478
Views
35
CrossRef citations to date
0
Altmetric
Original Articles

Bio-inspired scheduling for dynamic job shops with flexible routing and sequence-dependent setups

&
Pages 4793-4813 | Received 01 Feb 2006, Published online: 22 Feb 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (4)

Gabriel Zambrano Rey, Abdelghani Bekrar, Vittaldas Prabhu & Damien Trentesaux. (2014) Coupling a genetic algorithm with the distributed arrival-time control for the JIT dynamic scheduling of flexible job-shops. International Journal of Production Research 52:12, pages 3688-3709.
Read now
Nuno O. Fernandes & S. Carmo-Silva. (2011) Order release in a workload controlled flow-shop with sequence-dependent set-up times. International Journal of Production Research 49:8, pages 2443-2454.
Read now
P. Renna. (2010) Job shop scheduling by pheromone approach in a dynamic environment. International Journal of Computer Integrated Manufacturing 23:5, pages 412-424.
Read now

Articles from other publishers (31)

Sushma Rani, Ajai Jain & Surjit Angra. (2023) Effect of Setup Times and Workload Trigger Levels on Order Review and Release Policies Performance in a Stochastic Dynamic Job Shop with Sequence-Dependent Setup Time — A Simulation Approach. Journal of Advanced Manufacturing Systems 22:04, pages 781-798.
Crossref
Xixing Li, Xing Guo, Hongtao Tang, Rui Wu, Lei Wang, Shibao Pang, Zhengchao Liu, Wenxiang Xu & Xin Li. (2022) Survey of integrated flexible job shop scheduling problems. Computers & Industrial Engineering 174, pages 108786.
Crossref
Xiaozhi Wang, Bing Wang, Xianxia Zhang, Xuedong Xia & Quanke Pan. (2021) Two-objective robust job-shop scheduling with two problem-specific neighborhood structures. Swarm and Evolutionary Computation 61, pages 100805.
Crossref
Sushma Rani, Ajai Jain & Surjit Angra. (2019) Effect of sequencing rules on order release policies in a stochastic and dynamic job shop with sequence-dependent setup times – a simulation study. Journal of Physics: Conference Series 1240:1, pages 012002.
Crossref
Jin Wang, Yingfeng Zhang, Yang Liu & Naiqi Wu. (2019) Multiagent and Bargaining-Game-Based Real-Time Scheduling for Internet of Things-Enabled Flexible Job Shop. IEEE Internet of Things Journal 6:2, pages 2518-2531.
Crossref
Alireza Birjandi & S. Meysam Mousavi. (2019) Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution. Automation in Construction 100, pages 84-102.
Crossref
Runhua Tan, Wei Liu, Guozhong Cao & Yuan Shi. (2018) Creative design inspired by biological knowledge: Technologies and methods. Frontiers of Mechanical Engineering 14:1, pages 1-14.
Crossref
Mehdi Souier, Mohammed Dahane & Fouad Maliki. (2018) An NSGA-II-based multiobjective approach for real-time routing selection in a flexible manufacturing system under uncertainty and reliability constraints. The International Journal of Advanced Manufacturing Technology 100:9-12, pages 2813-2829.
Crossref
Pankaj Sharma & Ajai Jain. (2016) Effect of routing flexibility and sequencing rules on performance of stochastic flexible job shop manufacturing system with setup times: Simulation approach. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 231:2, pages 329-345.
Crossref
Pankaj Sharma & Ajai Jain. (2015) New setup-oriented dispatching rules for a stochastic dynamic job shop manufacturing system with sequence-dependent setup times. Concurrent Engineering 24:1, pages 58-68.
Crossref
Pankaj Sharma & Ajai Jain. (2015) A review on job shop scheduling with setup times. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 230:3, pages 517-533.
Crossref
Ali Allahverdi. (2015) The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research 246:2, pages 345-378.
Crossref
Pankaj Sharma & Ajai Jain. (2015) Performance analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times: Simulation approach. CIRP Journal of Manufacturing Science and Technology 10, pages 110-119.
Crossref
Pankaj Sharma & Ajai Jain. (2015) Stochastic Dynamic Job Shop Scheduling with Sequence-Dependent Setup Times: Simulation Experimentation. Journal of Engineering and Technology 5:1, pages 19.
Crossref
Christian Blum & Roderich Groß. 2015. Springer Handbook of Computational Intelligence. Springer Handbook of Computational Intelligence 1291 1309 .
Pankaj Sharma & Ajai Jain. (2014) Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times. Frontiers of Mechanical Engineering 9:4, pages 380-389.
Crossref
Mehdi Souier & Zaki Sari. (2014) Impacts of Scheduling Decisions Based On PSO Algorithm and Dispatching Rules on FMS Performances. International Journal of Applied Metaheuristic Computing 5:2, pages 22-38.
Crossref
Yu-Cheng Chou, Huajun Cao & Harry H. Cheng. (2013) A bio-inspired mobile agent-based integrated system for flexible autonomic job shop scheduling. Journal of Manufacturing Systems 32:4, pages 752-763.
Crossref
Hamid Reza Golmakani & Ali Reza Birjandi. (2013) A two-phase algorithm for multiple-route job shop scheduling problem subject to makespan. The International Journal of Advanced Manufacturing Technology 67:1-4, pages 203-216.
Crossref
Liping Zhang, Xinyu Li, Long Wen & Guohui Zhang. (2013) An Efficient Memetic Algorithm for Dynamic Flexible Job Shop Scheduling with Random Job Arrivals. International Journal of Software Science and Computational Intelligence 5:1, pages 63-77.
Crossref
Liping Zhang, Xinyu Li, Long Wen & Guohui Zhang. (2012) Scheduling flexible job shop in dynamic environment based on a memetic algorithm. Scheduling flexible job shop in dynamic environment based on a memetic algorithm.
Youichi Nonaka, Gábor Erdős, Tamás Kis, Takahiro Nakano & József Váncza. (2012) Scheduling with alternative routings in CNC workshops. CIRP Annals 61:1, pages 449-454.
Crossref
Amir Rajabinasab & Saeed Mansour. (2010) Dynamic flexible job shop scheduling with alternative process plans: an agent-based approach. The International Journal of Advanced Manufacturing Technology 54:9-12, pages 1091-1107.
Crossref
Adam Campbell & Annie S. Wu. (2010) Multi-agent role allocation: issues, approaches, and multiple perspectives. Autonomous Agents and Multi-Agent Systems 22:2, pages 317-355.
Crossref
L.H. Shu, K. Ueda, I. Chiu & H. Cheong. (2011) Biologically inspired design. CIRP Annals 60:2, pages 673-693.
Crossref
Ruiqiang Lu & David Zhengwen Zhang. (2010) A novel agent bidding based optimization approach in manufacturing planning and scheduling. A novel agent bidding based optimization approach in manufacturing planning and scheduling.
Kagan Tumer & John Lawson. 2010. Adaptive and Learning Agents. Adaptive and Learning Agents 123 140 .
Mojahid Saeed Osman, Bala Ram, Joy Bhadury, Paul Stanfield, Lauren Davis & Funda Samanlioglu. (2009) Optimization Model For Distributed Routing For Disaster Area Logistics. Optimization Model For Distributed Routing For Disaster Area Logistics.
Wei Xiang & Heow Pueh Lee. (2008) Ant colony intelligence in agent coordination for dynamic manufacturing scheduling. Ant colony intelligence in agent coordination for dynamic manufacturing scheduling.
W. Xiang & H.P. Lee. (2008) Ant colony intelligence in multi-agent dynamic manufacturing scheduling. Engineering Applications of Artificial Intelligence 21:1, pages 73-85.
Crossref
Christian Blum & Xiaodong Li. 2008. Swarm Intelligence. Swarm Intelligence 43 85 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.