195
Views
43
CrossRef citations to date
0
Altmetric
Original Articles

Guided genetic algorithms for solving a larger constraint assembly problem

Pages 601-625 | Received 01 Jun 2005, Published online: 22 Feb 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (7)

Wenbo Wu, Zhengdong Huang, Jiani Zeng & Kuan Fan. (2022) A decision-making method for assembly sequence planning with dynamic resources. International Journal of Production Research 60:15, pages 4797-4816.
Read now
Liang Gao, Chunjiang Zhang, Xinyu Li & Lijian Wang. (2014) Discrete electromagnetism-like mechanism algorithm for assembly sequences planning. International Journal of Production Research 52:12, pages 3485-3503.
Read now
Kunlei Lian, Chaoyong Zhang, Liang Gao & Xinyu Shao. (2012) A modified colonial competitive algorithm for the mixed-model U-line balancing and sequencing problem. International Journal of Production Research 50:18, pages 5117-5131.
Read now
Z.H. Che. (2010) A genetic algorithm-based model for solving multi-period supplier selection problem with assembly sequence. International Journal of Production Research 48:15, pages 4355-4377.
Read now
Yu-Lan Jin, Zu-Hua Jiang & Wen-Rui Hou. (2009) Integrating flexible-interval preventive maintenance planning with production scheduling. International Journal of Computer Integrated Manufacturing 22:12, pages 1089-1101.
Read now
Wen-Pai Wang & Hwai-En Tseng. (2009) COMPLEXITY ESTIMATION FOR GENETIC ASSEMBLY SEQUENCE PLANNING. Journal of the Chinese Institute of Industrial Engineers 26:1, pages 44-52.
Read now
H.-E. Tseng, M.-H. Chen, C.-C. Chang & W.-P. Wang. (2008) Hybrid evolutionary multi-objective algorithms for integrating assembly sequence planning and assembly line balancing. International Journal of Production Research 46:21, pages 5951-5977.
Read now

Articles from other publishers (36)

Kai Guo, Rui Liu, Guijiang Duan, Jiajun Liu & Pengyong Cao. (2023) Research on dynamic decision-making for product assembly sequence based on Connector-Linked Model and deep reinforcement learning. Journal of Manufacturing Systems 71, pages 451-473.
Crossref
Hongyan Chu, Ke Dong, Jun Yan, Zhuoran Li, Zhifeng Liu, Qiang Cheng & Caixia Zhang. (2023) Flexible process planning based on predictive models for machining time and energy consumption. The International Journal of Advanced Manufacturing Technology 128:3-4, pages 1763-1780.
Crossref
Qiang Yue. (2022) Dynamic Database Design of Sports Quality Based on Genetic Data Algorithm and Artificial Intelligence. Computational Intelligence and Neuroscience 2022, pages 1-10.
Crossref
Chunjie Zou, Weijuan Wang & Libo Zhu. (2022) Effectiveness of Network Classroom Teaching Based on Genetic Algorithm. Mobile Information Systems 2022, pages 1-10.
Crossref
Liangliang Jin, Chaoyong Zhang, Xiaoyu Wen, Chengda Sun & Xinjiang Fei. (2021) A neutrosophic set-based TLBO algorithm for the flexible job-shop scheduling problem with routing flexibility and uncertain processing times. Complex & Intelligent Systems 7:6, pages 2833-2853.
Crossref
Z.H. Che, Tzu-An Chiang & Tzu-Ting Lin. (2021) A multi-objective genetic algorithm for assembly planning and supplier selection with capacity constraints. Applied Soft Computing 101, pages 107030.
Crossref
Liangliang Jin, Chaoyong Zhang, Xiaoyu Wen & George Gershom Christopher. (2020) A Neutrosophic Number-Based Memetic Algorithm for the Integrated Process Planning and Scheduling Problem With Uncertain Processing Times. IEEE Access 8, pages 96628-96648.
Crossref
Dashuang Li, Chaoyong Zhang, Guangdong Tian, Xinyu Shao & Zhiwu Li. (2018) Multiobjective Program and Hybrid Imperialist Competitive Algorithm for the Mixed-Model Two-Sided Assembly Lines Subject to Multiple Constraints. IEEE Transactions on Systems, Man, and Cybernetics: Systems 48:1, pages 119-129.
Crossref
Jin Huang, Liangliang Jin & Chaoyong Zhang. (2017) Mathematical Modeling and a Hybrid NSGA-II Algorithm for Process Planning Problem Considering Machining Cost and Carbon Emission. Sustainability 9:10, pages 1769.
Crossref
Liangliang Jin, Chaoyong Zhang, Xinyu Shao & Xudong Yang. (2016) A study on the impact of periodic and event-driven rescheduling on a manufacturing system: An integrated process planning and scheduling case. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 231:3, pages 490-504.
Crossref
Zhicheng Zhou, Biao Yuan, Pengfei Xiao & Chaoyong Zhang. (2016) A Modified honey bees mating optimization algorithm for assembly line balancing problem. A Modified honey bees mating optimization algorithm for assembly line balancing problem.
Dashuang Li, Chaoyong Zhang, Xinyu Shao & Wenwen Lin. (2014) A multi-objective TLBO algorithm for balancing two-sided assembly line with multiple constraints. Journal of Intelligent Manufacturing 27:4, pages 725-739.
Crossref
Liangliang Jin, Chaoyong Zhang, Xinyu Shao & Guangdong Tian. (2016) Mathematical modeling and a memetic algorithm for the integration of process planning and scheduling considering uncertain processing times. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 230:7, pages 1272-1283.
Crossref
Liangliang Jin, Chaoyong Zhang, Xinyu Shao, Xudong Yang & Guangdong Tian. (2015) A multi-objective memetic algorithm for integrated process planning and scheduling. The International Journal of Advanced Manufacturing Technology 85:5-8, pages 1513-1528.
Crossref
Liangliang Jin, Chaoyong Zhang & Xinyu Shao. (2015) An effective hybrid honey bee mating optimization algorithm for integrated process planning and scheduling problems. The International Journal of Advanced Manufacturing Technology 80:5-8, pages 1253-1264.
Crossref
H. S. Wang, C. H. Tu & K. H. Chen. (2015) Supplier Selection and Production Planning by Using Guided Genetic Algorithm and Dynamic Nondominated Sorting Genetic Algorithm II Approaches. Mathematical Problems in Engineering 2015, pages 1-15.
Crossref
Biao Yuan, Chaoyong Zhang, Xinyu Shao & Zhibin Jiang. (2015) An effective hybrid honey bee mating optimization algorithm for balancing mixed-model two-sided assembly lines. Computers & Operations Research 53, pages 32-41.
Crossref
Baoxi Wang, Zailin Guan, Dashuang Li, Chaoyong Zhang & Lei Chen. (2014) Two-sided assembly line balancing with operator number and task constraints: a hybrid imperialist competitive algorithm. The International Journal of Advanced Manufacturing Technology 74:5-8, pages 791-805.
Crossref
Da Shuang Li, Chao Yong Zhang, Xin Yu Shao & Zhan Peng Xie. (2014) An Improved TLBO Algorithm for Balancing Stochastic Two-Sided Assembly Line. Applied Mechanics and Materials 610, pages 345-349.
Crossref
Xiao-yu Wen, Xin-yu Li, Liang Gao & Hong-yan Sang. (2012) Honey bees mating optimization algorithm for process planning problem. Journal of Intelligent Manufacturing 25:3, pages 459-472.
Crossref
Hanye Zhang, Haijiang Liu & Lingyu Li. (2013) Research on a kind of assembly sequence planning based on immune algorithm and particle swarm optimization algorithm. The International Journal of Advanced Manufacturing Technology 71:5-8, pages 795-808.
Crossref
Ying Ying Su, Hai Dong & Di Liang. (2013) Assembly Sequence Planning Based on Connector Structure and Ant Colony Algorithm. Advanced Materials Research 712-715, pages 2482-2486.
Crossref
Congwen Zeng, Tianlong Gu, Liang Chang & Fengyin Li. (2013) A Novel Multi-agent Evolutionary Algorithm for Assembly Sequence Planning. Journal of Software 8:6.
Crossref
Biao Yuan, Chaoyong Zhang, Kunlei Lian & Xinyu Shao. (2012) A hybrid honey-bees mating optimization algorithm for assembly sequence planning problem. A hybrid honey-bees mating optimization algorithm for assembly sequence planning problem.
H.S. Wang, Z.H. Che & C.J. Chiang. (2012) A hybrid genetic algorithm for multi-objective product plan selection problem with ASP and ALB. Expert Systems with Applications 39:5, pages 5440-5450.
Crossref
Kunlei Lian, Chaoyong Zhang, Xinyu Shao & Liang Gao. (2011) Optimization of process planning with various flexibilities using an imperialist competitive algorithm. The International Journal of Advanced Manufacturing Technology 59:5-8, pages 815-828.
Crossref
KunLei Lian, ChaoYong Zhang, XinYu Shao & YaoHui Zeng. (2011) A multi-dimensional tabu search algorithm for the optimization of process planning. Science China Technological Sciences 54:12, pages 3211-3219.
Crossref
Christiand & Jungwon Yoon. (2011) Assembly simulations in virtual environments with optimized haptic path and sequence. Robotics and Computer-Integrated Manufacturing 27:2, pages 306-317.
Crossref
Congwen Zeng, Tianlong Gu, Yanru Zhong & Guoyong Cai. (2011) A Multi-Agent Evolutionary algorIthm for Connector-Based Assembly Sequence Planning. Procedia Engineering 15, pages 3689-3693.
Crossref
Hwai-En Tseng. 2011. Electronics and Signal Processing. Electronics and Signal Processing 881 888 .
Chien-Cheng Chang, Hwai-En Tseng & Ling-Peng Meng. (2009) Artificial immune systems for assembly sequence planning exploration. Engineering Applications of Artificial Intelligence 22:8, pages 1218-1232.
Crossref
Christiand, Jungwon Yoon, Manurung Auralius & Wonpil Yu. (2009) An enhanced haptic assembly simulation system for the efficiency of assembly tasks. An enhanced haptic assembly simulation system for the efficiency of assembly tasks.
Cheng-Jui Chiang, Zheng-Hua Che & Her-Shing Wang. (2009) Multi-period Product Configuration Change Planning: An Application of a Hybrid Algorithm. Multi-period Product Configuration Change Planning: An Application of a Hybrid Algorithm.
Christiand, Jungwon Yoon & Prasanth Kumar. (2009) A novel optimal assembly algorithm for haptic interface applications of a virtual maintenance system. Journal of Mechanical Science and Technology 23:1, pages 183-194.
Crossref
Hwai-En Tseng, Wen-Pai Wang & Hsun-Yi Shih. (2007) Using memetic algorithms with guided local search to solve assembly sequence planning. Expert Systems with Applications 33:2, pages 451-467.
Crossref
Jun-Gyu Kang & P Xirouchakis. (2016) Disassembly sequencing for maintenance: A survey. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220:10, pages 1697-1716.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.