414
Views
33
CrossRef citations to date
0
Altmetric
Original Articles

An analytical model for service level and tardiness in a single machine MTO production system

&
Pages 1827-1850 | Received 23 Apr 2009, Accepted 25 Jan 2010, Published online: 12 May 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (10)

Changchun Liu, Haihua Zhu, Dunbing Tang, Qingwei Nie, Shipei Li, Yi Zhang & Xuan Liu. (2023) A transfer learning CNN-LSTM network-based production progress prediction approach in IIoT-enabled manufacturing. International Journal of Production Research 61:12, pages 4045-4068.
Read now
Klaus Altendorfer, Andreas Schober, Johannes Karder & Andreas Beham. (2021) Service level improvement due to worker cross training with stochastic worker absence. International Journal of Production Research 59:14, pages 4416-4433.
Read now
Weiguang Fang, Yu Guo, Wenhe Liao, Karthik Ramani & Shaohua Huang. (2020) Big data driven jobs remaining time prediction in discrete manufacturing system: a deep learning-based approach. International Journal of Production Research 58:9, pages 2751-2766.
Read now
Masoud Rabbani, Razieh Heidari & Hamed Farrokhi-Asl. (2018) A bi-objective mixed-model assembly line sequencing problem considering customer satisfaction and customer buying behaviour. Engineering Optimization 50:12, pages 2123-2142.
Read now
Hamed Rafiei, Masoud Rabbani, Hamed Vafa-Arani & Gholamreza Bodaghi. (2017) Production-inventory analysis of single-station parallel machine make-to-stock/make-to-order system with random demands and lead times. International Journal of Management Science and Engineering Management 12:1, pages 33-44.
Read now
Tadeusz Sawik. (2016) On the risk-averse optimization of service level in a supply chain under disruption risks. International Journal of Production Research 54:1, pages 98-113.
Read now
Masoud Rabbani, Shadi Sadri, Neda Manavizadeh & Hamed Rafiei. (2015) A novel bi-level hierarchy towards available-to-promise in mixed-model assembly line sequencing problems. Engineering Optimization 47:7, pages 947-962.
Read now
Klaus Altendorfer & Stefan Minner. (2014) A comparison of make-to-stock and make-to-order in multi-product manufacturing systems with variable due dates. IIE Transactions 46:3, pages 197-212.
Read now
Chia-Jung Chang, Fu-Min Chang & Jau-Chuan Ke. (2014) Economic application in a Bernoulli F-policy queueing system with server breakdown. International Journal of Production Research 52:3, pages 743-756.
Read now
Klaus Altendorfer & Stefan Minner. (2012) Optimal composition of number and size of machines in a multi-stage make-to-order system with due dates. International Journal of Production Research 50:3, pages 603-621.
Read now

Articles from other publishers (23)

Nadine Bachmann & Herbert Jodlbauer. (2023) Iterative business model innovation: A conceptual process model and tools for incumbents. Journal of Business Research 168, pages 114177.
Crossref
Hao Wang, Tao Peng, Aydin Nassehi & Renzhong Tang. (2023) A data-driven simulation-optimization framework for generating priority dispatching rules in dynamic job shop scheduling with uncertainties. Journal of Manufacturing Systems 70, pages 288-308.
Crossref
Zheyuan Hu, Yi Cheng, Hui Xiong & Xu Zhang. (2023) Assembly makespan estimation using features extracted by a topic model. Knowledge-Based Systems 276, pages 110738.
Crossref
Hao Wang, Tao Peng, Alexandra Brintrup, Thorsten Wuest & Renzhong Tang. 2022. Advances in Production Management Systems. Smart Manufacturing and Logistics Systems: Turning Ideas into Action. Advances in Production Management Systems. Smart Manufacturing and Logistics Systems: Turning Ideas into Action 425 433 .
Lieke R. de Groot & Alexander Hubl. (2021) Developing a Calibrated Discrete Event Simulation Model of Shops of a Dutch Phone and Subscription Retailer During COVID-19 to Evaluate Shift Plans to Reduce Waiting Times. Developing a Calibrated Discrete Event Simulation Model of Shops of a Dutch Phone and Subscription Retailer During COVID-19 to Evaluate Shift Plans to Reduce Waiting Times.
Jing Huang, Qing Chang & Jorge Arinez. (2020) Product Completion Time Prediction Using A Hybrid Approach Combining Deep Learning and System Model. Journal of Manufacturing Systems 57, pages 311-322.
Crossref
F. Tanhaie, M. Rabbani & N. Manavizadeh. (2020) Applying available-to-promise (ATP) concept in mixed-model assembly line sequencing problems in a Make-To-Order (MTO) environment: problem extension, model formulation and Lagrangian relaxation algorithm. OPSEARCH 57:2, pages 320-346.
Crossref
Herbert JodlbauerHerbert Jodlbauer. 2020. Geschäftsmodelle erarbeiten. Geschäftsmodelle erarbeiten 83 215 .
Herbert JodlbauerHerbert Jodlbauer. 2020. Geschäftsmodelle erarbeiten. Geschäftsmodelle erarbeiten 1 58 .
Tadeusz SawikTadeusz Sawik. 2020. Supply Chain Disruption Management. Supply Chain Disruption Management 111 154 .
Kai Li, Wei Xiao & ShanLin Yang. (2019) Minimizing total tardiness on two uniform parallel machines considering a cost constraint. Expert Systems with Applications 123, pages 143-153.
Crossref
Hoda Sabeti & Feng Yang. (2017) Flow-time estimation by synergistically modeling real and simulation data. Flow-time estimation by synergistically modeling real and simulation data.
Miray Öner-Közen & Stefan Minner. (2017) Impact of priority sequencing decisions on on-time probability and expected tardiness of orders in make-to-order production systems with external due-dates. European Journal of Operational Research 263:2, pages 524-539.
Crossref
Tanja Mlinar & Philippe Chevalier. (2016) Pooling heterogeneous products for manufacturing environments. 4OR 14:2, pages 173-200.
Crossref
Alexander Hubl & Klaus Altendorfer. (2015) State probabilities for an M/M/1 queuing system with two capacity levels. State probabilities for an M/M/1 queuing system with two capacity levels.
Klaus Altendorfer. (2015) Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times. International Journal of Production Economics 170, pages 478-488.
Crossref
Minqi Li, Feng Yang, Hong Wan & John W. Fowler. (2015) Simulation-based experimental design and statistical modeling for lead time quotation. Journal of Manufacturing Systems 37, pages 362-374.
Crossref
B. Rostami-Tabar & E. Sahin. (2015) The impact of Advance Demand Information on the Performance of production/inventory systems. IFAC-PapersOnLine 48:3, pages 1744-1749.
Crossref
Klaus AltendorferKlaus Altendorfer. 2014. Capacity and Inventory Planning for Make-to-Order Production Systems. Capacity and Inventory Planning for Make-to-Order Production Systems 19 42 .
Alexander Hübl, Herbert Jodlbauer & Klaus Altendorfer. (2013) Influence of dispatching rules on average production lead time for multi-stage production systems. International Journal of Production Economics 144:2, pages 479-484.
Crossref
Klaus Altendorfer & Stefan Minner. (2011) Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates. European Journal of Operational Research 213:1, pages 134-146.
Crossref
Klaus Altendorfer & Herbert Jodlbauer. (2011) Which utilization and service level lead to the maximum EVA?. International Journal of Production Economics 130:1, pages 16-26.
Crossref
Uta Mohring & Kai Furmans. (2022) Performance Analysis of Multi-Stage Stochastic Order Fulfilment Systems with Levelled Order Release Andorder Deadlines. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.