256
Views
26
CrossRef citations to date
0
Altmetric
Original Articles

Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs

&
Pages 4453-4486 | Published online: 08 Jun 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Fei Shi, Shikui Zhao & Yue Meng. (2020) Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem. International Journal of Production Research 58:9, pages 2604-2625.
Read now
Mário T. Pereira & Miguel C. Santoro. (2011) An integrative heuristic method for detailed operations scheduling in assembly job shop systems. International Journal of Production Research 49:20, pages 6089-6105.
Read now
Z C Zhu, K M Ng & H L Ong. (2010) A modified tabu search algorithm for cost-based job shop problem. Journal of the Operational Research Society 61:4, pages 611-619.
Read now
G. I. Zobolas, C. D. Tarantilis & G. Ioannou. (2008) Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling. International Journal of Production Research 46:12, pages 3359-3386.
Read now
B.K. Choi & N.K. You. (2006) Dispatching rules for dynamic scheduling of one-of-a-kind production. International Journal of Computer Integrated Manufacturing 19:4, pages 383-392.
Read now

Articles from other publishers (21)

Hong-Sen Yan & Xiao-Qin Wan. (2022) Self-reconfiguration and rescheduling of aero-engine assembly shop with rework disruption in knowledgeable manufacturing environment. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 237:8, pages 1230-1240.
Crossref
Paolo Renna, Daniela Carlucci & Sergio Materi. 2021. Multiple Criteria Decision Making for Sustainable Development. Multiple Criteria Decision Making for Sustainable Development 193 211 .
Sicheng Zhang, Xiang Li, Bowen Zhang & Shouyang Wang. (2020) Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system. European Journal of Operational Research 283:2, pages 441-460.
Crossref
Hongyang Zhong, Jianjun Liu, Qingxin Chen, Ning Mao & Xiaojia Yang. (2020) Performance Assessment of Dynamic Flexible Assembly Job Shop Control Methods. IEEE Access 8, pages 226042-226058.
Crossref
Pan Zou, Manik Rajora & Steven Y. Liang. (2018) A new algorithm based on evolutionary computation for hierarchically coupled constraint optimization: methodology and application to assembly job-shop scheduling. Journal of Scheduling 21:5, pages 545-563.
Crossref
A. S. Xanthopoulos & D. E. Koulouriotis. (2015) Cluster analysis and neural network-based metamodeling of priority rules for dynamic sequencing. Journal of Intelligent Manufacturing 29:1, pages 69-91.
Crossref
M. Suresh, Pankaj Dutta & Karuna Jain. (2016) Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times. Asia-Pacific Journal of Operational Research 32:06, pages 1550048.
Crossref
Tian-Hua Jiang & Hao-Xiang Wang. (2014) Study on the self-evolution problem of an aircraft-engine assembly workshop with uncertain number of assembly times. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 229:8, pages 1418-1428.
Crossref
Midhun Paul, R. Sridharan & T. Radha Ramanan. (2015) An Investigation of Order Review/Release Policies and Dispatching Rules for Assembly Job Shops with Multi Objective Criteria. Procedia - Social and Behavioral Sciences 189, pages 376-384.
Crossref
Anna Azzi, Daria Battini, Maurizio Faccio, Alessandro Persona & Fabio Sgarbossa. (2014) Inventory holding costs measurement: a multi-case study. The International Journal of Logistics Management 25:1, pages 109-132.
Crossref
A.S. Xanthopoulos, D.E. Koulouriotis, V.D. Tourassis & D.M. Emiris. (2013) Intelligent controllers for bi-objective dynamic scheduling on a single machine with sequence-dependent setups. Applied Soft Computing 13:12, pages 4704-4717.
Crossref
M.-S. Lu & R. Romanowski. (2013) Multicontextual dispatching rules for job shops with dynamic job arrival. The International Journal of Advanced Manufacturing Technology 67:1-4, pages 19-33.
Crossref
T.C. Wong & S.C. Ngan. (2013) A comparison of hybrid genetic algorithm and hybrid particle swarm optimization to minimize makespan for assembly job shop. Applied Soft Computing 13:3, pages 1391-1399.
Crossref
Dimitrios E. Koulouriotis & Alexandros Xanthopoulos. 2013. Outsourcing Management for Supply Chain Operations and Logistics Service. Outsourcing Management for Supply Chain Operations and Logistics Service 134 149 .
Xinyu Shao, Binggang Wang, Yunqing Rao, Liang Gao & Chi Xu. (2009) Metaheuristic approaches to sequencing mixed-model fabrication/assembly systems with two objectives. The International Journal of Advanced Manufacturing Technology 48:9-12, pages 1159-1171.
Crossref
T.C. Wong, Felix T.S. Chan & L.Y. Chan. (2009) A resource-constrained assembly job shop scheduling problem with Lot Streaming technique. Computers & Industrial Engineering 57:3, pages 983-995.
Crossref
Felix T.S. Chan, T.C. Wong & L.Y. Chan. (2009) An evolutionary algorithm for assembly job shop with part sharing. Computers & Industrial Engineering 57:3, pages 641-651.
Crossref
Felix T. S. Chan, T. C. Wong & L. Y. Chan. (2008) A Genetic Algorithm-based approach to job shop scheduling problem with assembly stage. A Genetic Algorithm-based approach to job shop scheduling problem with assembly stage.
F.T.S. Chan, T.C. Wong & L.Y. Chan. (2008) Lot streaming for product assembly in job shop environment. Robotics and Computer-Integrated Manufacturing 24:3, pages 321-331.
Crossref
Masao Yokoyama. (2008) Flow-shop scheduling with setup and assembly operations. European Journal of Operational Research 187:3, pages 1184-1195.
Crossref
S. Thiagarajan & Chandrasekharan Rajendran. (2005) Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs. Computers & Industrial Engineering 49:4, pages 463-503.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.