Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment

&
Pages 102-109 | Received 01 Sep 2003, Accepted 01 May 2004, Published online: 21 Dec 2017

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (6)

James C. Chen, Hung-Yu Lee, Wen-Haiung Hsieh & Tzu-Li Chen. (2022) Applying hybrid genetic algorithm to multi-mode resource constrained multi-project scheduling problems. Journal of the Chinese Institute of Engineers 45:1, pages 42-53.
Read now
Junguang Zhang, Ruixia Shi & Estrella Diaz. (2015) Dynamic monitoring and control of software project effort based on an effort buffer. Journal of the Operational Research Society 66:9, pages 1555-1565.
Read now
Hans Kjellberg. (2010) Struggling to perform a warehouse: buildings as symbols and tools. Construction Management and Economics 28:6, pages 675-694.
Read now
John H. Blackstone$suffix/text()$suffix/text(), James F. Cox$suffix/text()$suffix/text() & John G. Schleier$suffix/text()$suffix/text(). (2009) A tutorial on project management from a theory of constraints perspective. International Journal of Production Research 47:24, pages 7029-7046.
Read now
Liu Shu‐Shun & Kuo‐Chuan Shih. (2009) A framework of critical resource chain for project schedule analysis. Construction Management and Economics 27:9, pages 857-869.
Read now
Frank Schultmann & Nicole Sunke. (2007) Energy-oriented deconstruction and recovery planning. Building Research & Information 35:6, pages 602-615.
Read now

Articles from other publishers (25)

Hamed AlikhaniChau Le, H. David JeongIvan Damnjanovic. (2023) Sequential Machine Learning for Activity Sequence Prediction from Daily Work Report Data. Journal of Construction Engineering and Management 149:9.
Crossref
Alireza Etminaniesfahani, Hanyu Gu, Leila Moslemi Naeni & Amir Salehipour. (2022) A Forward–Backward Relax-and-Solve Algorithm for the Resource-Constrained Project Scheduling Problem. SN Computer Science 4:2.
Crossref
Hêriş Golpîra, Sina Safaeipour & Syed Abdul Rehman Khan. 2021. Application of Mathematics and Optimization in Construction Project Management. Application of Mathematics and Optimization in Construction Project Management 51 78 .
Shu-Shun Liu, Hsin-Yi Huang & Nevy Risna Dyah Kumala. (2020) Two-Stage Optimization Model for Life Cycle Maintenance Scheduling of Bridge Infrastructure. Applied Sciences 10:24, pages 8887.
Crossref
Jia LiuYisheng LiuYing ShiJian Li. (2020) Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm. Journal of Computing in Civil Engineering 34:2.
Crossref
Robert Eduardo Cooper Ordoñez, Mario Vanhoucke, José Coelho, Rosley Anholon & Olívio Novaski. (2019) A Study of the Critical Chain Project Management Method Applied to a Multiproject System. Project Management Journal 50:3, pages 322-334.
Crossref
Wan-An Cui. (2018) Critical Sequences and Resource Links Optimization in Resource-Constrained Project Scheduling. Asia-Pacific Journal of Operational Research 35:05, pages 1850032.
Crossref
Ran Etgar, Roy Gelbard & Yuval Cohen. (2018) Feature assignment in multi-release work plan: Accelerating optimization using gene clustering. Computers & Industrial Engineering 118, pages 123-137.
Crossref
Ran Etgar, Roy Gelbard & Yuval Cohen. (2017) Optimizing version release dates of research and development long-term processes. European Journal of Operational Research 259:2, pages 642-653.
Crossref
Rifat SonmezMahdi Abbasi IranaghFurkan Uysal. (2016) Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time–Cost Trade-Off Problem. Journal of Construction Engineering and Management 142:3.
Crossref
Vittal S. Anantatmula & James B. Webb. 2016. Project Management. Project Management 1005 1022 .
Mahdi Ghaffari & Margaret W. Emsley. (2015) Current status and future potential of the research on Critical Chain Project Management. Surveys in Operations Research and Management Science 20:2, pages 43-54.
Crossref
Önder Halis BettemirRifat Sonmez. (2015) Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling. Journal of Management in Engineering 31:5.
Crossref
Michael A. Chilton. 2015. Modern Techniques for Successful IT Project Management. Modern Techniques for Successful IT Project Management 1 20 .
Vittal S. Anantatmula & James B. Webb. (2014) Critical Chain Method in Traditional Project and Portfolio Management Situations. International Journal of Information Technology Project Management 5:3, pages 67-83.
Crossref
Rong Hwa Huang & Tung Han Yu. (2013) A Novel Tabu Search Algorithm for Solving Robust Multiple Resource-Constrained Project Scheduling Problem. International Journal of Computer and Communication Engineering, pages 213-215.
Crossref
������, Igor Demkin, ������ & Valeriy Lesnykh. (2012) Risk analysis of oil and gas projects: possible problems, approaches to solving. Russian Journal of Project Management 1:1, pages 0-0.
Crossref
Yuval Cohen, Arik Sadeh & Ofer Zwikael. (2012) Finding the Shortest Non-Delay Schedule for a Resource-Constrained Project. International Journal of Operations Research and Information Systems 3:4, pages 41-58.
Crossref
Arie Karniel & Yoram Reich. (2009) From DSM-Based Planning to Design Process Simulation: A Review of Process Scheme Logic Verification Issues. IEEE Transactions on Engineering Management 56:4, pages 636-649.
Crossref
A. Kastor & K. Sirakoulis. (2009) The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem. International Journal of Project Management 27:5, pages 493-500.
Crossref
Jin-Lee Kim. (2009) Improved genetic algorithm for resource-constrained scheduling of large projects. Canadian Journal of Civil Engineering 36:6, pages 1016-1027.
Crossref
Wanan Cui, Zhenqian Wang & Xiuning Cao. (2008) Links Optimization for Resource-Constrained Project Scheduling. Links Optimization for Resource-Constrained Project Scheduling.
Wanan Cui, ShengBao Yao & Xiuning Cao. (2008) Links Analysis in Resource Constrained Projects. Links Analysis in Resource Constrained Projects.
Wanan Cui, ShengBao Yao & Xiuning Cao. (2008) Critical Sequence Optimization under Adjustable Resource-Constrained Project Scheduling. Critical Sequence Optimization under Adjustable Resource-Constrained Project Scheduling.
Willy Herroelen. (2005) Project Scheduling—Theory and Practice. Production and Operations Management 14:4, pages 413-432.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.