580
Views
39
CrossRef citations to date
0
Altmetric
Research Articles

Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups

&
Pages 861-878 | Received 28 Feb 2008, Accepted 12 Aug 2008, Published online: 28 Nov 2008

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Maryam Darvish, Homero Larrain & Leandro C. Coelho. (2016) A dynamic multi-plant lot-sizing and distribution problem. International Journal of Production Research 54:22, pages 6707-6717.
Read now
Manuel Díaz-Madroñero, Josefa Mula & David Peidro. (2014) A review of discrete-time optimization models for tactical production planning. International Journal of Production Research 52:17, pages 5171-5205.
Read now
M. Rabiee, M. Zandieh & A. Jafarian. (2012) Scheduling of a no-wait two-machine flow shop with sequence-dependent setup times and probable rework using robust meta-heuristics. International Journal of Production Research 50:24, pages 7428-7446.
Read now
Tao Wu & Leyuan Shi. (2011) Mathematical models for capacitated multi-level production planning problems with linked lot sizes. International Journal of Production Research 49:20, pages 6227-6247.
Read now
Erwin Hans & Steef van de Velde. (2011) The lot sizing and scheduling of sand casting operations. International Journal of Production Research 49:9, pages 2481-2499.
Read now

Articles from other publishers (34)

Seyda Topaloglu Yildiz, Sel Ozcan & Neslihan Cevik. (2023) Variable neighborhood search-based algorithms for the parallel machine capacitated lot-sizing and scheduling problem. Journal of Engineering Research, pages 100145.
Crossref
Dražen Popović, Nenad Bjelić, Milorad Vidović & Branislava Ratković. (2023) Solving a Production Lot-Sizing and Scheduling Problem from an Enhanced Inventory Management Perspective. Mathematics 11:9, pages 2099.
Crossref
Abdolreza Roshani, Massimo Paolucci, Davide Giglio, Melissa Demartini, Flavio Tonelli & Maxim A. Dulebenets. (2022) The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network. Annals of Operations Research 321:1-2, pages 469-505.
Crossref
Thomas Hanne & Rolf DornbergerThomas Hanne & Rolf Dornberger. 2023. Computational Intelligence in Logistik und Supply Chain Management. Computational Intelligence in Logistik und Supply Chain Management 79 105 .
Desiree M. Carvalho & Mariá C.V. Nascimento. (2022) Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup. European Journal of Operational Research 296:1, pages 158-173.
Crossref
D. Pérez-Perales, F. Alarcón, P. Gómez-Gasquet & M. M. E. Alemany. 2022. Ensuring Sustainability. Ensuring Sustainability 119 126 .
Hung-Kai Wang & Lars Mönch. (2021) A matheuristic for making order acceptance decisions in multi-product, multi-stage manufacturing systems. Applied Soft Computing 111, pages 107640.
Crossref
Angelo Sifaleras & Ioannis Konstantaras. 2020. Network Algorithms, Data Mining, and Applications. Network Algorithms, Data Mining, and Applications 71 82 .
Parinaz Vaez, Fatemeh Sabouhi & Mohammad Saeed Jabalameli. (2019) Sustainability in a lot-sizing and scheduling problem with delivery time window and sequence-dependent setup cost consideration. Sustainable Cities and Society 51, pages 101718.
Crossref
Yenny Suzana, Herman Mawengkang, Marwan Ramli & Opim Salim Sitompul. (2019) Optimizing Lot Size of Flexible Job Shop Problems by Considering Expiration Aspect. Journal of Physics: Conference Series 1235:1, pages 012067.
Crossref
Sari Abdullah, Abdulrahim Shamayleh & Malick Ndiaye. (2019) Three stage dynamic heuristic for multiple plants capacitated lot sizing with sequence-dependent transient costs. Computers & Industrial Engineering 127, pages 1024-1036.
Crossref
Ravi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra & K. GaneshRavi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra & K. Ganesh. 2019. Capacitated Lot Sizing Problems in Process Industries. Capacitated Lot Sizing Problems in Process Industries 131 182 .
Ravi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra & K. GaneshRavi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra & K. Ganesh. 2019. Capacitated Lot Sizing Problems in Process Industries. Capacitated Lot Sizing Problems in Process Industries 1 31 .
S. Torkaman, S.M.T. Fatemi Ghomi & B. Karimi. (2018) Hybrid simulated annealing and genetic approach for solving a multi-stage production planning with sequence-dependent setups in a closed-loop supply chain. Applied Soft Computing 71, pages 1085-1104.
Crossref
S. Torkaman, S.M.T Fatemi Ghomi & B. Karimi. (2017) Multi-stage multi-product multi-period production planning with sequence-dependent setups in closed-loop supply chain. Computers & Industrial Engineering 113, pages 602-613.
Crossref
Yihua Li & Guiping Hu. (2017) Shop floor lot-sizing and scheduling with a two-stage stochastic programming model considering uncertain demand and workforce efficiency. Computers & Industrial Engineering 111, pages 263-271.
Crossref
Folarin B. Oyebolu, Jeroen van Lidth de Jeude, Cyrus Siganporia, Suzanne S. Farid, Richard Allmendinger & Juergen Branke. (2017) A new lot sizing and scheduling heuristic for multi-site biopharmaceutical production. Journal of Heuristics 23:4, pages 231-256.
Crossref
Ramon Faganello Fachini, Kleber Francisco Esposto & Victor Claudio Bento Camargo. (2016) Glass container production planning with warm-ups and furnace extraction variation losses. The International Journal of Advanced Manufacturing Technology 90:1-4, pages 527-543.
Crossref
Angelo Sifaleras & Ioannis Konstantaras. (2017) Variable neighborhood descent heuristic for solving reverse logistics multi-item dynamic lot-sizing problems. Computers & Operations Research 78, pages 385-392.
Crossref
Reza Ramezanian, Sahar Fallah Sanami & Mohsen Shafiei Nikabadi. (2016) A simultaneous planning of production and scheduling operations in flexible flow shops: case study of tile industry. The International Journal of Advanced Manufacturing Technology 88:9-12, pages 2389-2403.
Crossref
Karina Copil, Martin Wörbelauer, Herbert Meyr & Horst Tempelmeier. (2016) Simultaneous lotsizing and scheduling problems: a classification and review of models. OR Spectrum 39:1, pages 1-64.
Crossref
Thomas Hanne & Rolf DornbergerThomas Hanne & Rolf Dornberger. 2017. Computational Intelligence in Logistics and Supply Chain Management. Computational Intelligence in Logistics and Supply Chain Management 73 97 .
A. Ait Bassou, M. Hlyal & J. El Alami. (2016) Stores Location Model For Distribution Network Design: An Effective Variable neighborhood Search Approach for a Two Level Capacitated Location Allocation Problem. Journal of Applied Sciences 16:2, pages 37-46.
Crossref
Daecheol Kim & Hyun Joon Shin. (2014) A hybrid heuristic approach for production planning in supply chain networks. The International Journal of Advanced Manufacturing Technology 78:1-4, pages 395-406.
Crossref
Mohammad Rohaninejad, Amirsaman Kheirkhah & Parviz Fattahi. (2014) Simultaneous lot-sizing and scheduling in flexible job shop problems. The International Journal of Advanced Manufacturing Technology 78:1-4, pages 1-18.
Crossref
Angelo Sifaleras, Ioannis Konstantaras & Nenad Mladenović. (2015) Variable neighborhood search for the economic lot sizing problem with product returns and recovery. International Journal of Production Economics 160, pages 133-143.
Crossref
Harlem M. M. Villadiego, José Elías C. Arroyo & André Gustavo dos Santos. 2014. Evolutionary Computation in Combinatorial Optimisation. Evolutionary Computation in Combinatorial Optimisation 61 72 .
Tao Wu, Kerem Akartunalı, Jie Song & Leyuan Shi. (2012) Mixed integer programming in production planning with backlogging and setup carryover: modeling and algorithms. Discrete Event Dynamic Systems 23:2, pages 211-239.
Crossref
P. Amorim, T. Pinto-Varela, B. Almada-Lobo & A.P.F.D. Barbósa-Póvoa. (2013) Comparing models for lot-sizing and scheduling of single-stage continuous processes: Operations research and process systems engineering approaches. Computers & Chemical Engineering 52, pages 177-192.
Crossref
F. Seeanner, B. Almada-Lobo & H. Meyr. (2013) Combining the principles of variable neighborhood decomposition search and the fix&optimize heuristic to solve multi-level lot-sizing and scheduling problems. Computers & Operations Research 40:1, pages 303-317.
Crossref
Lorenzo Tiacci & Stefano Saetta. (2012) Demand forecasting, lot sizing and scheduling on a rolling horizon basis. International Journal of Production Economics 140:2, pages 803-814.
Crossref
Tao Wu, Leyuan Shi & Jie Song. (2011) An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times. Annals of Operations Research 196:1, pages 635-650.
Crossref
Ross J.W. James & Bernardo Almada-Lobo. (2011) Single and parallel machine capacitated lotsizing and scheduling: New iterative MIP-based neighborhood search heuristics. Computers & Operations Research 38:12, pages 1816-1825.
Crossref
Ik-Soo Shim, Hyeok-Chol Kim, Hyoung-Ho Doh & Dong-Ho Lee. (2011) A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs. Computers & Industrial Engineering 61:4, pages 920-929.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.