107
Views
24
CrossRef citations to date
0
Altmetric
Original Articles

Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP)

Pages 3419-3457 | Published online: 14 Nov 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Guodong Zhao, Jiyin Liu & Yun Dong. (2020) Scheduling the operations of a double-load crane in slab yards. International Journal of Production Research 58:9, pages 2647-2657.
Read now
Ada Che, Zhen Zhou, Chengbin Chu & Haoxun Chen. (2011) Multi-degree cyclic hoist scheduling with time window constraints. International Journal of Production Research 49:19, pages 5679-5693.
Read now
Pengyu Yan, Chengbin Chu, Naiding Yang & Ada Che. (2010) A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows. International Journal of Production Research 48:21, pages 6461-6480.
Read now
H. Neil Geismar & Michael Pinedo. (2010) Robotic cells with stochastic processing times. IIE Transactions 42:12, pages 897-914.
Read now
Ada Che, Pengyu Yan, Naiding Yang & Chengbin Chu. (2010) Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times. International Journal of Production Research 48:5, pages 1225-1243.
Read now

Articles from other publishers (19)

Jianguang Feng, Ada Che, Chengbin Chu, Eugene Levner & Vladimir Kats. (2024) Scheduling robotic cells with fixed processing times or time windows: Classification, solution approaches, polynomial algorithms and complexity. European Journal of Operational Research.
Crossref
Reinaldo Padilha França, Ana Carolina Borges Monteiro, Vania V. Estrela & Navid Razmjooy. 2021. Metaheuristics and Optimization in Computer and Electrical Engineering. Metaheuristics and Optimization in Computer and Electrical Engineering 275 292 .
José Itzcoatl Gomar-Madriz, Salvador Hernandez-González & Jaime Navarrete-Damián. 2020. Handbook of Research on Industrial Applications for Improved Supply Chain Performance. Handbook of Research on Industrial Applications for Improved Supply Chain Performance 404 423 .
Mehdi Foumani, Kate Smith-Miles, Indra Gunawan & Asghar Moeini. (2017) A framework for stochastic scheduling of two-machine robotic rework cells with in-process inspection system. Computers & Industrial Engineering 112, pages 492-502.
Crossref
Ada Che, Vladimir Kats & Eugene Levner. (2017) An efficient bicriteria algorithm for stable robotic flow shop scheduling. European Journal of Operational Research 260:3, pages 964-971.
Crossref
Ahmed Nait-Sidi-Moh & Adnen El-Amraoui. (2016) Modeling and optimization of cyclic hoist schedules in an electroplating line. Journal of Systems Science and Systems Engineering 25:4, pages 469-490.
Crossref
Hyun-Jung Kim, Jun-Ho Lee & Tae-Eog Lee. (2016) Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation. IEEE Transactions on Automation Science and Engineering 13:3, pages 1409-1414.
Crossref
Adnen El Amraoui & Mohsen Elhafsi. (2016) An efficient new heuristic for the hoist scheduling problem. Computers & Operations Research 67, pages 184-192.
Crossref
Ada Che, Jianguang Feng, Haoxun Chen & Chengbin Chu. (2015) Robust optimization for the cyclic hoist scheduling problem. European Journal of Operational Research 240:3, pages 627-636.
Crossref
Adnen El Amraoui, Marie-Ange Manier, Abdellah El Moudni & Mohamed Benrejeb. (2013) A genetic algorithm approach for a single hoist scheduling problem with time windows constraints. Engineering Applications of Artificial Intelligence 26:7, pages 1761-1771.
Crossref
Adnen El Amraoui, Marie-Ange Manier, Abdellah El Moudni & Mohamed Benrejeb. (2013) A linear optimization approach to the heterogeneous r-cyclic hoist scheduling problem. Computers & Industrial Engineering 65:3, pages 360-369.
Crossref
Adnen El Amraoui & Ahmed Nait-Sidi-Moh. (2012) P-Temporal Petri Nets for Hoist Scheduling Problem. IFAC Proceedings Volumes 45:6, pages 297-302.
Crossref
A. El Amraoui, M.-A. Manier, A. El Moudni & M. Benrejeb. (2011) Hoist Scheduling for multi-part CHSP in complex lines' configuration. Hoist Scheduling for multi-part CHSP in complex lines' configuration.
A. El Amraoui, M.-A. Manier, A. El Moudni & M. Benrejeb. (2011) Heuristic for the Resolution of the Cyclic Hoist Scheduling Problem with Multi-Items. IFAC Proceedings Volumes 44:1, pages 8195-8200.
Crossref
James J. Cochran, Louis A. CoxJr.Jr., Pinar Keskinocak, Jeffrey P. Kharoufeh & J. Cole SmithLars Magnus Hvattum & Eystein Fredrik Esbensen. 2011. Wiley Encyclopedia of Operations Research and Management Science. Wiley Encyclopedia of Operations Research and Management Science.
Christelle Bloch, Marie‐Ange Manier, Pierre Baptiste & Christophe Varnier. 2008. Production Scheduling. Production Scheduling 193 231 .
Da-Yin Liao & Hsien-Sheng Fu. (2004) Speedy delivery. IEEE Robotics & Automation Magazine 11:3, pages 22-32.
Crossref
Da-Yin Liao. (2004) Vehicle chaining phenomenon in a unidirectional circular transport system. Vehicle chaining phenomenon in a unidirectional circular transport system.
Adnen El Amraoui & Mohsen Elhafsi. (2016) An Efficient New Heuristic for the Hoist Scheduling Problem. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.