132
Views
12
CrossRef citations to date
0
Altmetric
Original Articles

Permutation flow shops with exact time lags to minimise maximum lateness

, , &
Pages 6759-6775 | Received 06 Sep 2007, Accepted 21 Feb 2008, Published online: 13 Oct 2009

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

Jonas Mayer & Peter Nyhuis. (2017) Describing the influence of set-up optimised sequencing on output lateness of workstations. Production Planning & Control 28:10, pages 791-801.
Read now

Articles from other publishers (11)

Caio Paziani Tomazella & Marcelo Seido Nagano. (2020) A comprehensive review of Branch-and-Bound algorithms: Guidelines and directions for further research on the flowshop scheduling problem. Expert Systems with Applications 158, pages 113556.
Crossref
Mostafa Khatami, Amir Salehipour & T.C.E. Cheng. (2020) Coupled task scheduling with exact delays: Literature review and models. European Journal of Operational Research 282:1, pages 19-39.
Crossref
Andreas Hipp & Victor Fernandez-Viagas. (2019) Influence of no-wait and time lag constraints in flowshop scheduling systems. Influence of no-wait and time lag constraints in flowshop scheduling systems.
Bailin Wang, Kai Huang & Tieke Li. (2018) Permutation flowshop scheduling with time lag constraints and makespan criterion. Computers & Industrial Engineering 120, pages 1-14.
Crossref
Florian T. Hecker, Marc Stanke, Thomas Becker & Bernd Hitzmann. (2014) Application of a modified GA, ACO and a random search procedure to solve the production scheduling of a case study bakery. Expert Systems with Applications 41:13, pages 5882-5891.
Crossref
S.S. Panwalkar & Christos Koulamas. (2014) The two-machine no-wait general and proportionate open shop makespan problem. European Journal of Operational Research 238:2, pages 471-475.
Crossref
Anis Gharbi, Talel Ladhari, Mohamed Kais Msakni & Mehdi Serairi. (2013) The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies. European Journal of Operational Research 231:1, pages 69-78.
Crossref
Emna Dhouib, Jacques Teghem, Daniel Tuyttens & Taïcir Loukil. 2013. Metaheuristics for Production Scheduling. Metaheuristics for Production Scheduling 69 96 .
E. Dhouib, J. Teghem & T. Loukil. (2013) Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints. International Transactions in Operational Research 20:2, pages 213-232.
Crossref
Bertrand M.T. Lin, Y.-Y. Lin & K.-T. Fang. (2013) Two-machine flow shop scheduling of polyurethane foam production. International Journal of Production Economics 141:1, pages 286-294.
Crossref
Mostafa Khatami, Amir Salehipour & T.C.E. Cheng. (2018) Coupled Task Scheduling With Exact Delays: Literature Review and Models. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.