Rui Li, Yali Chen, Jinzhao Song, Ming Li & Yu Yu. (2023) Multi-Objective Optimization Method of Industrial Workshop Layout from the Perspective of Low Carbon. Sustainability 15:16, pages 12275.
Crossref
W.Azzolini Junior, F.G.P. Azzolini, L.R. Mundim, A.J.V. Porto & H.J.S. Amani. (2023) Shipyard facility layout optimization through the implementation of a sequential structure of algorithms. Heliyon 9:6, pages e16714.
Crossref
Li- JiaLin & Alexander A. Hernandez. (2023) Computational Evaluation of Complexity Parameters of Machining and Manufacturing Systems. Computational Evaluation of Complexity Parameters of Machining and Manufacturing Systems.
Qiang Ren, Yaoyao Ku, Yiqing Wang & Peng Wu. (2023) Research on design and optimization of green warehouse system based on case analysis. Journal of Cleaner Production 388, pages 135998.
Crossref
Pablo Pérez-Gosende, Josefa Mula & Manuel Díaz-Madroñero. (2023) A conceptual framework for multi-objective facility layout planning by a bottom-up approach. International Journal of Production Management and Engineering 11:1, pages 1-16.
Crossref
Shengze Duan & Ling Kang. (2022) An Enhanced Multiobjective Double Row Layout Model considering the Machine Breakdowns. Computational Intelligence and Neuroscience 2022, pages 1-14.
Crossref
Thomas Seidelmann & Sanaz Mostaghim. (2022) Finding Cost-Effective Re-Layouting Solutions in Modern Brownfield Facility Layout Planning. Finding Cost-Effective Re-Layouting Solutions in Modern Brownfield Facility Layout Planning.
Jaehyuk Kim & Yoonho Seo. (2022) Integrated Optimization of Facility Layout and Job Shop Scheduling in Reconfigurable Manufacturing System. Journal of the Korean Institute of Industrial Engineers 48:1, pages 63-73.
Crossref
Navaljit Kapoor, Nadeem Ahmad, Subrat Kumar Nayak, Surya Prakash Singh, P. Vigneswara Ilavarasan & Prasanna Ramamoorthy. (2021) Identifying infrastructural gap areas for smart and sustainable tribal village development: A data science approach from India. International Journal of Information Management Data Insights 1:2, pages 100041.
Crossref
Vijaya Dixit, Priyanka Verma & Piyush Raj. (2020) Leveraging tacit knowledge for shipyard facility layout selection using fuzzy set theory. Expert Systems with Applications 158, pages 113423.
Crossref
Akash Tayal & Surya Prakash Singh. (2017) Formulating multi-objective stochastic dynamic facility layout problem for disaster relief. Annals of Operations Research 283:1-2, pages 837-863.
Crossref
Ravi Kumar & Surya Prakash Singh. (2019) Cellular facility layout problem: a case of tower manufacturing industry. Management of Environmental Quality: An International Journal 30:6, pages 1345-1360.
Crossref
Muhittin Sagnak, Erhan Ada & Yigit Kazancoglu. (2019) A new holistic conceptual framework for layout performance assessment. Journal of Manufacturing Technology Management 30:1, pages 233-260.
Crossref
Xujing Zhang, Lichuan Wang & Yan Chen. (2019) Multi-Objective Optimization for Multi-Line and U-Shape Layout of Sewing Assembly Line in Apparel Industry. IEEE Access 7, pages 107188-107200.
Crossref
Maria Manuela Azevedo, José António Crispim & Jorge Pinho de Sousa. (2019) A dynamic multiobjective model for designing machine layouts. IFAC-PapersOnLine 52:13, pages 1896-1901.
Crossref
Ravi Kumar & Surya Prakash Singh. 2019. Advanced Computing and Communication Technologies. Advanced Computing and Communication Technologies
19
33
.
Safiye Turgay. (2018) Multi Objective Simulated Annealing Approach for Facility Layout Design. International Journal of Mathematical, Engineering and Management Sciences 3:4, pages 365-380.
Crossref
Ravi Kumar, Surya Prakash Singh & Kuldeep Lamba. (2018) Sustainable robust layout using Big Data approach: A key towards industry 4.0. Journal of Cleaner Production 204, pages 643-659.
Crossref
Akash Tayal & Surya Prakash Singh. (2016) Integrating big data analytic and hybrid firefly-chaotic simulated annealing approach for facility layout problem. Annals of Operations Research 270:1-2, pages 489-514.
Crossref
Hasan Hosseini-Nasab, Sepideh Fereidouni, Seyyed Mohammad Taghi Fatemi Ghomi & Mohammad Bagher Fakhrzad. (2017) Classification of facility layout problems: a review study. The International Journal of Advanced Manufacturing Technology 94:1-4, pages 957-977.
Crossref
Akash Tayal & Surya Prakash Singh. (2016) Designing Flexible Stochastic Dynamic Layout: An Integrated Firefly and Chaotic Simulated Annealing-Based Approach. Global Journal of Flexible Systems Management 18:2, pages 89-98.
Crossref
Maria Manuela Azevedo, José António Crispim & Jorge Pinho de Sousa. (2017) A dynamic multi-objective approach for the reconfigurable multi-facility layout problem. Journal of Manufacturing Systems 42, pages 140-152.
Crossref
Jiuping XuSiwei ZhaoZongmin LiZiqiang Zeng. (2016) Bilevel Construction Site Layout Optimization Based on Hazardous-Material Transportation. Journal of Infrastructure Systems 22:3.
Crossref
Ashish Saraswat, Uday Venkatadri & Ignacio Castillo. (2015) A framework for multi-objective facility layout design. Computers & Industrial Engineering 90, pages 167-176.
Crossref
Yifei Zhao & Stein W. Wallace. (2015) A heuristic for the single-product capacitated facility layout problem with random demand. EURO Journal on Transportation and Logistics 4:3, pages 379-398.
Crossref
Amirsaman Kheirkhah, Hamidreza Navidi & Masume Messi Bidgoli. (2015) Dynamic Facility Layout Problem: A New Bilevel Formulation and Some Metaheuristic Solution Methods. IEEE Transactions on Engineering Management 62:3, pages 396-410.
Crossref
Rajesh Matai. (2015) Solving multi objective facility layout problem by modified simulated annealing. Applied Mathematics and Computation 261, pages 302-311.
Crossref
Srisatja Vitayasak & Pupong Pongcharoen. 2015. Advances in Swarm and Computational Intelligence. Advances in Swarm and Computational Intelligence
257
265
.
Yifei Zhao & Stein W. Wallace. (2014) Integrated Facility Layout Design and Flow Assignment Problem Under Uncertainty. INFORMS Journal on Computing 26:4, pages 798-808.
Crossref
Kazi Shah Nawaz Ripon & Jim Torresen. (2013) Integrated job shop scheduling and layout planning: a hybrid evolutionary method for optimizing multiple objectives. Evolving Systems 5:2, pages 121-132.
Crossref
Rajesh Matai, S. P. Singh & M. L. Mittal. (2013) A non-greedy systematic neighbourhood search heuristic for solving facility layout problem. The International Journal of Advanced Manufacturing Technology 68:5-8, pages 1665-1675.
Crossref
Li Hui & Qu Shi-you. (2013) Systematic layout planning: A study on coal mine facilities. Systematic layout planning: A study on coal mine facilities.
Seyed Hamid Reza Pasandideh, Seyed Taghi Akhavan Niaki & Vahid Hajipour. (2011) A multi-objective facility location model with batch arrivals: two parameter-tuned meta-heuristic algorithms. Journal of Intelligent Manufacturing 24:2, pages 331-348.
Crossref
A. Hadi-Vencheh & A. Mohamadghasemi. (2013) An integrated AHP–NLP methodology for facility layout design. Journal of Manufacturing Systems 32:1, pages 40-45.
Crossref
Xuhui Li, Gangyan Li, Fei Yang & Guowen Sun. (2012) Research and practice on activity correlation analysis method of planning and designing municipal solid waste transfer and treatment station. Research and practice on activity correlation analysis method of planning and designing municipal solid waste transfer and treatment station.
M. E. Shedeed & S. E. Z. Abdel Barr. (2012) Genetic Algorithm for solving Multi-objective Facility Layout Problem (MOFLP). Genetic Algorithm for solving Multi-objective Facility Layout Problem (MOFLP).
Kazi Shah Nawaz Ripon, Kyrre Glette, Mats Hovin & Jim Torresen. (2012) A multi-objective evolutionary algorithm for solving integrated scheduling and layout planning problems in manufacturing systems. A multi-objective evolutionary algorithm for solving integrated scheduling and layout planning problems in manufacturing systems.
Kazi Ripon, Kyrre Glette, Mats Hovin & Jim Torresen. (2011) Dynamic facility layout problem under uncertainty: a Pareto-optimality based multi-objective evolutionary approach. Open Computer Science 1:4, pages 375-386.
Crossref
Kazi Shah Nawaz Ripon, Kashif Nizam Khan, Kyree Glette, Mats Hovin & Jim Torresen. (2011) Using pareto-optimality for solving multi-objective unequal area facility layout problem. Using pareto-optimality for solving multi-objective unequal area facility layout problem.
Kazi Shah Nawaz Ripon, Kyrre Glette, Mats Høvin & Jim Torresen. 2010. Neural Information Processing. Theory and Algorithms. Neural Information Processing. Theory and Algorithms
642
651
.
Kazi Shah Nawaz Ripon, Kyrre Glette, Mats Høvin & Jim Torresen. 2010. Neural Information Processing. Theory and Algorithms. Neural Information Processing. Theory and Algorithms
540
550
.