459
Views
36
CrossRef citations to date
0
Altmetric
Original Articles

Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines

&
Pages 2565-2585 | Received 12 Nov 2006, Accepted 25 Sep 2007, Published online: 23 Mar 2009

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

Mengxing Gao, ChenGuang Liu, Zigui Liu & Xi Chen. (2023) A tabu search algorithm for the unrelated parallel machine scheduling problem with varied carbon emission constraints in different time intervals. Journal of the Operational Research Society 0:0, pages 1-15.
Read now
Jens Rocholl & Lars Mönch. (2021) Decomposition heuristics for parallel-machine multiple orders per job scheduling problems with a common due date. Journal of the Operational Research Society 72:8, pages 1737-1753.
Read now
Xiaoqing Xu, Jun Lin & Wentian Cui. (2014) Hedge against total flow time uncertainty of the uniform parallel machine scheduling problem with interval data. International Journal of Production Research 52:19, pages 5611-5625.
Read now
Xiaoqing Xu, Wentian Cui, Jun Lin & Yanjun Qian. (2013) Robust makespan minimisation in identical parallel machine scheduling problem with interval data. International Journal of Production Research 51:12, pages 3532-3548.
Read now
JonathanF. Bard, Zhufeng Gao, Rodolfo Chacon & John Stuber. (2012) Real-time decision support for assembly and test operations in semiconductor manufacturing. IIE Transactions 44:12, pages 1083-1099.
Read now
Lin Danping & Carman K.M. Lee. (2011) A review of the research methodology for the re-entrant scheduling problem. International Journal of Production Research 49:8, pages 2221-2242.
Read now
L Mönch, J Zimmermann, S J Mason & J W Fowler. (2011) Multiple orders per job formation and release strategies in large-scale wafer fabs: a simulation study. Journal of Simulation 5:1, pages 25-43.
Read now
Cheng-Hsiang Liu. (2010) A genetic algorithm based approach for scheduling of jobs containing multiple orders in a three-machine flowshop. International Journal of Production Research 48:15, pages 4379-4396.
Read now

Articles from other publishers (28)

Jianxin Fang, Brenda Cheang & Andrew Lim. (2023) Problems and Solution Methods of Machine Scheduling in Semiconductor Manufacturing Operations: A Survey. Sustainability 15:17, pages 13012.
Crossref
Haibo Wang, Shigang Chen, Md Sami Ul Islam Sami, Fahim Rahman & Mark Tehranipoor. 2021. Emerging Topics in Hardware Security. Emerging Topics in Hardware Security 27 59 .
Shaojun Lu, Jun Pei, Xinbao Liu, Xiaofei Qian, Nenad Mladenovic & Panos M. Pardalos. (2019) Less is more: variable neighborhood search for integrated production and assembly in smart manufacturing. Journal of Scheduling 23:6, pages 649-664.
Crossref
Fatma Gzara, Samir Elhedhli, Ugur Yildiz & Gohram Baloch. (2020) Data-Driven Modeling and Optimization of the Order Consolidation Problem in E-Warehousing. INFORMS Journal on Optimization 2:4, pages 273-296.
Crossref
Jens Rocholl & Lars Mönch. (2018) Hybrid algorithms for the earliness–tardiness single-machine multiple orders per job scheduling problem with a common due date. RAIRO - Operations Research 52:4-5, pages 1329-1350.
Crossref
Absalom E. Ezugwu, Olawale J. Adeleke & Serestina Viriri. (2018) Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times. PLOS ONE 13:7, pages e0200030.
Crossref
Adil Baykasoğlu & Fehmi B. Ozsoydan. (2018) Dynamic scheduling of parallel heat treatment furnaces: A case study at a manufacturing system. Journal of Manufacturing Systems 46, pages 152-162.
Crossref
Yong H. Chung, Sang C. Park, Byung H. Kim & Jeong C. Seo. (2015) Reservation based dispatching rule for wafer FAB with engineering lots. Reservation based dispatching rule for wafer FAB with engineering lots.
Oleh Sobeyko & Lars Mönch. (2015) Grouping genetic algorithms for solving single machine multiple orders per job scheduling problems. Annals of Operations Research 235:1, pages 709-739.
Crossref
Yael Perlman, Elad Crispil & Adar Kalir. (2015) Production Planning and WIP Assignment for Wafer Fabrication Tools With Availability Constraints. IEEE Transactions on Semiconductor Manufacturing 28:3, pages 385-392.
Crossref
Yanting Ni & Yi Wang. (2015) A double decoupling postponement approach for integrated mixed flow production systems. Kybernetes 44:5, pages 705-720.
Crossref
A. Costa. (2015) Hybrid genetic optimization for solving the batch-scheduling problem in a pharmaceutical industry. Computers & Industrial Engineering 79, pages 130-147.
Crossref
Yanting Ni, Yuchen Li, Jin Yao & Jingmin Li. (2014) Development of an integrated real time dispatching system. Journal of Manufacturing Technology Management 25:7, pages 980-997.
Crossref
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 247 266 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 207 246 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 177 205 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 105 175 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 65 104 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 29 64 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 11 28 .
Lars Mönch, John W. Fowler & Scott J. MasonLars Mönch, John W. Fowler & Scott J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities. Production Planning and Control for Semiconductor Wafer Fabrication Facilities 1 10 .
Subhash C. Sarin, Lixin Wang & Ming Cheng. (2012) A single-machine, single-wafer-processing, multiple-lots-per-carrier scheduling problem to minimize the sum of lot completion times. Computers & Operations Research 39:7, pages 1411-1418.
Crossref
June-Young Bang, Yeong-Dae Kim & Seong-Woo Choi. (2012) Multiproduct Lot Merging–Splitting Algorithms for Semiconductor Wafer Fabrication. IEEE Transactions on Semiconductor Manufacturing 25:2, pages 200-210.
Crossref
Taeho Park, Taehyung Lee & Chang Ouk Kim. (2011) Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times. The International Journal of Advanced Manufacturing Technology 59:1-4, pages 325-333.
Crossref
Lars Mönch, John W. Fowler, Stéphane Dauzère-Pérès, Scott J. Mason & Oliver Rose. (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. Journal of Scheduling 14:6, pages 583-599.
Crossref
Zhengcai Cao, Yazhen Peng & Yongji Wang. (2011) A drum-buffer-rope based scheduling method for semiconductor manufacturing system. A drum-buffer-rope based scheduling method for semiconductor manufacturing system.
Scott J. Mason & Jen-Shiang Chen. (2010) Scheduling multiple orders per job in a single machine to minimize total completion time. European Journal of Operational Research 207:1, pages 70-77.
Crossref
Jen-Shiang Chen. (2010) Optimization models for the flow-shop scheduling problem with multiple orders per job. Optimization models for the flow-shop scheduling problem with multiple orders per job.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.