMASI. Uludağ University Journal of The Faculty of Engineering, pages 737-756.
Crossref
Yang-Kuei Lin & Yin-Yi Chou. (2019) A hybrid genetic algorithm for operating room scheduling. Health Care Management Science 23:2, pages 249-263.
Crossref
Zahra Izadi, Homa Amirian & Rashed Sahraeian. (2019) Solving a Single-Server Parallel Machine Problem with Preventive Maintenances Using a Hyper-Heuristic Algorithm. Solving a Single-Server Parallel Machine Problem with Preventive Maintenances Using a Hyper-Heuristic Algorithm.
Jen-Ya Wang. (2019) A Branch-and-Bound Algorithm for Minimizing the Total Tardiness of a Three-Agent Scheduling Problem Considering the Overlap Effect and Environmental Protection. IEEE Access 7, pages 5106-5123.
Crossref
Almasarwah Najat, Chen Yuan, Suer Gursel & Yuan Tao. (2019) Minimizing the Number of Tardy Jobs on Identical Parallel Machines Subject to Periodic Maintenance. Procedia Manufacturing 38, pages 1409-1416.
Crossref
Huadong Mo, Giovanni Sansavini & Min Xie. (2018) Performance-based maintenance of gas turbines for reliable control of degraded power systems. Mechanical Systems and Signal Processing 103, pages 398-412.
Crossref
Wen-Chiung Lee & Jen-Ya Wang. (2017) A Three-Agent Flow Shop Problem for Minimizing the Total Completion Time. A Three-Agent Flow Shop Problem for Minimizing the Total Completion Time.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.