423
Views
79
CrossRef citations to date
0
Altmetric
Original Articles

Modeling and numerical analysis of line-cell conversion problems

, , &
Pages 2055-2078 | Received 15 Feb 2008, Accepted 12 Jun 2008, Published online: 27 Feb 2009

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (13)

Yuhong Ren, Jiafu Tang, Yang Yu & Xiaolong Li. (2024) A two-stage stochastic programming model and parallel Master–Slave adaptive GA for flexible Seru system formation. International Journal of Production Research 62:4, pages 1144-1161.
Read now
Qiqi Miao, Zhaoyang Bai, Xiaobing Liu & Muhammad Awais. (2023) Modelling and numerical analysis for seru system balancing with lot splitting. International Journal of Production Research 61:21, pages 7410-7433.
Read now
Zhe Zhang, Xiaoling Song, Xue Gong, Yong Yin, Benjamin Lev & Xiaoyang Zhou. (2023) An effective heuristic based on 3-opt strategy for seru scheduling problems with learning effect. International Journal of Production Research 61:6, pages 1938-1954.
Read now
Zhe Zhang, Xue Gong, Xiaoling Song, Yong Yin, Benjamin Lev & Xiaoyang Zhou. (2023) A nonanticipatory policy for stochastic seru scheduling problems. Journal of the Operational Research Society 0:0, pages 1-12.
Read now
Zixuan Yu, Wei Sun & Min Huang. (2022) Exact Methods for Multi-Objective Integer Nonlinear Programming. Cybernetics and Systems 0:0, pages 1-34.
Read now
Yujing Jiang, Zhe Zhang, Xiaoling Song & Yong Yin. (2022) Scheduling controllable processing time jobs in seru production system with resource allocation. Journal of the Operational Research Society 73:11, pages 2551-2571.
Read now
Wei Sun, Yang Yu, Qi Lou, Junwei Wang & Yuechao Guan. (2020) Reducing the total tardiness by Seru production: model, exact and cooperative coevolution solutions. International Journal of Production Research 58:21, pages 6441-6452.
Read now
Ömer Faruk Yılmaz. (2020) Operational strategies for seru production system: a bi-objective optimisation model and solution methods. International Journal of Production Research 58:11, pages 3195-3219.
Read now
Yang Yu, Wei Sun, Jiafu Tang, Ikou Kaku & Junwei Wang. (2017) Line-seru conversion towards reducing worker(s) without increasing makespan: models, exact and meta-heuristic solutions. International Journal of Production Research 55:10, pages 2990-3007.
Read now
Kuo-Ching Ying & Yi-Ju Tsai. (2017) Minimising total cost for training and assigning multiskilled workers in seru production systems. International Journal of Production Research 55:10, pages 2978-2989.
Read now
Yang Yu, Jiafu Tang, Wei Sun, Yong Yin & Ikou Kaku. (2013) Combining local search into non-dominated sorting for multi-objective line-cell conversion problem. International Journal of Computer Integrated Manufacturing 26:4, pages 316-326.
Read now
Yang Yu, Jun Gong, Jiafu Tang, Yong Yin & Ikou Kaku. (2012) How to carry out assembly line–cell conversion? A discussion based on factor analysis of system performance improvements. International Journal of Production Research 50:18, pages 5259-5280.
Read now
Jun Gong, Vittaldas V. Prabhu & Wenxin Liu. (2011) Simulation-based performance comparison between assembly lines and assembly cells with real-time distributed arrival time control system. International Journal of Production Research 49:5, pages 1241-1253.
Read now

Articles from other publishers (66)

Yinghui Wu, Shaoyu Zeng, Bingbing Li & Yang Yu. (2024) A bi-objective approach for the multi-skilled worker assignment of a hybrid assembly line-seru production system. RAIRO - Operations Research 58:2, pages 1187-1206.
Crossref
Zhe Zhang, Kazuhiro Izui, Xiaoling Song, Yong Yin & Xue Gong. (2024) A nested partitioning-based solution method for seru scheduling problem with resource allocation. Journal of Management Science and Engineering 9:1, pages 101-114.
Crossref
Xiaolong Li, Zhecong Zhang, Wei Sun, Yang Liu & Jiafu Tang. (2024) Parallel dynamic NSGA-II with multi-population search for rescheduling of Seru production considering schedule changes under different dynamic events. Expert Systems with Applications 238, pages 121993.
Crossref
Xiaolong Li, Yang Yu, Wei Sun & Jiafu Tang. (2023) Reducing tardy batches by seru production: Model, exact solution, cooperative coevolution solution, and insights. Computers & Operations Research 160, pages 106048.
Crossref
Beren Gürsoy Yılmaz, Ömer Faruk Yılmaz & Emre Çevikcan. (2023) Lot streaming in workforce scheduling problem for seru production system under Shojinka philosophy. Computers & Industrial Engineering 185, pages 109680.
Crossref
Shaoyu Zeng, Yinghui Wu & Yang Yu. (2022) Multi-skilled worker assignment in seru production system for the trade-off between production efficiency and workload fairness . Kybernetes 52:9, pages 3495-3518.
Crossref
Lili Wang, Zhe Zhang & Yong Yin. (2023) A bi-level nested heuristic algorithm for divisional seru order acceptance and scheduling problems. Applied Soft Computing 143, pages 110354.
Crossref
Xiaohong Zhang, Zhe Zhang, Xue Gong & Yong Yin. (2023) An exact branch-and-bound algorithm for seru scheduling problems with sequence-dependent setup time. Soft Computing 27:10, pages 6415-6436.
Crossref
Marco Bortolini. (2023) Analytic model to predict productivity in divisional Seru production environment. Computers & Industrial Engineering 177, pages 109058.
Crossref
Takayuki Kataoka. 2023. Manufacturing Driving Circular Economy. Manufacturing Driving Circular Economy 349 356 .
Ye Wang & Jiafu Tang. (2020) Optimized skill configuration for the seru production system under an uncertain demand. Annals of Operations Research 316:1, pages 445-465.
Crossref
Yuhong Ren & Jiafu Tang. (2022) Flexibility of Seru Production System: An Input-Process-Output System View. Flexibility of Seru Production System: An Input-Process-Output System View.
Yujing Jiang, Zhe Zhang, Xiaoling Song & Yong Yin. (2022) Seru Scheduling Problems with Multiple Due-Windows Assignment and Learning Effect. Journal of Systems Science and Systems Engineering 31:4, pages 480-511.
Crossref
Hongying Shan, Mengyao Qin, Cungang Zou, Peiyang Peng & Zunyan Meng. (2022) Assembly line-Seru conversion in the C2M enterprise: an empirical study in China. Assembly Automation 42:4, pages 506-520.
Crossref
Zhe Zhang, Xiaoling Song, Huijun Huang, Yong Yin & Benjamin Lev. (2022) Scheduling problem in seru production system considering DeJong’s learning effect and job splitting. Annals of Operations Research 312:2, pages 1119-1141.
Crossref
Zhe Zhang, Xue Gong, Xiaoling Song, Yong Yin, Benjamin Lev & Jie Chen. (2022) A column generation-based exact solution method for seru scheduling problems. Omega 108, pages 102581.
Crossref
Xiaolong Li, Yang Yu & Min Huang. (2022) Multi-objective cooperative coevolution algorithm with a Master–Slave mechanism for Seru Production. Applied Soft Computing 119, pages 108593.
Crossref
Feng Liu, Kan Fang, Jiafu Tang & Yong Yin. (2022) Solving the rotating seru production problem with dynamic multi-objective evolutionary algorithms. Journal of Management Science and Engineering 7:1, pages 48-66.
Crossref
Yin Gai, Yong Yin, Jiafu Tang & Shiqiang Liu. (2022) Minimizing makespan of a production batch within concurrent systems: Seru production perspective. Journal of Management Science and Engineering 7:1, pages 1-18.
Crossref
Zhe Zhang, Xiaoling Song, Huijung Huang, Xiaoyang Zhou & Yong Yin. (2022) Logic-based Benders decomposition method for the seru scheduling problem with sequence-dependent setup time and DeJong’s learning effect. European Journal of Operational Research 297:3, pages 866-877.
Crossref
Ahad FURUGİ & Melis HALİLOĞLU. (2022) Seru üretim sisteminde hat-seru dönüşümü ve çizelgeleme problemi için matematiksel model önerisiA mathematical model for line-seru conversion and scheduling problem in seru production system. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi 37:3, pages 1213-1224.
Crossref
Marco Bortolini & Francesco Gabriele Galizia. 2022. Towards Sustainable Customization: Bridging Smart Products and Manufacturing Systems. Towards Sustainable Customization: Bridging Smart Products and Manufacturing Systems 584 591 .
Feng Liu, Ben Niu, Muze Xing, Lang Wu & Yuanyue Feng. (2021) Optimal cross-trained worker assignment for a hybrid seru production system to minimize makespan and workload imbalance. Computers & Industrial Engineering 160, pages 107552.
Crossref
Yuting Wu, Ling Wang & Jing-fang Chen. (2021) A cooperative coevolution algorithm for complex hybrid seru-system scheduling optimization. Complex & Intelligent Systems 7:5, pages 2559-2576.
Crossref
Ashkan Ayough, Farbod Farhadi & Mostafa Zandieh. (2021) The job rotation scheduling problem considering human cognitive effects: an integrated approach. Assembly Automation 41:2, pages 221-236.
Crossref
Emre ÇALIŞKAN, Selçuk Kürşat İŞLEYEN & Hakan ÇERÇİOĞLU. (2021) Seru üretim sistemlerinde yükleme problemi için karışık tamsayılı bir matematiksel model ve mat-sezgisel çözüm yaklaşımıA Mixed Integer Mathematical Model for Loading Problem in Seru Manufacturing Systems and Matheuristic Solution Approach. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi 36:2, pages 793-806.
Crossref
Adem TÜZEMEN. (2020) YENİ BİR ÜRETİM SİSTEMİ: SERU. Cumhuriyet Üniversitesi İktisadi ve İdari Bilimler Dergisi 21:2, pages 334-351.
Crossref
Ömer Faruk Yılmaz. (2020) Attaining flexibility in seru production system by means of Shojinka: An optimization model and solution approaches. Computers & Operations Research 119, pages 104917.
Crossref
Ashkan Ayough, Mohammad Hosseinzadeh & Alireza Motameni. (2020) Job rotation scheduling in the Seru system: shake enforced invasive weed optimization approach. Assembly Automation 40:3, pages 461-474.
Crossref
Takayuki Kataoka. (2020) A multi-period mixed integer programming model on reconfigurable manufacturing cells. Procedia Manufacturing 43, pages 231-238.
Crossref
Yang Yu & Jiafu Tang. (2019) Review of seru production. Frontiers of Engineering Management 6:2, pages 183-192.
Crossref
Hui Ren & Dongyu Wang. (2019) Analysis of the Effect of the Line- Seru Conversion on the Waiting Time with Batch Arrival . Mathematical Problems in Engineering 2019, pages 1-13.
Crossref
Ponnusamy Venkumar. 2019. Industry 4.0 and Hyper-Customized Smart Manufacturing Supply Chains. Industry 4.0 and Hyper-Customized Smart Manufacturing Supply Chains 263 293 .
Wei Sun, Yuting Wu, Qi Lou & Yang Yu. (2019) A Cooperative Coevolution Algorithm for the <italic>Seru</italic> Production With Minimizing Makespan. IEEE Access 7, pages 5662-5670.
Crossref
Ikou Kaku. (2019) A Novel S-F Seru Production Scheme. Procedia Manufacturing 39, pages 1082-1089.
Crossref
Gürsel Süer, Berna Ulutas, Ikou Kaku & Yong Yin. (2019) Considering Product Life Cycle Stages and Worker Skill Level in Seru Production Systems. Procedia Manufacturing 39, pages 1097-1103.
Crossref
Xinzi Han, Zhe Zhang & Yong Yin. (2018) Reliability Analysis for a Divisional Seru Production System with Stochastic Capacity. Reliability Analysis for a Divisional Seru Production System with Stochastic Capacity.
Cem Savas Aydin, Senim Ozgurler, Mehmet Bulent Durmusoglu & Mesut Ozgurler. (2018) Response surface approach to robust design of assembly cells through simulation. Assembly Automation 38:4, pages 450-464.
Crossref
Lang Wu, Felix T.S. Chan, Ben Niu & Li Li. (2018) Cross-trained worker assignment and comparative analysis on throughput of divisional and rotating seru. Industrial Management & Data Systems 118:5, pages 1114-1136.
Crossref
Yang Yu, Junwei Wang, Ke Ma & Wei Sun. (2018) Seru system balancing: Definition, formulation, and exact solution. Computers & Industrial Engineering 122, pages 318-325.
Crossref
Ye Wang & Jiafu Tang. (2018) Cost and Service-Level-Based Model for a Seru Production System Formation Problem with Uncertain Demand. Journal of Systems Science and Systems Engineering 27:4, pages 519-537.
Crossref
Wang Ye & Tang Jiafu. (2018) Is full skill the best configuration for seru production system?. Is full skill the best configuration for seru production system?.
Aaya Aboelfotoh & Gürsel A Süer Md Abdullah. (2018) Selection of Assembly Systems; Assembly Lines vs. Seru Systems. Procedia Computer Science 140, pages 351-358.
Crossref
Ye Wang & Jiafu Tang. (2017) Multi-objective optimization model for seru production system formation under uncertain condition. Multi-objective optimization model for seru production system formation under uncertain condition.
Ikou Kaku. (2017) Is Seru a Sustainable Manufacturing System?. Procedia Manufacturing 8, pages 723-730.
Crossref
XiaoLi Zhang, ChenGuang Liu, WenJuan Li, Steve Evans & Yong Yin. (2017) Effects of key enabling technologies for seru production on sustainable performance. Omega 66, pages 290-307.
Crossref
Yang Yu, Wei Sun, Jiafu Tang & Junwei Wang. (2017) Line-hybrid seru system conversion: Models, complexities, properties, solutions and insights. Computers & Industrial Engineering 103, pages 282-299.
Crossref
Yang Yu, Sihan Wang, Jiafu Tang, Ikou Kaku & Wei Sun. (2016) Complexity of line-seru conversion for different scheduling rules and two improved exact algorithms for the multi-objective optimization. SpringerPlus 5:1.
Crossref
Jiafu Tang, Chengkuan Zeng & Zhendong Pan. (2016) Auction-based cooperation mechanism to parts scheduling for flexible job shop with inter-cells. Applied Soft Computing 49, pages 590-602.
Crossref
Wei Sun, Qianqian Li, Chunhui Huo, Yang Yu & Ke Ma. (2016) Formulations, Features of Solution Space, and Algorithms for Line-Pure Seru System Conversion . Mathematical Problems in Engineering 2016, pages 1-14.
Crossref
Ikou Kaku. (2016) A Fundamental Positive Investigation into Japanese Seru Production Systems. IFAC-PapersOnLine 49:12, pages 337-342.
Crossref
ChenGuang Liu, Fen Dang, WenJuan Li, Jie Lian, Steve Evans & Yong Yin. (2015) Production planning of multi-stage multi-option seru production systems with sustainable measures. Journal of Cleaner Production 105, pages 285-299.
Crossref
Chengkuan Zeng, Jiafu Tang & Chongjun Yan. (2014) Job-shop cell-scheduling problem with inter-cell moves and automated guided vehicles. Journal of Intelligent Manufacturing 26:5, pages 845-859.
Crossref
V. K. Manupati, T. Vemkata Deepthi, K. Ramakotaiah & S. S. Rao. (2015) Reconfiguration of Networked seru production systems in an Indian Perspective. Reconfiguration of Networked seru production systems in an Indian Perspective.
Jiafu Tang, Chongjun Yan, Xiaoqing Wang & Chengkuan Zeng. (2014) Using Lagrangian Relaxation Decomposition With Heuristic to Integrate the Decisions of Cell Formation and Parts Scheduling Considering Intercell Moves. IEEE Transactions on Automation Science and Engineering 11:4, pages 1110-1121.
Crossref
Yang Yu, Jiafu Tang, Jun Gong, Yong Yin & Ikou Kaku. (2014) Mathematical analysis and solutions for multi-objective line-cell conversion problem. European Journal of Operational Research 236:2, pages 774-786.
Crossref
ChenGuang Liu, Kathryn E. Stecke, Jie Lian & Yong Yin. (2013) An implementation framework for seru production . International Transactions in Operational Research 21:1, pages 1-19.
Crossref
ChenGuang Liu, Na Yang, WenJuan Li, Jie Lian, Steve Evans & Yong Yin. (2013) Training and assignment of multi-skilled workers for implementing seru production systems. The International Journal of Advanced Manufacturing Technology 69:5-8, pages 937-959.
Crossref
Yang Yu, Jiafu Tang, Wei Sun, Yong Yin & Ikou Kaku. (2013) Reducing worker(s) by converting assembly line into a pure cell system. International Journal of Production Economics 145:2, pages 799-806.
Crossref
ChenGuang Liu, WenJuan Li, Jie Lian & Yong Yin. (2012) Reconfiguration of assembly systems: From conveyor assembly line to serus. Journal of Manufacturing Systems 31:3, pages 312-325.
Crossref
Chen-Guang Liu, Wen-juan Li, Jie Lian, Yu-fang Bai & Yong Yin. (2011) A mathematical model for reconstructing the conventional assembly system. A mathematical model for reconstructing the conventional assembly system.
J. Rezaeian, N. Javadian, R. Tavakkoli-Moghaddam & F. Jolai. (2011) A hybrid approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system. Applied Soft Computing 11:6, pages 4195-4202.
Crossref
Bin Gao, Jun Gong, Qian Li & Jiafu Tang. (2011) The design of real-time distributed arrival time control system in a cell manufacturing. The design of real-time distributed arrival time control system in a cell manufacturing.
Jun Gong, Jiafu Tang & Qian Li. (2010) Performance of real-time distributed arrival time control in assembly cell manufacturing systems. Performance of real-time distributed arrival time control in assembly cell manufacturing systems.
Jun Gong, Wenxin Liu, Xilin Liu & Tianxiang Cui. (2010) A simulation-based performance comparison between multi-model assembly lines and assembly cells in a just-in-time environment. A simulation-based performance comparison between multi-model assembly lines and assembly cells in a just-in-time environment.
Xiaolong Li, yang yu & Jiafu Tang. (2022) Reducing Tardy Batches by Seru Production: Model, Exact Solution, Cooperative Coevolution Solution, and Insights. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.