42
Views
25
CrossRef citations to date
0
Altmetric
Original Articles

A splitting-up approach to simplify job-shop scheduling problems

, &
Pages 859-870 | Received 01 Jun 1991, Published online: 23 Mar 2012

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Marzieh Khakifirooz, Michel Fathi, Alexandre Dolgui & Panos M. Pardalos. (2023) Scheduling in Industrial environment toward future: insights from Jean-Marie Proth. International Journal of Production Research 0:0, pages 1-27.
Read now
Rui Zhang & Cheng Wu. (2010) A divide-and-conquer strategy with particle swarm optimization for the job shop scheduling problem. Engineering Optimization 42:7, pages 641-670.
Read now
D. SUN & R. BATTA‡. (1996) Scheduling larger job shops: a decomposition approach. International Journal of Production Research 34:7, pages 2019-2033.
Read now
Marie Luce Levy, Pierre Lopez & Bernard Pradin. (1996) A decomposition approach for the single—machine scheduling problem. Journal of Decision Systems 5:1-2, pages 73-94.
Read now
C. THURIOT, J. ERSCHLER & P. LOPEZ. (1994) Decision approach to workload distribution. Production Planning & Control 5:6, pages 533-542.
Read now

Articles from other publishers (20)

Shuilin Chen & Jianguo Zheng. (2023) Hybrid grey wolf optimizer for solving permutation flow shop scheduling problem. Concurrency and Computation: Practice and Experience.
Crossref
Yang Li, Xinyu Li & Liang Gao. (2023) An Effective Solution Space Clipping-Based Algorithm for Large-Scale Permutation Flow Shop Scheduling Problem. IEEE Transactions on Systems, Man, and Cybernetics: Systems 53:1, pages 635-646.
Crossref
Cuiyu Wang, Li Zhao, Xinyu Li & Yang Li. (2022) An improved grey wolf optimizer for welding shop inverse scheduling. Computers & Industrial Engineering 163, pages 107809.
Crossref
Xianglong Huang. (2021) Research on Chemical Process Control Strategy Based on Petri Net. Research on Chemical Process Control Strategy Based on Petri Net.
Feng Wang, Jie Lin & Xiao-hua Liu. (2008) Model of job shop scheduling based on graph theory and combination of machines. Model of job shop scheduling based on graph theory and combination of machines.
Min Liu, Jing-Hua Hao & Cheng Wu. (2008) A prediction based iterative decomposition algorithm for scheduling large-scale job shops. Mathematical and Computer Modelling 47:3-4, pages 411-421.
Crossref
Cyril Briand, H. Trung La & Jacques Erschler. (2007) A robust approach for the single machine scheduling problem. Journal of Scheduling 10:3, pages 209-221.
Crossref
. 2007. Handbook on Scheduling. Handbook on Scheduling 345 396 .
G.A. Rovithakis, S.E. Perrakis & M.A. Christodoulou. (2001) Application of a neural-network scheduler on a real manufacturing system. IEEE Transactions on Control Systems Technology 9:2, pages 261-270.
Crossref
Jacek Błażewicz, Klaus H. Ecker, Erwin Pesch, Günter Schmidt & Jan WęglarzJacek Błażewicz, Klaus H. Ecker, Erwin Pesch, Günter Schmidt & Jan Węglarz. 2001. Scheduling Computer and Manufacturing Processes. Scheduling Computer and Manufacturing Processes 273 315 .
A.S. Jain & S. Meeran. (1999) Deterministic job-shop scheduling: Past, present and future. European Journal of Operational Research 113:2, pages 390-434.
Crossref
Besoa Rabenasolo, Xianyi Zeng & Michel Happiette. (1998) Analysis of the temporal decomposition procedure for scheduling with release and due dates. European Journal of Operational Research 109:3, pages 599-619.
Crossref
M.-C. Portmann. 1996. The Planning and Scheduling of Production Systems. The Planning and Scheduling of Production Systems 271 300 .
Jacek Błażewicz, Wolfgang Domschke & Erwin Pesch. (1996) The job shop scheduling problem: Conventional and new solution techniques. European Journal of Operational Research 93:1, pages 1-33.
Crossref
Jacek Błażewicz, Klaus H. Ecker, Erwin Pesch, Günter Schmidt & Jan WęglarzJacek Błażewicz, Klaus H. Ecker, Erwin Pesch, Günter Schmidt & Jan Węglarz. 1996. Scheduling Computer and Manufacturing Processes. Scheduling Computer and Manufacturing Processes 275 317 .
Oscar Ciro Lopez, Ricardo M. Barcia & Osama Eyada. (1995) Problema de programação da produção um esquema de classificação. Production 5:2, pages 145-168.
Crossref
MengChu Zhou, Hua-Sheng Chiu & H.H. Xiong. (1995) Petri net scheduling of FMS using branch and bound method. Petri net scheduling of FMS using branch and bound method.
F.G. Filip & G. Neagu. (1993) CIM in continuous and discrete manufacturing: Object-oriented generic modelling. Control Engineering Practice 1:5, pages 815-825.
Crossref
Gotha. (2011) Les problèmes d'ordonnancement. RAIRO - Operations Research 27:1, pages 77-150.
Crossref
F.G. Filip & G. Neagu. (1992) CIM in Continuous and Discrete Manufacturing: Object-Oriented Generic Modelling. IFAC Proceedings Volumes 25:31, pages 53-58.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.