78
Views
20
CrossRef citations to date
0
Altmetric
Original Articles

A comparison of tool management strategies and part selection rules for a flexible manufacturing system

, &
Pages 733-748 | Received 01 Jan 1991, Published online: 23 Mar 2012

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Matthias Thürer & Mark Stevenson. (2022) Order release, dispatching and resource assignment in multiple resource-constrained job shops: an assessment by simulation. International Journal of Production Research 60:12, pages 3669-3681.
Read now
F. F. CHEN, J.-l. KER & K. KLEAWPATINON. (1995) An effective part-selection model for production planning of flexible manufacturing systems. International Journal of Production Research 33:10, pages 2671-2683.
Read now
M. M. SOLOMON, R-A. MILLEN & P. AFENTAKIS. (1995) The formation of subfamilies for machine loading of flow-line cells. International Journal of Production Research 33:9, pages 2357-2374.
Read now

Articles from other publishers (17)

A. Kusiak & M. BielliM. Calderini, M. Cantamessa & Vincenzo Nicolò. 2021. Designing Innovations in Industrial Logistics Modelling. Designing Innovations in Industrial Logistics Modelling 123 166 .
T. Prabaharan, P.R. Nakkeeran & N. Jawahar. (2006) Sequencing and scheduling of job and tool in a flexible manufacturing cell. The International Journal of Advanced Manufacturing Technology 29:7-8, pages 729-745.
Crossref
Bing-Hai Zhou, Li-Feng Xi & Yong-Shang Cao. (2004) A beam-search-based algorithm for the tool switching problem on a flexible machine. The International Journal of Advanced Manufacturing Technology 25:9-10, pages 876-882.
Crossref
Mustafa Özbayrak & Robert Bell. (2003) A knowledge-based decision support system for the management of parts and tools in FMS. Decision Support Systems 35:4, pages 487-515.
Crossref
Choong Soo Lee, Sung Shick Kim & Jung Sang Choi. (2003) Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation. Computers & Industrial Engineering 45:1, pages 61-73.
Crossref
M özbayrak, R B R De Souza & R Bell. (2005) Design of a tool management system for a flexible machining facility. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 215:3, pages 353-370.
Crossref
Patrick H. Liu. (2000) A comparative study of three tool replacement/operation sequencing strategies in a flexible manufacturing system. Naval Research Logistics 47:6, pages 479-499.
Crossref
M. Braglia, A. Zanibelli & E. Gentili. (1997) Tool Machine Allocation Problem in a Cellular Manufacturing System. IFAC Proceedings Volumes 30:14, pages 375-380.
Crossref
Selcuk Avci & M.Selim Akturk. (1996) Tool magazine arrangement and operations sequencing on CNC machines. Computers & Operations Research 23:11, pages 1069-1081.
Crossref
P Coleman, M Ozbayrak & R Bell. (2016) Tool Management and Job Allocation in Flexible Machining Cells Part 1: Work-Oriented Strategies. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 210:5, pages 405-415.
Crossref
K. Raghava Rau & O. V. Krishnaiah Chetty. (1996) Production planning of FMS under tool magazine constraints: A dynamic programming approach. The International Journal of Advanced Manufacturing Technology 11:5, pages 366-371.
Crossref
Kwasi Amoako-Gyampah & Jack R. Meredith. (1996) A simulation study of FMS tool allocation procedures. Journal of Manufacturing Systems 15:6, pages 419-431.
Crossref
K. Kato. (1995) An integrated approach for loading, routeing, and scheduling in flexible manufacturing systems. An integrated approach for loading, routeing, and scheduling in flexible manufacturing systems.
B.P. Bandyopadhyay, T. Hoshi, M.A. Latief & T. Hanada. (1993) Development of a fixture-free machining center for machining block-like components. Journal of Materials Processing Technology 39:3-4, pages 405-413.
Crossref
K. Kato, F. Oba & F. Hashimoto. (1993) A GT-based heuristic approach for machine loading and batch formation in flexible manufacturing systems. Control Engineering Practice 1:5, pages 845-850.
Crossref
K. Kato, F. Oba & F. Hashimoto. (1993) Heuristics based integrated design environment for planning and scheduling in FMS. Heuristics based integrated design environment for planning and scheduling in FMS.
K. Kato, F. Oba & F. Hashimoto. (1992) GT Based Heuristic Approach for Machine Loading and Batch Formation in Flexible Manufacturing Systems. IFAC Proceedings Volumes 25:31, pages 109-114.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.