350
Views
24
CrossRef citations to date
0
Altmetric
Original Articles

Bootstrap approach for supplier selection based on production yield

, , &
Pages 5211-5230 | Received 01 Feb 2007, Published online: 02 Sep 2008

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (9)

Ming-Hung Shu, Chien-Wei Wu, Bi-Min Hsu & To-Cheng Wang. (2022) Standardized lifetime-capability and warranty-return-rate-based suppliers qualification and selection with accelerated Weibull-life type II testing data. Communications in Statistics - Theory and Methods 51:23, pages 8186-8204.
Read now
Chen-Ju Lin & Yi-Ling Shen. (2017) Comparing multiple process overall yields from multiple manufacturing lines. Communications in Statistics - Theory and Methods 46:23, pages 11764-11775.
Read now
E. Ertugrul Karsak & Mehtap Dursun. (2016) Taxonomy and review of non-deterministic analytical methods for supplier selection. International Journal of Computer Integrated Manufacturing 29:3, pages 263-286.
Read now
Mou-Yuan Liao, W.L. Pearn & Yen-Lun Liu. (2015) Assessing the actual Gamma process quality – a curve-fitting approach for modifying the non-normal flexible index. International Journal of Production Research 53:15, pages 4720-4734.
Read now
Chien-Wei Wu, Chi-Wei Lin & James C. Chen. (2013) An improved approach for process performance evaluation with the consideration of process yield and quality loss. International Journal of Production Research 51:21, pages 6397-6409.
Read now
Der-Chiang Li, Wen-Ting Huang, Chien-Chih Chen & Che-Jung Chang. (2013) Employing virtual samples to build early high-dimensional manufacturing models. International Journal of Production Research 51:11, pages 3206-3224.
Read now
Chien-Wei Wu, Mou-Yuan Liao & Tsung-Tse Yang. (2013) Efficient methods for comparing two process yields – strategies on supplier selection. International Journal of Production Research 51:5, pages 1587-1602.
Read now
Chien-Wei Wu & Ming-Hung Shu. (2012) A novel approach for measuring the maximum process-loss information in multiple production line conditions. International Journal of Production Research 50:14, pages 3809-3820.
Read now
Chien-Wei Wu & P. H. Huang. (2010) Generalized Confidence Intervals for Comparing the Capability of Two Processes. Communications in Statistics - Theory and Methods 39:13, pages 2351-2364.
Read now

Articles from other publishers (15)

Robab Afshari, Adel Ahmadi Nadi, Arne Johannssen, Nataliya Chukhrova & Kim Phuc Tran. (2022) The effects of measurement errors on estimating and assessing the multivariate process capability with imprecise characteristic. Computers & Industrial Engineering 172, pages 108563.
Crossref
Yeneneh Tamirat Negash, Jessica Kartika, Ming-Lang Tseng & Kimhua Tan. (2020) A novel approach to measure product quality in sustainable supplier selection. Journal of Cleaner Production 252, pages 119838.
Crossref
Patrycjusz Stoma, Monika Stoma, Agnieszka Dudziak & Jacek Caban. (2019) Bootstrap Analysis of the Production Processes Capability Assessment. Applied Sciences 9:24, pages 5360.
Crossref
Sumit Kumar, Sanku Dey & Mahendra Saha. (2019) Comparison between two generalized process capability indices for Burr XII distribution using bootstrap confidence intervals. Life Cycle Reliability and Safety Engineering 8:4, pages 347-355.
Crossref
W.L. Pearn, Y.T. Tai, Yu-Wen Wu & Yuan-An Wang. (2018) Power analysis for group supplier selection with multiple production lines. Quality and Reliability Engineering International 34:8, pages 1530-1543.
Crossref
Mou-Yuan Liao & Hsiao-Chi Ling. (2018) Effective Control Chart for Monitoring the Capability Stability of Non-Normal Processes Having S-Type Quality. Journal of Testing and Evaluation 46:3, pages 20160566.
Crossref
Amy H. I. Lee, Chien-Wei Wu & Yen-Wen Chen. (2015) A modified variables repetitive group sampling plan with the consideration of preceding lots information. Annals of Operations Research 238:1-2, pages 355-373.
Crossref
Y. J. Lan & C. J. Lin. (2015) Process selection based on overall process yield. Process selection based on overall process yield.
Chen-ju Lin & Hsin-hui Kuo. (2014) Multiple Comparisons with the Best for Supplier Selection. Quality and Reliability Engineering International 30:7, pages 1083-1092.
Crossref
W. L. PearnY. T. TaiC. Y. Wang. (2012) An Effective Powerful Test for Supplier Selection Evaluation with Multiple Characteristics. Journal of Testing and Evaluation 40:4, pages 104660.
Crossref
W. L. PearnC. H. Wu. (2012) Implementation of Evaluating Process Capability Index C pk for Processes with Multiple Characteristics . Journal of Testing and Evaluation 40:4, pages 104414.
Crossref
Chien-Wei Wu & Mou-Yuan Liao. (2012) Generalized Inference for Measuring Process Yield With the Contamination of Measurement Errors—Quality Control for Silicon Wafer Manufacturing Processes in the Semiconductor Industry. IEEE Transactions on Semiconductor Manufacturing 25:2, pages 272-283.
Crossref
M. R. Mitchell, R. E. Link, Y. T. Tai, W. L. Pearn & S. K. You. (2011) An Effective Test for Supplier Selection Evaluation with Multiple Characteristics. Journal of Testing and Evaluation 39:6, pages 103937.
Crossref
M. R. Mitchell, R. E. Link, W. L. Pearn, H. N. Hung, Y. T. Tai & H. H. Hou. (2011) Process Capability Evaluation for Square Bumps with Mean Shift. Journal of Testing and Evaluation 39:5, pages 103641.
Crossref
M. R. Mitchell, R. E. Link, W. L. Pearn, Mou-Yuan Liao, Chien-Wei Wu & Yao-Tsung Chu. (2011) Two Tests for Supplier Selection Based on Process Yield. Journal of Testing and Evaluation 39:2, pages 103069.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.