Yuanxing Xu, Mengjian Zhang, Ming Yang & Deguang Wang. (2024) Hybrid quantum particle swarm optimization and variable neighborhood search for flexible job-shop scheduling problem. Journal of Manufacturing Systems 73, pages 334-348.
Crossref
Stéphane Dauzère-Pérès, Junwen Ding, Liji Shen & Karim Tamssaouet. (2024) The flexible job shop scheduling problem: A review. European Journal of Operational Research 314:2, pages 409-432.
Crossref
Shun Jia, Yang Yang, Shuyu Li, Shang Wang, Anbang Li, Wei Cai, Yang Liu, Jian Hao & Luoke Hu. (2024) The Green Flexible Job-Shop Scheduling Problem Considering Cost, Carbon Emissions, and Customer Satisfaction under Time-of-Use Electricity Pricing. Sustainability 16:6, pages 2443.
Crossref
Seifeddine Abdelhak, Issam Nouaouri, Saoussen Krichen & Gilles Goncalves. (2023) Minimization of Makespan and Total Completion Time for Hybrid Job Shop Scheduling Problem Using Genetic Approaches. International Journal on Artificial Intelligence Tools 32:08.
Crossref
Gabriel Mauricio Zambrano-Rey, Eliana María González-Neira, Gabriel Fernando Forero-Ortiz, María José Ocampo-Monsalve & Andrea Rivera-Torres. (2023) Minimizing the expected maximum lateness for a job shop subject to stochastic machine breakdowns. Annals of Operations Research.
Crossref
Maha Ben Hamida, Ameni Azzouz & Lamjed Ben Said. (2023) An Adaptive Variable Neighborhood Search Algorithm to Solve Green Flexible Job Shop Problem. An Adaptive Variable Neighborhood Search Algorithm to Solve Green Flexible Job Shop Problem.
Xixing Li, Xing Guo, Hongtao Tang, Rui Wu, Lei Wang, Shibao Pang, Zhengchao Liu, Wenxiang Xu & Xin Li. (2022) Survey of integrated flexible job shop scheduling problems. Computers & Industrial Engineering 174, pages 108786.
Crossref
Kun Lei, Peng Guo, Wenchao Zhao, Yi Wang, Linmao Qian, Xiangyin Meng & Liansheng Tang. (2022) A multi-action deep reinforcement learning framework for flexible Job-shop scheduling problem. Expert Systems with Applications 205, pages 117796.
Crossref
M. Thenarasu, K. Rameshkumar, Jacob Rousseau & S.P. Anbuudayasankar. (2022) Development and analysis of priority decision rules using MCDM approach for a flexible job shop scheduling: A simulation study. Simulation Modelling Practice and Theory 114, pages 102416.
Crossref
Adil Baykasoğlu & Fatma S. Madenoğlu. (2021) Greedy randomized adaptive search procedure for simultaneous scheduling of production and preventive maintenance activities in dynamic flexible job shops. Soft Computing 25:23, pages 14893-14932.
Crossref
Alper Türkyılmaz, Özlem Şenvar, İrem Ünal & Serol Bulkan. (2020) A research survey: heuristic approaches for solving multi objective flexible job shop problems. Journal of Intelligent Manufacturing 31:8, pages 1949-1983.
Crossref
Adil Baykasoğlu, Fatma S. Madenoğlu & Alper Hamzadayı. (2020) Greedy randomized adaptive search for dynamic flexible job-shop scheduling. Journal of Manufacturing Systems 56, pages 425-451.
Crossref
Parviz Fattahi, Naeeme Bagheri Rad, Fatemeh Daneshamooz & Samad Ahmadi. (2020) A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process. Assembly Automation 40:3, pages 419-432.
Crossref
Kaizhou Gao, Fajun Yang, Junqing Li, Hongyan Sang & Jianping Luo. (2020) Improved Jaya Algorithm for Flexible Job Shop Rescheduling Problem. IEEE Access 8, pages 86915-86922.
Crossref
K. R. Anil Kumar & Edwin Raja Das. 2020. Proceedings of ICDMC 2019. Proceedings of ICDMC 2019
421
432
.
Xinyu Li & Liang GaoXinyu Li & Liang Gao. 2020. Effective Methods for Integrated Process Planning and Scheduling. Effective Methods for Integrated Process Planning and Scheduling
17
45
.
K.Z. Gao, M.C. Zhou & Y.X. Pan. (2019) Jaya Algorithm for Rescheduling Flexible Job Shop Problem with Machine Recovery. Jaya Algorithm for Rescheduling Flexible Job Shop Problem with Machine Recovery.
Jin Xie, Liang Gao, Kunkun Peng, Xinyu Li & Haoran Li. (2019) Review on flexible job shop scheduling. IET Collaborative Intelligent Manufacturing 1:3, pages 67-77.
Crossref
Yong Zhou, Jian-Jun Yang & Lian-Yu Zheng. (2019) Multi-Agent Based Hyper-Heuristics for Multi-Objective Flexible Job Shop Scheduling: A Case Study in an Aero-Engine Blade Manufacturing Plant. IEEE Access 7, pages 21147-21176.
Crossref
Maroua Nouiri, Damien Trentesaux, Abdelghani Bekrar, Adriana Giret & Miguel A. Salido. 2019. Service Orientation in Holonic and Multi-Agent Manufacturing. Service Orientation in Holonic and Multi-Agent Manufacturing
197
210
.
Po-Hsiang Lu, Muh-Cherng Wu, Hao Tan, Yong-Han Peng & Chen-Fu Chen. (2015) A genetic algorithm embedded with a concise chromosome representation for distributed and flexible job-shop scheduling problems. Journal of Intelligent Manufacturing 29:1, pages 19-34.
Crossref
Deming Lei & Sanqiang Cao. (2017) A novel shuffled frog-leaping algorithm for flexible job shop scheduling with interval processing time. A novel shuffled frog-leaping algorithm for flexible job shop scheduling with interval processing time.
Imran Ali Chaudhry & Abid Ali Khan. (2015) A research survey: review of flexible job shop scheduling techniques. International Transactions in Operational Research 23:3, pages 551-591.
Crossref
Didem Cinar, José António Oliveira, Y. Ilker Topcu & Panos M. Pardalos. (2016) A priority-based genetic algorithm for a flexible job shop scheduling problem. Journal of Industrial and Management Optimization 12:4, pages 1391-1415.
Crossref
Hadi Mokhtari & Mehrdad Dadgar. (2015) Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate. Computers & Operations Research 61, pages 31-45.
Crossref
Jae-Min Yu, Hyoung-Ho Doh, Yong-Ju Kwon, Jeong-Hoon Shin, Hyung-Won Kim, Sung-Ho Nam & Dong-Ho Lee. (2015) Decision Tree based Scheduling for Static and Dynamic Flexible Job Shops with Multiple Process Plans. Journal of the Korean Society for Precision Engineering 32:1, pages 25-37.
Crossref
Wei Yue Xiao & Fei Yu. (2014) Decision Method of Processing Scheme for Part Surface with Constraint Condition Based on T_Invariant of Fuzzy Petri Nets. Advanced Materials Research 1056, pages 166-170.
Crossref
Adil Baykasoğlu, Alper Hamzadayi & Simge Yelkenci Köse. (2014) Testing the performance of teaching–learning based optimization (TLBO) algorithm on combinatorial problems: Flow shop and job shop scheduling cases. Information Sciences 276, pages 204-218.
Crossref
Faruk Geyik & Ayşe Tuğba Dosdoğru. (2012) Process plan and part routing optimization in a dynamic flexible job shop scheduling environment: an optimization via simulation approach. Neural Computing and Applications 23:6, pages 1631-1641.
Crossref
Jae-Min Yu, Hyoung-Ho Doh, Ji-Su Kim, Yong-Ju Kwon, Dong-Ho Lee & Sung-Ho Nam. (2013) Input sequencing and scheduling for a reconfigurable manufacturing system with a limited number of fixtures. The International Journal of Advanced Manufacturing Technology 67:1-4, pages 157-169.
Crossref
James C. Chen, Cheng-Chun Wu, Chia-Wen Chen & Kou-Huang Chen. (2012) Flexible job shop scheduling with parallel machines using Genetic Algorithm and Grouping Genetic Algorithm. Expert Systems with Applications 39:11, pages 10016-10021.
Crossref
Oskar Wigstrom & Bengt Lennartson. (2012) Scheduling model for systems with complex alternative behaviour. Scheduling model for systems with complex alternative behaviour.
You-lian Zheng, Yuan-xiang Li & De-ming Lei. (2011) Multi-objective swarm-based neighborhood search for fuzzy flexible job shop scheduling. The International Journal of Advanced Manufacturing Technology 60:9-12, pages 1063-1069.
Crossref
Ling Wang, Gang Zhou, Ye Xu, Shengyao Wang & Min Liu. (2011) An effective artificial bee colony algorithm for the flexible job-shop scheduling problem. The International Journal of Advanced Manufacturing Technology 60:1-4, pages 303-315.
Crossref
Cemal Özgüven, Yasemin Yavuz & Lale Özbakır. (2012) Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times. Applied Mathematical Modelling 36:2, pages 846-858.
Crossref
Ghasem Moslehi & Mehdi Mahnam. (2011) A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search. International Journal of Production Economics 129:1, pages 14-22.
Crossref
You-Lian Zheng, Yuan-Xiang Li, De-Ming Lei & Chuan-Xiang Ma. (2010) Scheduling Flexible Job Shop with Fuzzy Processing Time Using Co-evolutionary Genetic Algorithm. Scheduling Flexible Job Shop with Fuzzy Processing Time Using Co-evolutionary Genetic Algorithm.
Tadeusz Witkowski, Pawel Antczak & Arkadiusz Antczak. (2010) Solving the Flexible Open-Job Shop Scheduling Problem with GRASP and Simulated Annealing. Solving the Flexible Open-Job Shop Scheduling Problem with GRASP and Simulated Annealing.
Cemal Özgüven, Lale Özbakır & Yasemin Yavuz. (2010) Mathematical models for job-shop scheduling problems with routing and process plan flexibility. Applied Mathematical Modelling 34:6, pages 1539-1548.
Crossref
Adil Baykasoğlu & Lale Özbakır. (2010) Analyzing the effect of dispatching rules on the scheduling performance through grammar based flexible scheduling system. International Journal of Production Economics 124:2, pages 369-381.
Crossref
L. De Giovanni & F. Pezzella. (2010) An Improved Genetic Algorithm for the Distributed and Flexible Job-shop Scheduling problem. European Journal of Operational Research 200:2, pages 395-408.
Crossref
J. C. Chen, K. H. Chen, J. J. Wu & C. W. Chen. (2007) A study of the flexible job shop scheduling problem with parallel machines and reentrant process. The International Journal of Advanced Manufacturing Technology 39:3-4, pages 344-354.
Crossref
Huan-Min Xu & Dong-Bo Li. (2007) A meta-modeling paradigm of the manufacturing resources using mathematical logic for process planning. The International Journal of Advanced Manufacturing Technology 36:9-10, pages 1022-1031.
Crossref
Adil Baykasoğlu & Lale Özbakır. (2008) Analysing the effect of flexibility on manufacturing systems performance. Journal of Manufacturing Technology Management 19:2, pages 172-193.
Crossref
N. Imanipour. (2006) Modeling&Solving Flexible Job Shop Problem With Sequence Dependent Setup Times. Modeling&Solving Flexible Job Shop Problem With Sequence Dependent Setup Times.
Z. Wu & M.X. Weng. (2005) Multiagent Scheduling Method With Earliness and Tardiness Objectives in Flexible Job Shops. IEEE Transactions on Systems, Man and Cybernetics, Part B (Cybernetics) 35:2, pages 293-301.
Crossref