247
Views
23
CrossRef citations to date
0
Altmetric
Original Articles

Performance of serial assembly line designs under unequal operator speeds and learning

, , &
Pages 5355-5381 | Received 01 Nov 2005, Published online: 03 Oct 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (10)

Yossi Bukchin, Eran Hanany & Eugene Khmelnitsky. (2024) Sequencing heterogeneous orders in Bucket Brigade order-picking lines. IISE Transactions 0:0, pages 1-17.
Read now
Giulia Bruno, Dario Antonelli & Dorota Stadnicka. (2021) Evaluating the effect of learning rate, batch size and assignment strategies on the production performance. Journal of Industrial and Production Engineering 38:2, pages 137-147.
Read now
Yossi Bukchin, Eran Hanany & Eugene Khmelnitsky. (2018) Bucket brigade with stochastic worker pace. IISE Transactions 50:12, pages 1027-1042.
Read now
Chenjie Wang, Ningxuan Kang & Li Zheng. (2016) A factory-level dynamic operator allocation policy: the bubble allocation. International Journal of Production Research 54:14, pages 4240-4255.
Read now
Sarah Hudson, Tom McNamara & Sabry Shaaban. (2015) Unbalanced lines: where are we now?. International Journal of Production Research 53:6, pages 1895-1911.
Read now
Yossi Bukchin & Yuval Cohen. (2013) Minimising throughput loss in assembly lines due to absenteeism and turnover via work-sharing. International Journal of Production Research 51:20, pages 6140-6151.
Read now
Yuval Cohen. (2012) Absenteeism as a major cause of bottlenecks in assembly lines. International Journal of Production Research 50:21, pages 6072-6080.
Read now
Rolando Quintana, Mark T. Leung, J. Rene Villalobos & Michael Graul. (2009) Corrective maintenance through dynamic work allocation and pre-emption: case study and application. International Journal of Production Research 47:13, pages 3539-3557.
Read now
R. Gamberini, E. Gebennini, A. Grassi & A. Regattieri. (2009) A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem. International Journal of Production Research 47:8, pages 2141-2164.
Read now

Articles from other publishers (13)

Thilini Ranasinghe, Chanaka D. Senanayake & Eric H. Grosse. (2024) Effects of stochastic and heterogeneous worker learning on the performance of a two-workstation production system. International Journal of Production Economics 267, pages 109076.
Crossref
Ilenia Zennaro, Martina Calzavara, Maurizio Faccio & Alessandro Persona. (2023) Consideration of the learning effect in the comparison of Fixed Worker and Walking Worker assembly systems. IFAC-PapersOnLine 56:2, pages 707-712.
Crossref
Arvind Ashta. (2021) In the wake of the COVID crisis, Work-sharing from Different Angles: Employment, Equality, Ecology and Elation. Marché et organisations n° 40:1, pages 159-186.
Crossref
Francesco Pilati, Maurizio Faccio & Yuval Cohen. (2021) Absenteeism and Turnover as Motivation Factors for Segmenting Assembly Lines. IFAC-PapersOnLine 54:1, pages 613-616.
Crossref
Rossana Cavagnini, Mike Hewitt & Francesca Maggioni. (2020) Workforce production planning under uncertain learning rates. International Journal of Production Economics 225, pages 107590.
Crossref
J. Tilindis & V. Kleiza. (2017) Learning curve parameter estimation beyond traditional statistics. Applied Mathematical Modelling 45, pages 768-783.
Crossref
Dorota Stadnicka, Dario Antonelli & Giulia Bruno. (2017) Work Sequence Analysis and Computer Simulations of Value Flow and Workers’ Relocations: A Case Study. Procedia CIRP 62, pages 159-164.
Crossref
Tom McNamara, Sabry Shaaban & Sarah Hudson. (2016) Fifty years of the bowl phenomenon. Journal of Manufacturing Systems 41, pages 1-7.
Crossref
Rogério F. da Silva, Renelson R. Sampaio & Francisco U. Passos. (2016) Unbalancing Capacity: A Possible Way of Reducing Work-in-Process Inventory. Journal of Industrial and Intelligent Information.
Crossref
Srinath Sriram, Michael E. Kuhl, Brian K. Thorn & Andres L. Carrano. (2014) A novel work-sharing protocol for U-shaped assembly lines. A novel work-sharing protocol for U-shaped assembly lines.
Justinas Tilindis & Vytautas Kleiza. (2014) The Effect of Learning Factors due to Low Volume Order Fluctuations in the Automotive Wiring Harness Production. Procedia CIRP 19, pages 129-134.
Crossref
Yuval Cohen. (2013) Assembly line segmentation: determining the number of stations per section. Journal of Manufacturing Technology Management 24:3, pages 397-412.
Crossref
Kürşad Ağpak. (2010) An approach to find task sequence for re‐balancing of assembly lines. Assembly Automation 30:4, pages 378-387.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.