225
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness

&
Pages 5717-5738 | Received 30 Nov 2007, Accepted 10 Mar 2008, Published online: 24 Jul 2009

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (7)

Bruno de Athayde Prata & Marcelo Seido Nagano. (2023) A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness. Engineering Optimization 55:12, pages 2070-2083.
Read now
Honghan Ye, Wei Li & Barrie R. Nault. (2020) Trade-off balancing between maximum and total completion times for no-wait flow shop production. International Journal of Production Research 58:11, pages 3235-3251.
Read now
M. Rabiee, F. Jolai, H. Asefi, P. Fattahi & S. Lim. (2016) A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness. International Journal of Computer Integrated Manufacturing 29:9, pages 1007-1024.
Read now
Payman Jula & Ishai Kones. (2013) Continuous-time algorithms for scheduling a single machine with sequence-dependent setup times and time window constraints in coordinated chains. International Journal of Production Research 51:12, pages 3654-3670.
Read now
M. Rabiee, M. Zandieh & A. Jafarian. (2012) Scheduling of a no-wait two-machine flow shop with sequence-dependent setup times and probable rework using robust meta-heuristics. International Journal of Production Research 50:24, pages 7428-7446.
Read now
Hamed Samarghandi & Tarek Y. ElMekkawy. (2012) A meta-heuristic approach for solving the no-wait flow-shop problem. International Journal of Production Research 50:24, pages 7313-7326.
Read now
Payman Jula & Arash Rafiey. (2012) Coordinated scheduling of a single machine with sequence-dependent setup times and time-window constraints. International Journal of Production Research 50:8, pages 2304-2320.
Read now

Articles from other publishers (22)

Dana Marsetiya Utama, Sabila Zahra Umamy & Cynthia Novel Al-Imron. (2024) No-Wait Flow Shop scheduling problem: a systematic literature review and bibliometric analysis. RAIRO - Operations Research 58:2, pages 1281-1313.
Crossref
Bruno A. Prata, Levi R. Abreu & Marcelo S. Nagano. (2024) A reactive iterated greedy algorithm for the no-wait flowshop to minimize total tardiness. Journal of Industrial and Management Optimization 0:0, pages 0-0.
Crossref
Bruno de Athayde Prata & Helio Yochihiro Fuchigami. (2023) A genetic iterated greedy algorithm for the blocking flowshop to minimize total earliness and tardiness. Journal of Intelligent Manufacturing.
Crossref
Mário Tonizza Pereira & Marcelo Seido Nagano. (2022) Hybrid metaheuristics for the integrated and detailed scheduling of production and delivery operations in no-wait flow shop systems. Computers & Industrial Engineering 170, pages 108255.
Crossref
ZiYan Zhao, MengChu Zhou & ShiXin Liu. (2022) Iterated Greedy Algorithms for Flow-Shop Scheduling Problems: A Tutorial. IEEE Transactions on Automation Science and Engineering 19:3, pages 1941-1959.
Crossref
Houda Harbaoui & Soulef Khalfallah. (2022) An Effective Optimization Approach to Minimize Waste in a Complex Industrial System. IEEE Access 10, pages 13997-14012.
Crossref
Haihong Zhu, Ning Luo & Xiaoping Li. (2021) A quantum‐inspired cuckoo co‐evolutionary algorithm for no‐wait flow shop scheduling. IET Collaborative Intelligent Manufacturing 3:2, pages 105-118.
Crossref
Houda Harbaoui & Soulef Khalfallah. (2020) Tabu-search optimization approach for no-wait hybrid flow-shop scheduling with dedicated machines. Procedia Computer Science 176, pages 706-712.
Crossref
Ali Allahverdi, Harun Aydilek & Asiye Aydilek. (2020) No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan. Applied Mathematics and Computation 365, pages 124688.
Crossref
Meenakshi Sharma, Manisha Sharma & Sameer Sharma. 2020. Soft Computing for Problem Solving 2019. Soft Computing for Problem Solving 2019 121 135 .
Haihong Zhu, Xuemei Qi, Fulong Chen, Xin He, Linfeng Chen & Ziyang Zhang. (2018) Quantum-inspired cuckoo co-search algorithm for no-wait flow shop scheduling. Applied Intelligence 49:2, pages 791-803.
Crossref
Ali Allahverdi, Harun Aydilek & Asiye Aydilek. (2018) No-wait flowshop scheduling problem with two criteria; total tardiness and makespan. European Journal of Operational Research 269:2, pages 590-601.
Crossref
Ali Allahverdi. (2016) A survey of scheduling problems with no-wait in process. European Journal of Operational Research 255:3, pages 665-686.
Crossref
Ali Allahverdi & Harun Aydilek. (2014) Total completion time with makespan constraint in no-wait flowshops with setup times. European Journal of Operational Research 238:3, pages 724-734.
Crossref
H. Asefi, F. Jolai, M. Rabiee & M. E. Tayebi Araghi. (2014) A hybrid NSGA-II and VNS for solving a bi-objective no-wait flexible flowshop scheduling problem. The International Journal of Advanced Manufacturing Technology 75:5-8, pages 1017-1033.
Crossref
Zhenhao Xu, Shun Zhang & Xingsheng Gu. 2014. Advances in Computer Science and its Applications. Advances in Computer Science and its Applications 811 817 .
Kaizhou Gao, Quanke Pan, P. N. Suganthan & Junqing Li. (2012) Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization. The International Journal of Advanced Manufacturing Technology 66:9-12, pages 1563-1572.
Crossref
K. Z. Gao, P.N. Suganthan & T. J. Chua. (2013) An enhanced migrating birds optimization algorithm for no-wait flow shop scheduling problem. An enhanced migrating birds optimization algorithm for no-wait flow shop scheduling problem.
King-Wah Pang. (2013) A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness. International Journal of Production Economics 141:1, pages 127-136.
Crossref
Shanthi Muthuswamy, Mario C. Vélez-Gallego, Jairo Maya & Miguel Rojas-Santiago. (2012) Minimizing makespan in a two-machine no-wait flow shop with batch processing machines. The International Journal of Advanced Manufacturing Technology 63:1-4, pages 281-290.
Crossref
Gao Kaizhou, P.N. Suganthan & Bao Zhenqiang. (2012) A composite heuristic for the no-wait flow shop scheduling. A composite heuristic for the no-wait flow shop scheduling.
Chuyang Wang, Xiaoping Li & Qian Wang. (2010) Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion. European Journal of Operational Research 206:1, pages 64-72.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.