Frederik Ferid Ostermeier & Jochen Deuse. (2023) A review and classification of scheduling objectives in unpaced flow shops for discrete manufacturing. Journal of Scheduling.
Crossref
Maximilian Johannes Schlüter & Frederik Ferid Ostermeier. (2022) Dynamic line balancing in unpaced mixed-model assembly lines: A problem classification. CIRP Journal of Manufacturing Science and Technology 37, pages 134-142.
Crossref
Jens Buergin, Sina Helming, Jan Andreas, Philippe Blaettchen, Yannick Schweizer, Frank Bitte, Benjamin Haefner & Gisela Lanza. (2018) Local order scheduling for mixed-model assembly lines in the aircraft manufacturing industry. Production Engineering 12:6, pages 759-767.
Crossref
Ömer Faruk Yılmaz & Mehmet Bülent Durmuşoğlu. 2018. Handbook of Research on Applied Optimization Methodologies in Manufacturing Systems. Handbook of Research on Applied Optimization Methodologies in Manufacturing Systems
125
161
.
Joaquín Bautista, Alberto Cano & Rocío Alfaro-Pozo. (2016) A hybrid dynamic programming for solving a mixed-model sequencing problem with production mix restriction and free interruptions. Progress in Artificial Intelligence 6:1, pages 27-39.
Crossref
Donghao Zhang, Haruki Matsuura & Akiko Asada. Effect of splitting a mixed-model line on shortening the line length under open- and closed-boundary working area settings. Effect of splitting a mixed-model line on shortening the line length under open- and closed-boundary working area settings.
Yearnmin Kim & Won-Joon Choi. (2016) Sequencing the Mixed Model Assembly Line with Multiple Stations to Minimize the Total Utility Work and Idle Time. Industrial Engineering and Management Systems 15:1, pages 1-10.
Crossref
Omer Faruk Yilmaz & Hikmet Erbiyik. 2016. Comparative Economics and Regional Development in Turkey. Comparative Economics and Regional Development in Turkey
319
335
.
Gyan Bahadur Thapa & Sergei Silvestrov. 2016. Engineering Mathematics II. Engineering Mathematics II
313
325
.
Joaquín Bautista, Rocío Alfaro & Cristina Batalla. (2015) Modeling and solving the mixed-model sequencing problem to improve productivity. International Journal of Production Economics 161, pages 83-95.
Crossref
Markus Pröpster, Lothar März, Gunther Reinhart & Carsten Intra. (2015) Validation of Line Balancing by Simulation of Workforce Flexibility. Procedia CIRP 33, pages 93-98.
Crossref
Lothar März. 2015. Produktionsplanung und –steuerung. Produktionsplanung und –steuerung
241
255
.
Markus Pröpster & Gunther Reinhart. 2014. Enabling Manufacturing Competitiveness and Economic Sustainability. Enabling Manufacturing Competitiveness and Economic Sustainability
177
182
.
Shusaku Hiraki, Zhuqi Xu & Shaolan Yang. 2013. LTLGB 2012. LTLGB 2012
481
487
.
Joaquín Bautista, Alberto Cano & Rocío Alfaro. (2012) Models for MMSP-W considering workstation dependencies: A case study of Nissan’s Barcelona plant. European Journal of Operational Research 223:3, pages 669-679.
Crossref
Joaquı´n Bautista, Alberto Cano & Rocı´o Alfaro. (2012) Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan’s Barcelona Plant. Expert Systems with Applications 39:12, pages 11001-11010.
Crossref
Jenny Golz, Rico Gujjula, Hans-Otto Günther, Stefan Rinderer & Marcus Ziegler. (2011) Part feeding at high-variant mixed-model assembly lines. Flexible Services and Manufacturing Journal 24:2, pages 119-141.
Crossref
Jaime Cano-Belmán, Roger Z. Ríos-Mercado & Joaquín Bautista. (2009) A scatter search based hyper-heuristic for sequencing a mixed-model assembly line. Journal of Heuristics 16:6, pages 749-770.
Crossref
Luciano Fonseca Araujo & Abelardo Alves Queiroz. 2010. Advances in Production Management Systems. New Challenges, New Approaches. Advances in Production Management Systems. New Challenges, New Approaches
81
88
.
Joaquin Bautista & Raul Suarez. (2009) Mixed-Model Sequencing Problem with overload minimization considering workstations dependencies. Mixed-Model Sequencing Problem with overload minimization considering workstations dependencies.
Nils Boysen, Malte Fliedner & Armin Scholl. (2009) Sequencing mixed-model assembly lines: Survey, classification and model critique. European Journal of Operational Research 192:2, pages 349-373.
Crossref
Joaquín Bautista & Jaime Cano. (2008) Minimizing work overload in mixed-model assembly lines. International Journal of Production Economics 112:1, pages 177-191.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2007) Produktionsplanung bei Variantenfließfertigung: Planungshierarchie und Elemente einer Hierarchischen PlanungHierarchical production planning of mixed-model assembly lines. Journal of Business Economics 77:7-8, pages 759-793.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2007) Level-Scheduling bei Variantenfließfertigung: Klassifikation, Literaturüberblick und Modellkritik. Journal für Betriebswirtschaft 57:1, pages 37-66.
Crossref