423
Views
42
CrossRef citations to date
0
Altmetric
Original Articles

Heuristics for minimizing total weighted tardiness in complex job shops

, , &
Pages 1943-1963 | Received 01 Aug 2004, Published online: 22 Feb 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Lars Mönch & Jens Zimmermann. (2011) A computational study of a shifting bottleneck heuristic for multi-product complex job shops. Production Planning & Control 22:1, pages 25-40.
Read now
Xiaoyan Zhu & WilbertE. Wilhelm. (2006) Scheduling and lot sizing with sequence-dependent setup: A literature review. IIE Transactions 38:11, pages 987-1007.
Read now
J. N. D. Gupta, R. Ruiz, J. W. Fowler & S. J. Mason. (2006) Operational planning and control of semiconductor wafer production. Production Planning & Control 17:7, pages 639-647.
Read now

Articles from other publishers (39)

Stéphane Dauzère-Pérès, Junwen Ding, Liji Shen & Karim Tamssaouet. (2024) The flexible job shop scheduling problem: A review. European Journal of Operational Research 314:2, pages 409-432.
Crossref
Corentin Juvigny, Julien Baste, Guillaume Lozenguez, Arnaud Doniec & Laetitia Jourdan. (2023) A Hybrid Genetic Approach for Bi-Level Flexible Job Shops Arising from Selective Deconstruction. A Hybrid Genetic Approach for Bi-Level Flexible Job Shops Arising from Selective Deconstruction.
Je-Hun Lee & Hyun-Jung Kim. (2022) Imitation Learning for Real-Time Job Shop Scheduling Using Graph-Based Representation. Imitation Learning for Real-Time Job Shop Scheduling Using Graph-Based Representation.
John W. Fowler & Lars Mönch. (2022) A survey of scheduling with parallel batch (p-batch) processing. European Journal of Operational Research 298:1, pages 1-24.
Crossref
Karim Tamssaouet, Stéphane Dauzère-Pérès, Sebastian Knopp, Abdoul Bitar & Claude Yugma. (2022) Multiobjective optimization for complex flexible job-shop scheduling problems. European Journal of Operational Research 296:1, pages 87-100.
Crossref
Je-Hun Lee, Hyun-Jung Kim, Young Kim, Yun Bae Kim, Byung-Hee Kim & Gu-Hwan Chung. (2021) Machine Learning-Based Periodic Setup Changes for Semiconductor Manufacturing Machines. Machine Learning-Based Periodic Setup Changes for Semiconductor Manufacturing Machines.
Branislav Micieta, Jolanta Staszewska, Matej Kovalsky, Martin Krajcovic, Vladimira Binasova, Ladislav Papanek & Ivan Antoniuk. (2021) Innovative System for Scheduling Production Using a Combination of Parametric Simulation Models. Sustainability 13:17, pages 9518.
Crossref
Jae-Gon Kim, Hong-Bae Jun, June-Young Bang, Jong-Ho Shin & Seong-Hoon Choi. (2020) Minimizing Tardiness Penalty Costs in Job Shop Scheduling under Maximum Allowable Tardiness. Processes 8:11, pages 1398.
Crossref
Je-Hun Lee, Young Kim, Yun Bae Kim, Byung-Hee Kim, Gu-Hwan Jung & Hyun-Jung Kim. (2020) A Sequential Search Method of Dispatching Rules for Scheduling of LCD Manufacturing Systems. IEEE Transactions on Semiconductor Manufacturing 33:4, pages 496-503.
Crossref
Thomas Van den Bossche, Hatice Çalık, Evert-Jan Jacobs, Túlio A.M. Toffolo & Greet Vanden Berghe. (2020) Truck scheduling in tank terminals. EURO Journal on Transportation and Logistics 9:1, pages 100001.
Crossref
Lingxuan Liu & Leyuan Shi. (2019) Simulation Optimization on Complex Job Shop Scheduling with Non-Identical Job Sizes. Asia-Pacific Journal of Operational Research 36:05, pages 1950026.
Crossref
Venkatesh Arasanipalai Raghavan, Sang Won Yoon & Krishnaswami Srihari. (2018) A modified Genetic Algorithm approach to minimize total weighted tardiness with stochastic rework and reprocessing times. Computers & Industrial Engineering 123, pages 42-53.
Crossref
Po-Chen Lin & Leon McGinnis. (2017) Test problems, reference models and fab simulation. Test problems, reference models and fab simulation.
Sebastian Knopp, Stéphane Dauzère-Pérès & Claude Yugma. (2017) A batch-oblivious approach for Complex Job-Shop scheduling problems. European Journal of Operational Research 263:1, pages 50-61.
Crossref
Yi Tan, Torsten Hildebrandt & Bernd Scholz-Reiter. (2015) Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem. Journal of Scheduling 19:4, pages 429-452.
Crossref
Oleh Sobeyko & Lars Mönch. (2016) Heuristic approaches for scheduling jobs in large-scale flexible job shops. Computers & Operations Research 68, pages 97-109.
Crossref
Hazem Kaylani & Anas M. Atieh. (2016) Simulation Approach to Enhance Production Scheduling Procedures at a Pharmaceutical Company with Large Product Mix. Procedia CIRP 41, pages 411-416.
Crossref
Venkatesh Arasanipalai Raghavan, Sang Won Yoon & Krishnaswami Srihari. (2015) Heuristic algorithms to minimize total weighted tardiness with stochastic rework and reprocessing times. Journal of Manufacturing Systems 37, pages 233-242.
Crossref
Yasothei Suppiah & Mohamed K. Omar. (2014) A hybrid tabu search for batching and sequencing decisions in a single machine environment. Computers & Industrial Engineering 78, pages 135-147.
Crossref
Miguel Rojas-Santiago, Purushothaman Damodaran, Shanthi Muthuswamy & Mario C. Vélez-Gallego. (2013) Makespan minimization in a job shop with a BPM using simulated annealing. The International Journal of Advanced Manufacturing Technology 68:9-12, pages 2383-2391.
Crossref
Yue Xi & Jaejin Jang. (2013) Minimizing total weighted tardiness on a single machine with sequence-dependent setup and future ready time. The International Journal of Advanced Manufacturing Technology 67:1-4, pages 281-294.
Crossref
Bernd Scholz-Reiter, Torsten Hildebrandt & Yi Tan. (2013) Effective and efficient scheduling of dynamic job shops—Combining the shifting bottleneck procedure with variable neighbourhood search. CIRP Annals 62:1, pages 423-426.
Crossref
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 247 266 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 207 246 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 177 205 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 105 175 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 65 104 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 29 64 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 11 28 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 1 10 .
Lars Mönch, John W. Fowler, Stéphane Dauzère-Pérès, Scott J. Mason & Oliver Rose. (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. Journal of Scheduling 14:6, pages 583-599.
Crossref
Veronique Sels, Frederic Steen & Mario Vanhoucke. (2011) Applying a hybrid job shop procedure to a Belgian manufacturing company producing industrial wheels and castors in rubber. Computers & Industrial Engineering 61:3, pages 697-708.
Crossref
Christoph Pickardt, Jurgen Branke, Torsten Hildebrandt, Jens Heger & Bernd Scholz-Reiter. (2010) Generating dispatching rules for semiconductor manufacturing to minimize weighted tardiness. Generating dispatching rules for semiconductor manufacturing to minimize weighted tardiness.
Ganggang Niu, Shudong Sun, Pascal Lafon & Junqiang Wang. (2010) A Decomposition Algorithm for Bicriteria Job-Shop Scheduling Problem with Discretely Controllable Processing Times. A Decomposition Algorithm for Bicriteria Job-Shop Scheduling Problem with Discretely Controllable Processing Times.
Jagadish Jampani & Scott J. Mason. (2010) A column generation heuristic for complex job shop multiple orders per job scheduling. Computers & Industrial Engineering 58:1, pages 108-118.
Crossref
Márton Drótos, Gábor Erdős & Tamás Kis. (2009) Computing lower and upper bounds for a large-scale industrial job shop scheduling problem. European Journal of Operational Research 197:1, pages 296-306.
Crossref
Hsueh-Chien Cheng, Tsung-Che Chiang & Li-Chen Fu. (2008) A memetic algorithm for parallel batch machine scheduling with incompatible job families and dynamic job arrivals. A memetic algorithm for parallel batch machine scheduling with incompatible job families and dynamic job arrivals.
Michele E. Pfund, Hari Balasubramanian, John W. Fowler, Scott J. Mason & Oliver Rose. (2007) A multi-criteria approach for scheduling semiconductor wafer fabrication facilities. Journal of Scheduling 11:1, pages 29-47.
Crossref
Supachai Pathumnakul & Pius J. Egbelu. (2006) An algorithm for minimizing weighted earliness penalty in assembly job shops. International Journal of Production Economics 103:1, pages 230-245.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.